PREPARING ROW
|
STA
|
180.000
|
$1,000.000
|
$250.000
|
$350.000
|
$5,500.000
|
$1,000.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
319.000
|
$10.000
|
$16.000
|
$25.000
|
$162.000
|
$12.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
324.000
|
$12.000
|
$16.000
|
$25.000
|
$92.000
|
$11.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
776.000
|
$12.000
|
$13.000
|
$25.000
|
$26.000
|
$10.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
64,808.000
|
$4.900
|
$1.300
|
$3.000
|
$2.500
|
$2.250
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
60.000
|
$7.000
|
$13.000
|
$4.000
|
$8.500
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
2,300.000
|
$4.000
|
$2.000
|
$2.000
|
$0.700
|
$1.250
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
3,839.000
|
$4.000
|
$3.000
|
$3.000
|
$2.300
|
$3.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
350.000
|
$12.000
|
$12.000
|
$5.000
|
$7.400
|
$5.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
206,784.000
|
$1.500
|
$3.000
|
$3.000
|
$4.000
|
$4.500
|
|
|
EMBANKMENT (ORIGINAL)(DENS CONT)(TY B)
|
CY
|
900.000
|
$13.000
|
$20.000
|
$40.000
|
$1.000
|
$25.000
|
|
|
VEGETATION BARRIER
|
SY
|
408.000
|
$1.150
|
$3.000
|
$4.000
|
$7.000
|
$3.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$108.000
|
$80.000
|
$80.000
|
$68.000
|
$80.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
63,565.000
|
$3.000
|
$6.000
|
$4.000
|
$11.100
|
$3.650
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
90,553.000
|
$73.500
|
$61.750
|
$63.000
|
$63.500
|
$78.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
23,749.000
|
$68.000
|
$73.000
|
$66.000
|
$66.000
|
$85.000
|
|
|
TACK COAT
|
GAL
|
62,313.000
|
$2.550
|
$4.000
|
$4.000
|
$4.500
|
$3.250
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
206,784.000
|
$2.000
|
$1.000
|
$1.600
|
$0.640
|
$1.100
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
900.000
|
$20.000
|
$18.000
|
$18.000
|
$2.500
|
$13.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
500.000
|
$3.000
|
$6.000
|
$7.000
|
$12.600
|
$3.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
450.000
|
$235.000
|
$285.000
|
$375.000
|
$360.000
|
$400.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
2.000
|
$7,500.000
|
$14,000.000
|
$14,000.000
|
$16,000.000
|
$14,000.000
|
|
|
INLET (COMPL)(TY 1)(SPL)
|
EA
|
3.000
|
$6,500.000
|
$6,800.000
|
$30,000.000
|
$14,000.000
|
$8,600.000
|
|
|
INLET(COMPL)(CURB)(SPL)
|
EA
|
2.000
|
$7,000.000
|
$6,800.000
|
$35,000.000
|
$65,000.000
|
$9,300.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,000.000
|
$350.000
|
$800.000
|
$600.000
|
$700.000
|
|
|
ADJUSTING INLETS
|
EA
|
6.000
|
$1,853.710
|
$350.000
|
$900.000
|
$2,500.000
|
$1,800.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
41.000
|
$1,536.540
|
$250.000
|
$450.000
|
$700.000
|
$1,200.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
43.000
|
$550.000
|
$260.000
|
$450.000
|
$590.000
|
$600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$361,560.870
|
$577,000.000
|
$750,000.000
|
$750,000.000
|
$1,080,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
$26,700.000
|
$19,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
890.000
|
$22.000
|
$15.000
|
$15.000
|
$1.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,805.000
|
$7.000
|
$5.000
|
$3.000
|
$1.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
130.000
|
$8.000
|
$8.000
|
$5.000
|
$5.700
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
130.000
|
$1.500
|
$6.500
|
$0.500
|
$3.200
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
10,460.000
|
$7.500
|
$7.500
|
$5.000
|
$5.000
|
$8.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$15.000
|
$23.000
|
$5.000
|
$15.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
80,520.000
|
$5.000
|
$2.500
|
$2.500
|
$1.200
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
640.000
|
$7.000
|
$3.500
|
$2.500
|
$3.000
|
$7.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
10,460.000
|
$5.000
|
$6.000
|
$4.000
|
$5.000
|
$8.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$5.500
|
$3.500
|
$4.000
|
$15.000
|
$8.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
68,176.000
|
$6.000
|
$5.000
|
$5.500
|
$7.250
|
$6.250
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
776.000
|
$65.000
|
$61.000
|
$62.000
|
$110.000
|
$58.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
325.000
|
$41.250
|
$44.000
|
$52.000
|
$43.000
|
$48.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,180.000
|
$900.000
|
$1,100.000
|
$970.000
|
$1,200.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
12.000
|
$1,400.000
|
$1,200.000
|
$1,150.000
|
$970.000
|
$1,200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
2,201.000
|
$15.000
|
$71.000
|
$5.500
|
$17.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
1,836.000
|
$14.000
|
$71.000
|
$5.500
|
$17.000
|
$12.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
24,909.000
|
$1.400
|
$1.000
|
$1.060
|
$1.000
|
$1.150
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
4,822.000
|
$2.250
|
$3.500
|
$3.200
|
$3.100
|
$2.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
150.000
|
$4.500
|
$5.000
|
$5.000
|
$4.700
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,543.000
|
$5.000
|
$7.000
|
$6.200
|
$6.200
|
$4.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
67.000
|
$80.000
|
$100.000
|
$100.000
|
$92.000
|
$80.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
45.000
|
$80.000
|
$90.000
|
$100.000
|
$92.000
|
$80.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
33.000
|
$30.000
|
$44.000
|
$45.000
|
$46.000
|
$40.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
10,636.000
|
$0.150
|
$0.250
|
$0.300
|
$0.230
|
$0.350
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
19,000.000
|
$0.200
|
$0.350
|
$0.400
|
$0.340
|
$0.500
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
24,909.000
|
$0.500
|
$0.450
|
$0.500
|
$0.450
|
$0.650
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
4,822.000
|
$1.250
|
$2.000
|
$2.200
|
$2.100
|
$1.500
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,513.000
|
$3.500
|
$4.000
|
$4.200
|
$4.200
|
$2.750
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
65.000
|
$55.000
|
$60.000
|
$65.000
|
$63.000
|
$50.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
37.000
|
$50.000
|
$60.000
|
$65.000
|
$63.000
|
$50.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
24,212.000
|
$0.150
|
$0.200
|
$0.300
|
$0.230
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
110.000
|
$3.000
|
$0.500
|
$0.550
|
$0.500
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
19,000.000
|
$0.900
|
$0.700
|
$0.800
|
$0.750
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
450.000
|
$3.000
|
$1.000
|
$1.100
|
$1.050
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,483.000
|
$3.500
|
$3.400
|
$3.400
|
$3.500
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,185.000
|
$0.600
|
$0.900
|
$0.950
|
$0.940
|
$0.650
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
28.000
|
$65.000
|
$72.000
|
$75.000
|
$250.000
|
$115.000
|
|
|
LEAN CONCRETE BASE (FN POS)
|
CY
|
5,030.000
|
$175.000
|
$33.000
|
$105.000
|
$100.000
|
$60.000
|
|
|
TMA (STATIONARY)
|
DAY
|
350.000
|
$200.000
|
$180.000
|
$80.000
|
$70.000
|
$200.000
|
|
|
WATER MAIN (PVC)(C-900)(12")
|
LF
|
205.000
|
$40.000
|
$94.000
|
$120.000
|
$87.000
|
$70.000
|
|
|
REMOVE EXIST WATER PIPE (12")
|
LF
|
200.000
|
$35.000
|
$54.000
|
$20.000
|
$13.300
|
$18.000
|
|
|
ADDITIONAL FITTINGS
|
LB
|
2,000.000
|
$5.000
|
$1.000
|
$4.000
|
$1.100
|
$2.000
|
|
|
CASING (STEEL) (24 IN) (OPEN TRENCH)
|
LF
|
30.000
|
$60.000
|
$170.000
|
$250.000
|
$440.000
|
$250.000
|
|
Totals: |
$12,898,154.870
|
$11,457,248.300
|
$11,979,103.790
|
$13,653,069.550
|
$14,437,596.900
|