|
|
PREPARING ROW
|
STA
|
63.000
|
$2,200.000
|
$430.000
|
$1,056.690
|
$875.000
|
$3,650.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
4,291.000
|
$10.000
|
$4.750
|
$3.260
|
$6.950
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,608.000
|
$13.500
|
$14.500
|
$7.750
|
$12.750
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
9,688.000
|
$10.000
|
$14.000
|
$5.270
|
$17.400
|
$30.000
|
|
|
BLADING
|
HR
|
20.000
|
$300.000
|
$375.000
|
$192.600
|
$365.000
|
$250.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$158.000
|
$125.000
|
$104.030
|
$88.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
189.000
|
$12.700
|
$65.000
|
$10.250
|
$13.950
|
$22.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
11,476.000
|
$15.000
|
$12.450
|
$10.250
|
$9.950
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(15")
|
SY
|
18,327.000
|
$17.000
|
$15.700
|
$14.870
|
$13.650
|
$33.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
5,967.000
|
$3.000
|
$2.370
|
$3.410
|
$10.600
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
25,000.000
|
$5.000
|
$3.240
|
$3.850
|
$3.700
|
$6.000
|
|
|
ASPH (RC-250)
|
GAL
|
4,629.000
|
$4.660
|
$3.820
|
$4.510
|
$5.100
|
$6.000
|
|
|
AGGR(TY-PB GR-2 SAC-A)
|
CY
|
265.000
|
$103.000
|
$115.500
|
$111.100
|
$215.800
|
$350.000
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
231.000
|
$115.000
|
$129.000
|
$111.100
|
$235.100
|
$350.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
170.000
|
$100.000
|
$159.000
|
$111.100
|
$223.850
|
$350.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
148.000
|
$90.000
|
$87.250
|
$111.100
|
$244.800
|
$350.000
|
|
|
SUPERPAVE MIXTURES SP-B SAC-A PG70-22
|
TON
|
1,395.000
|
$120.000
|
$91.000
|
$151.780
|
$119.000
|
$200.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
1,232.000
|
$120.000
|
$112.000
|
$151.790
|
$136.550
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
33.000
|
$245.000
|
$273.000
|
$286.000
|
$361.000
|
$350.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
33.000
|
$120.000
|
$324.450
|
$339.900
|
$711.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$485.000
|
$840.000
|
$910.800
|
$670.000
|
$850.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
63.000
|
$475.000
|
$339.150
|
$355.300
|
$456.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
116.000
|
$120.000
|
$103.950
|
$108.900
|
$123.750
|
$105.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$7,705.000
|
$7,812.000
|
$8,184.000
|
$7,525.000
|
$12,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$3,200.000
|
$2,436.000
|
$2,552.000
|
$2,400.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,052.000
|
$105,000.590
|
$354,705.270
|
$270,350.050
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$4,461.000
|
$6,174.160
|
$10,845.000
|
$5,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
360.000
|
$10.000
|
$6.000
|
$6.600
|
$4.450
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
360.000
|
$2.000
|
$3.000
|
$2.400
|
$0.600
|
$10.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,452.000
|
$35.000
|
$28.500
|
$22.570
|
$23.550
|
$40.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$20.000
|
$25.000
|
$26.190
|
$13.000
|
$26.500
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
2.000
|
$2,500.000
|
$3,043.950
|
$3,188.900
|
$1,538.900
|
$3,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
513.000
|
$7.000
|
$8.400
|
$22.000
|
$8.800
|
$25.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$1,000.000
|
$1,050.000
|
$1,072.500
|
$1,100.000
|
$850.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
138.000
|
$25.000
|
$31.500
|
$28.050
|
$33.000
|
$35.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$672.000
|
$787.500
|
$990.000
|
$825.000
|
$950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$125.000
|
$125.100
|
$110.000
|
$87.250
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$102.000
|
$115.500
|
$82.500
|
$121.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,703.000
|
$0.200
|
$0.170
|
$0.330
|
$0.180
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
26,101.000
|
$0.200
|
$0.150
|
$0.330
|
$0.160
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
54.000
|
$1.420
|
$1.000
|
$2.200
|
$4.150
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
800.000
|
$1.330
|
$1.000
|
$2.200
|
$2.800
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,703.000
|
$0.720
|
$0.790
|
$0.990
|
$0.830
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
11,999.000
|
$0.250
|
$0.300
|
$0.500
|
$0.320
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
18,141.000
|
$0.300
|
$0.300
|
$0.500
|
$0.320
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
108.000
|
$17.260
|
$14.700
|
$26.400
|
$15.400
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$240.000
|
$231.000
|
$407.000
|
$242.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$330.000
|
$252.000
|
$583.000
|
$264.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$44.000
|
$26.250
|
$50.050
|
$27.500
|
$350.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
178.000
|
$3.500
|
$3.150
|
$3.300
|
$3.300
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
402.000
|
$3.000
|
$2.890
|
$3.300
|
$3.030
|
$15.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$258.000
|
$262.500
|
$330.000
|
$275.000
|
$350.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$250.000
|
$262.500
|
$330.000
|
$275.000
|
$350.000
|
|
|
BACK PLATE (12")(1 SEC)(VENTED)ALUM
|
EA
|
16.000
|
$258.000
|
$99.750
|
$82.500
|
$104.500
|
$250.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
594.000
|
$2.500
|
$2.630
|
$3.300
|
$2.750
|
$3.500
|
|
|
TRF SIG CBL (TY A)(8 AWG)(4 CONDR)
|
LF
|
111.000
|
$4.450
|
$5.250
|
$6.600
|
$5.500
|
$3.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
8.000
|
$9,000.000
|
$9,712.500
|
$9,735.000
|
$10,175.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,000.000
|
$10,125.000
|
$15,400.000
|
$11,075.000
|
$12,500.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
3.000
|
$10,800.000
|
$6,750.000
|
$9,900.000
|
$1,345.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$4,000.000
|
$16,200.000
|
$9,000.000
|
$34,505.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$100.000
|
$135.000
|
$134.030
|
$25.000
|
$550.000
|
|
Totals: |
$2,345,451.160
|
$1,899,899.890
|
$2,152,406.980
|
$2,363,343.000
|
$3,854,776.500
|