|
|
REMOVING CONC (RIPRAP)
|
CY
|
39.000
|
$15.000
|
$46.500
|
$300.000
|
$63.600
|
$57.770
|
$142.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,731.000
|
$15.000
|
$15.750
|
$20.000
|
$18.000
|
$22.280
|
$30.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
545.000
|
$900.000
|
$1,150.000
|
$600.000
|
$500.000
|
$542.800
|
$1,000.000
|
|
|
BACKFILL (TY B)
|
STA
|
545.000
|
$150.000
|
$140.000
|
$70.000
|
$240.000
|
$168.840
|
$150.000
|
|
|
BLADING
|
HR
|
50.000
|
$500.000
|
$350.000
|
$137.000
|
$180.000
|
$156.140
|
$301.960
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
334,566.000
|
$0.200
|
$0.120
|
$0.110
|
$0.140
|
$0.100
|
$0.150
|
|
|
PROOF ROLLING
|
HR
|
50.000
|
$500.000
|
$150.000
|
$72.000
|
$180.000
|
$135.490
|
$118.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
11,453.000
|
$11.000
|
$16.500
|
$11.000
|
$7.750
|
$17.780
|
$18.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(5")
|
SY
|
115,760.000
|
$7.500
|
$8.400
|
$10.000
|
$6.480
|
$8.590
|
$9.500
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
165,716.000
|
$1.000
|
$0.700
|
$2.000
|
$0.900
|
$1.370
|
$1.500
|
|
|
PRIME COAT (AE-P)
|
GAL
|
58,134.000
|
$3.500
|
$3.810
|
$4.000
|
$4.280
|
$5.120
|
$5.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
9,223.000
|
$4.000
|
$5.340
|
$4.000
|
$4.680
|
$3.950
|
$4.000
|
|
|
SUPERPAVE MIXTURES SP- B SAC-B PG70-22
|
TON
|
124,551.000
|
$80.000
|
$85.000
|
$82.000
|
$83.620
|
$91.930
|
$88.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
14,624.000
|
$70.000
|
$61.750
|
$100.000
|
$89.190
|
$88.000
|
$79.000
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
1,179.000
|
$560.000
|
$635.000
|
$100.000
|
$711.160
|
$650.000
|
$900.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
52,390.000
|
$3.500
|
$1.480
|
$2.000
|
$3.620
|
$3.100
|
$1.250
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
113,326.000
|
$3.750
|
$1.700
|
$3.000
|
$3.640
|
$3.170
|
$1.500
|
|
|
CEM STABIL BKFL
|
CY
|
14.290
|
$200.000
|
$322.300
|
$300.000
|
$337.700
|
$334.630
|
$456.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
72.820
|
$950.000
|
$919.600
|
$600.000
|
$964.700
|
$955.930
|
$833.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
25.000
|
$70.000
|
$73.700
|
$50.000
|
$78.100
|
$77.390
|
$152.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
136.000
|
$85.000
|
$93.500
|
$60.000
|
$97.900
|
$97.010
|
$142.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
75.000
|
$100.000
|
$106.700
|
$69.000
|
$112.200
|
$111.180
|
$171.000
|
|
|
SET (TY II) (12 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$1,144.000
|
$2,000.000
|
$1,199.000
|
$1,188.100
|
$1,638.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
16.000
|
$2,500.000
|
$1,243.000
|
$2,100.000
|
$1,309.000
|
$1,297.100
|
$1,856.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
10.000
|
$3,000.000
|
$1,496.000
|
$2,500.000
|
$1,562.000
|
$1,547.800
|
$2,034.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,000.000
|
$1,276.000
|
$2,000.000
|
$1,338.000
|
$4,596.530
|
$9,797.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,000.000
|
$1,067.000
|
$2,700.000
|
$1,122.000
|
$1,111.800
|
$634.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,084,495.000
|
$700,000.000
|
$1,687,991.560
|
$1,263,407.850
|
$751,158.970
|
$1,900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$7,000.000
|
$5,500.000
|
$8,000.000
|
$35,044.420
|
$10,000.000
|
$5,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
840.000
|
$15.000
|
$11.000
|
$5.000
|
$9.600
|
$5.340
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
840.000
|
$5.000
|
$4.000
|
$1.000
|
$3.600
|
$1.460
|
$0.700
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
110,022.000
|
$0.200
|
$0.130
|
$0.120
|
$0.140
|
$0.130
|
$0.140
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
55,011.000
|
$0.250
|
$0.190
|
$0.120
|
$0.140
|
$0.190
|
$0.140
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
13.000
|
$350.000
|
$387.200
|
$350.000
|
$236.500
|
$383.680
|
$305.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
3.000
|
$450.000
|
$429.000
|
$420.000
|
$275.000
|
$425.100
|
$305.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$500.000
|
$594.000
|
$700.000
|
$451.000
|
$588.600
|
$463.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
20.000
|
$7.000
|
$27.500
|
$15.000
|
$60.000
|
$27.250
|
$10.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
16.000
|
$30.000
|
$66.000
|
$35.000
|
$66.000
|
$65.400
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
70.000
|
$700.000
|
$753.500
|
$700.000
|
$555.500
|
$746.650
|
$646.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$750.000
|
$847.000
|
$830.000
|
$665.500
|
$839.300
|
$744.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,150.000
|
$979.000
|
$996.000
|
$797.500
|
$970.100
|
$780.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,300.000
|
$1,045.000
|
$1,106.000
|
$885.500
|
$1,035.500
|
$926.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$650.000
|
$660.000
|
$687.000
|
$550.000
|
$654.000
|
$487.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$200.000
|
$55.000
|
$125.000
|
$99.000
|
$103.630
|
$98.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
20.000
|
$150.000
|
$66.000
|
$70.000
|
$55.000
|
$65.400
|
$92.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
217,980.000
|
$0.250
|
$0.130
|
$0.150
|
$0.120
|
$0.130
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,230.000
|
$1.000
|
$0.550
|
$0.150
|
$0.120
|
$0.550
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
130.000
|
$6.000
|
$11.000
|
$4.000
|
$2.970
|
$10.900
|
$3.800
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
21,881.000
|
$0.250
|
$0.170
|
$0.150
|
$0.120
|
$0.160
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
66,044.000
|
$0.250
|
$0.170
|
$0.150
|
$0.120
|
$0.160
|
$0.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
362.000
|
$2.250
|
$1.500
|
$2.000
|
$4.150
|
$1.890
|
$2.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
14,624.000
|
$2.000
|
$1.500
|
$1.000
|
$2.250
|
$1.890
|
$2.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,370.000
|
$5.000
|
$0.940
|
$1.250
|
$1.050
|
$0.930
|
$0.750
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
109,970.000
|
$1.000
|
$0.880
|
$1.000
|
$0.720
|
$0.870
|
$0.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
10,808.000
|
$1.000
|
$1.050
|
$1.000
|
$0.720
|
$1.040
|
$0.600
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
36,325.000
|
$1.000
|
$0.880
|
$1.000
|
$0.720
|
$0.870
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
215.000
|
$17.000
|
$17.600
|
$20.000
|
$17.330
|
$17.440
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
7.000
|
$225.000
|
$220.000
|
$265.000
|
$220.000
|
$218.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$275.000
|
$286.000
|
$330.000
|
$275.000
|
$283.400
|
$260.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
26.000
|
$3.500
|
$11.000
|
$6.000
|
$5.500
|
$10.900
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,358.000
|
$3.000
|
$3.300
|
$6.000
|
$5.500
|
$3.270
|
$3.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$5,000.000
|
$8,250.000
|
$4,000.000
|
$5,500.000
|
$8,175.000
|
$3,400.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
110,080.000
|
$3.000
|
$1.690
|
$2.000
|
$1.800
|
$1.430
|
$3.000
|
|
|
BONDING COURSESE
|
GAL
|
32,619.000
|
$3.000
|
$3.250
|
$4.000
|
$5.230
|
$4.710
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$16,000.000
|
$18,000.000
|
$20,000.000
|
$19,800.000
|
$11,738.060
|
$20,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,000.000
|
$8,250.000
|
$10,000.000
|
$11,000.000
|
$10,286.180
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
6.000
|
$20,000.000
|
$15,000.000
|
$16,000.000
|
$27,500.000
|
$20,820.330
|
$5,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
496.000
|
$70.000
|
$25.000
|
$77.000
|
$110.000
|
$70.310
|
$72.000
|
|
Totals: |
$16,938,618.600
|
$16,701,304.919
|
$17,591,120.530
|
$18,149,021.467
|
$18,349,743.425
|
$19,303,479.840
|