Bid Cobra

EL PASO SH 20 (0001-01-075)

Items: 25

County: EL PASO
Length: 0.0000 MILES (64.8098 MILES)
Highway: SH 20
District: EL PASO
Control Number: 0001-01-075
DBE Goal: 0.0%
Project: STP 2027(089)HES
Guaranty: $76,000.00
Time: 173 WORKING DAYS
Engineer's Estimate: $3,804,564.00
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263214
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206587
Contract Type: FEDERAL
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,804,564.00
Over/Under Est: -4.78% -$181,852.25
Over/Under Est: -0.83% -$31,426.13
Amt Left: 4.15% $150,426.12
Over/Under Est: 1.52% $58,006.25
Amt Left: 6.62% $239,858.50
Delta: -2.37% -$89,432.38
Over/Under Est: 5.74% $218,502.00
Amt Left: 11.05% $400,354.25
Delta: -4.16% -$160,495.75
Over/Under Est: 25.26% $960,905.80
Amt Left: 31.54% $1,142,758.05
Delta: -18.45% -$742,403.80

Bid Items & Bid Tabulations

25 Total 0 of 25
EL PASO  |  SH 20  |  EL PASO  |  0001-01-075  |  09/03/2026 1:00 PM CDT  |  $3,804,564.00  |  STP 2027(089)HES  |  HAZARD ELIM & SAFETY  |  173 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
TRI STATE ELECTRIC, LTD.
EL PASO A.R.C. ELECTRIC, INC.
SELECT MAINTENANCE, L.L.C.
MARTINEZ BROS. CONTRACTORS, LLC
MOBILIZATION
LS 1.000 $336,780.000 $250,000.000 $75,000.000 $25,000.000 $395,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $4,000.000 $15,000.000 $12,500.000 $39,500.000 $11,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 16.000 $130.000 $500.000 $95.000 $65.000 $1,000.000 $279.450
TMA (STATIONARY)
DAY 156.000 $300.000 $169.000 $250.000 $290.000 $600.000 $488.750
CONDUIT (PREPARE)
LF 24,560.000 $2.000 $1.600 $1.720 $5.000 $1.250 $6.900
ALUMINUM SIGNS (TY A)
SF 11,294.000 $35.000 $112.000 $100.360 $60.000 $45.000 $116.150
REMOVING TRAFFIC SIGNALS
EA 132.000 $2,530.000 $450.000 $482.570 $5,000.000 $3,500.000 $1,840.000
VEH SIG SEC (12")LED(GRN)
EA 803.000 $412.000 $345.000 $399.220 $350.000 $385.000 $460.000
VEH SIG SEC (12")LED(GRN ARW)
EA 195.000 $415.000 $345.000 $399.220 $360.000 $385.000 $494.500
VEH SIG SEC (12")LED(YEL)
EA 881.000 $402.000 $345.000 $399.220 $350.000 $385.000 $460.000
VEH SIG SEC (12")LED(YEL ARW)
EA 218.000 $396.000 $345.000 $399.220 $360.000 $385.000 $494.500
VEH SIG SEC (12")LED(RED)
EA 841.000 $401.000 $345.000 $399.220 $350.000 $385.000 $460.000
VEH SIG SEC (12")LED(RED ARW)
EA 134.000 $398.000 $345.000 $375.000 $360.000 $385.000 $494.500
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 1,161.000 $187.000 $175.000 $156.710 $240.000 $225.000 $207.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 123.000 $236.000 $185.000 $211.710 $295.000 $225.000 $287.500
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 7.000 $240.000 $200.000 $228.210 $300.000 $500.000 $310.500
BACKPLATE W/REFL BRDR (1SEC)(WENT)ALUM
EA 39.000 $147.000 $140.000 $196.000 $140.000 $225.000 $172.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 405.000 $3.000 $2.750 $5.900 $3.400 $2.200 $5.750
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 375.000 $4.000 $3.400 $6.980 $4.150 $3.000 $8.050
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 78,780.000 $3.000 $2.250 $2.390 $2.900 $2.000 $4.025
PED DETECT PUSH BUTTON (APS)
EA 316.000 $1,022.000 $700.000 $970.080 $800.000 $840.000 $1,092.500
PED DETECTOR CONTROLLER UNIT
EA 36.000 $3,785.000 $3,400.000 $3,462.720 $4,000.000 $2,800.000 $4,600.000
REPLACE OF SIGNAL HEAD ASSM
EA 175.000 $120.000 $225.000 $551.000 $200.000 $300.000 $345.000
BBU SYSTEM (STAND-ALONE BATT CABINET)
EA 1.000 $1,145.000 $8,250.000 $9,007.720 $10,000.000 $15,000.000 $10,925.000
GROUND BOX (PREPARE)
EA 259.000 $1,250.000 $275.000 $378.000 $500.000 $175.000 $287.500
Totals: $3,804,564.000 $3,622,711.750 $3,773,137.870 $3,862,570.250 $4,023,066.000 $4,765,469.800
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $20,000.00