|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
3,494.000
|
$14.000
|
$7.800
|
$8.000
|
$14.120
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
515.000
|
$39.850
|
$71.800
|
$40.000
|
$100.220
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
44.000
|
$1,400.000
|
$898.970
|
$1,400.000
|
$1,914.900
|
|
|
BACKFILL (TY A)
|
STA
|
733.000
|
$567.380
|
$230.750
|
$270.000
|
$415.390
|
|
|
BLADING
|
HR
|
20.000
|
$330.000
|
$176.970
|
$400.000
|
$425.470
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$165.000
|
$154.560
|
$200.000
|
$170.170
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
3,494.000
|
$23.000
|
$33.050
|
$40.000
|
$30.320
|
|
|
PRIME COAT (AE-P)
|
GAL
|
73,820.000
|
$4.890
|
$5.730
|
$5.000
|
$5.060
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
1,926.000
|
$7.000
|
$6.870
|
$15.000
|
$6.780
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
75,095.000
|
$5.200
|
$4.890
|
$10.000
|
$4.900
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
1,797.000
|
$158.000
|
$255.250
|
$310.000
|
$164.160
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,949.000
|
$77.000
|
$71.310
|
$115.500
|
$99.160
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
1,732.000
|
$12.330
|
$31.620
|
$10.000
|
$16.080
|
|
|
CL A CONC (MISC)
|
CY
|
10.000
|
$1,200.000
|
$2,750.000
|
$4,500.000
|
$3,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,800.000
|
$4,400.000
|
$6,500.000
|
$4,800.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$4,675.000
|
$7,000.000
|
$5,100.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
31.000
|
$3,200.000
|
$3,850.000
|
$6,000.000
|
$4,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,546,392.000
|
$1,401,638.180
|
$2,198,000.000
|
$2,550,750.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$20,000.000
|
$70,000.000
|
$50,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,820.000
|
$13.000
|
$7.350
|
$12.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,820.000
|
$3.000
|
$2.300
|
$5.000
|
$5.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
119,706.000
|
$0.180
|
$0.180
|
$0.250
|
$0.190
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
8,965.000
|
$28.000
|
$22.610
|
$35.000
|
$29.400
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$6,250.000
|
$8,024.500
|
$11,100.000
|
$4.800
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
405.000
|
$40.000
|
$45.100
|
$65.000
|
$49.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
108.000
|
$1,086.000
|
$942.700
|
$1,300.000
|
$1,028.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
86.000
|
$1,086.000
|
$1,027.400
|
$1,425.000
|
$1,120.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
17.000
|
$1,333.500
|
$1,360.700
|
$1,900.000
|
$1,484.400
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
211.000
|
$200.000
|
$182.730
|
$210.000
|
$230.720
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
87.000
|
$35.000
|
$100.820
|
$40.000
|
$53.040
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
79.000
|
$170.000
|
$86.900
|
$120.000
|
$94.800
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
|
EA
|
15.000
|
$95.000
|
$86.900
|
$120.000
|
$94.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
70,458.000
|
$0.200
|
$0.180
|
$0.250
|
$0.190
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
69,354.000
|
$0.170
|
$0.180
|
$0.250
|
$0.190
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
74,608.000
|
$0.880
|
$1.000
|
$0.700
|
$2.880
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
31,097.000
|
$0.770
|
$1.000
|
$1.000
|
$2.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
23,868.000
|
$1.560
|
$1.320
|
$2.000
|
$1.440
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
64.000
|
$60.000
|
$27.500
|
$40.000
|
$30.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
18,312.000
|
$0.930
|
$0.530
|
$1.000
|
$0.580
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
70,498.000
|
$0.770
|
$0.530
|
$1.000
|
$0.580
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
69,394.000
|
$0.740
|
$0.530
|
$1.000
|
$0.580
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
575.000
|
$17.000
|
$15.400
|
$25.000
|
$16.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
93.000
|
$280.420
|
$275.000
|
$380.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
20.000
|
$735.000
|
$572.000
|
$790.000
|
$624.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
54.000
|
$360.000
|
$308.000
|
$430.000
|
$336.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
769.000
|
$230.000
|
$194.140
|
$255.000
|
$203.530
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
30,753.000
|
$183.490
|
$195.500
|
$243.000
|
$181.290
|
|
|
BONDING COURSE
|
GAL
|
47,995.000
|
$4.500
|
$4.670
|
$8.000
|
$4.620
|
|
|
CEMENT
|
TON
|
1,772.000
|
$233.170
|
$386.880
|
$280.000
|
$900.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
5,007.000
|
$775.000
|
$826.860
|
$700.000
|
$1,380.000
|
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
197,616.000
|
$5.200
|
$7.440
|
$8.000
|
$13.240
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$25,000.000
|
$9,610.260
|
$11,000.000
|
$26,250.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$15,000.000
|
$18,534.070
|
$11,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$300.000
|
$397.910
|
$235.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
140.000
|
$95.000
|
$562.350
|
$750.000
|
$1,275.000
|
|
|
REMOVE & REPLACE DELINEATOR/OBJ. MARKER
|
EA
|
23.000
|
$28.000
|
$141.330
|
$600.000
|
$240.000
|
|
Totals: |
$17,010,312.970
|
$18,181,464.700
|
$21,994,180.600
|
$24,843,752.170
|