REMOVING CONC (RIPRAP)
|
SY
|
195.000
|
$15.000
|
$10.000
|
$13.910
|
$57.000
|
$15.000
|
$37.000
|
$7.460
|
$25.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
1.600
|
$200.000
|
$500.000
|
$41.200
|
$400.000
|
$500.000
|
$950.000
|
$410.000
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,396.000
|
$20.000
|
$12.000
|
$13.910
|
$13.000
|
$15.000
|
$16.000
|
$13.410
|
$20.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
8.000
|
$25.000
|
$75.000
|
$25.750
|
$100.000
|
$45.000
|
$104.000
|
$44.560
|
$100.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
6,881.000
|
$10.000
|
$5.000
|
$4.700
|
$4.750
|
$7.000
|
$5.000
|
$5.190
|
$10.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
577.000
|
$15.000
|
$10.000
|
$13.300
|
$12.000
|
$16.000
|
$12.000
|
$14.140
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
1,958.000
|
$12.000
|
$14.000
|
$11.440
|
$4.500
|
$18.000
|
$8.500
|
$5.970
|
$25.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
660.000
|
$8.000
|
$20.000
|
$13.390
|
$10.000
|
$22.000
|
$24.000
|
$9.090
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
330.000
|
$20.000
|
$40.000
|
$8.570
|
$10.000
|
$22.000
|
$49.000
|
$10.650
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
265.000
|
$6.000
|
$5.000
|
$10.300
|
$10.000
|
$11.000
|
$9.500
|
$4.260
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
4.500
|
$30.000
|
$1,000.000
|
$515.000
|
$100.000
|
$1.000
|
$288.000
|
$5,837.500
|
$1,000.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
227.000
|
$115.000
|
$90.000
|
$144.200
|
$120.000
|
$200.000
|
$213.000
|
$180.380
|
$180.000
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
55.000
|
$85.000
|
$45.000
|
$83.150
|
$95.000
|
$50.000
|
$160.000
|
$94.180
|
$35.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
684.000
|
$6.000
|
$10.000
|
$15.450
|
$3.500
|
$13.000
|
$8.600
|
$2.760
|
$20.000
|
|
|
HALF - DEPTH REPAIR CRCP (10")
|
SY
|
250.000
|
$110.000
|
$100.000
|
$114.440
|
$400.100
|
$90.000
|
$558.000
|
$395.740
|
$75.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$700.000
|
$400.000
|
$515.000
|
$400.000
|
$1,000.000
|
$403.000
|
$664.550
|
$1,000.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
124.500
|
$450.000
|
$300.000
|
$257.500
|
$400.000
|
$550.000
|
$581.000
|
$589.540
|
$650.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
12.000
|
$600.000
|
$750.000
|
$154.500
|
$800.000
|
$550.000
|
$421.000
|
$1,005.350
|
$1,000.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
17.000
|
$125.000
|
$100.000
|
$41.200
|
$200.000
|
$100.000
|
$200.000
|
$920.340
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,000.000
|
$10,000.000
|
$61,800.000
|
$90,000.000
|
$115,000.000
|
$180,000.000
|
$342,284.570
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$2,200.000
|
$11,000.000
|
$13,390.000
|
$3,000.000
|
$1,000.000
|
$7,700.000
|
$9,540.650
|
$5,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$4.000
|
$2.000
|
$2.060
|
$3.000
|
$0.100
|
$3.000
|
$2.480
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.000
|
$3.000
|
$2.580
|
$4.500
|
$0.100
|
$4.500
|
$5.410
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$2.500
|
$1.000
|
$3.090
|
$1.250
|
$0.100
|
$1.400
|
$1.140
|
$1.000
|
|
|
CONC CURB (TY I)
|
LF
|
138.000
|
$40.000
|
$20.000
|
$10.310
|
$15.000
|
$15.000
|
$30.500
|
$18.410
|
$25.000
|
|
|
CONC CURB (TY II)
|
LF
|
5,180.000
|
$20.000
|
$8.000
|
$9.750
|
$13.000
|
$15.500
|
$14.000
|
$16.850
|
$30.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
53.000
|
$25.000
|
$25.000
|
$10.310
|
$18.000
|
$20.000
|
$26.000
|
$21.960
|
$50.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,581.000
|
$35.000
|
$15.000
|
$10.310
|
$15.000
|
$30.000
|
$16.800
|
$22.370
|
$35.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
185.000
|
$50.000
|
$20.000
|
$154.500
|
$20.000
|
$25.000
|
$31.000
|
$29.560
|
$75.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
28.000
|
$125.000
|
$280.000
|
$360.500
|
$220.000
|
$400.000
|
$160.000
|
$219.510
|
$100.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,391.000
|
$65.000
|
$32.000
|
$44.150
|
$55.000
|
$85.000
|
$50.750
|
$79.200
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,226.000
|
$50.000
|
$30.000
|
$39.140
|
$35.000
|
$45.000
|
$65.000
|
$30.000
|
$35.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,506.000
|
$65.000
|
$26.000
|
$35.050
|
$34.000
|
$85.000
|
$33.000
|
$54.640
|
$65.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
16.000
|
$80.000
|
$60.000
|
$41.350
|
$35.000
|
$85.000
|
$61.000
|
$65.420
|
$70.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
564.000
|
$80.000
|
$95.000
|
$102.930
|
$96.500
|
$100.000
|
$81.000
|
$114.180
|
$130.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
663.000
|
$80.000
|
$95.000
|
$86.920
|
$96.500
|
$100.000
|
$77.000
|
$105.080
|
$130.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
324.000
|
$80.000
|
$95.000
|
$78.800
|
$96.500
|
$100.000
|
$74.000
|
$104.850
|
$130.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
9.000
|
$80.000
|
$95.000
|
$236.800
|
$96.500
|
$100.000
|
$162.000
|
$121.100
|
$250.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
805.000
|
$80.000
|
$95.000
|
$88.210
|
$96.500
|
$100.000
|
$79.000
|
$102.000
|
$130.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
260.000
|
$80.000
|
$95.000
|
$85.630
|
$96.500
|
$100.000
|
$78.000
|
$110.150
|
$130.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
188.000
|
$80.000
|
$95.000
|
$85.630
|
$96.500
|
$100.000
|
$76.000
|
$111.000
|
$130.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
20.000
|
$1,000.000
|
$620.000
|
$1,339.000
|
$370.000
|
$100.000
|
$581.000
|
$65.920
|
$150.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
864.000
|
$80.000
|
$190.000
|
$91.670
|
$70.000
|
$100.000
|
$113.500
|
$83.230
|
$100.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
10.000
|
$600.000
|
$500.000
|
$1,030.000
|
$600.000
|
$100.000
|
$403.000
|
$508.390
|
$1,000.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
466.000
|
$15.000
|
$35.000
|
$32.960
|
$38.500
|
$20.000
|
$37.000
|
$16.500
|
$35.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
25.000
|
$2.000
|
$3.600
|
$3.350
|
$4.000
|
$25.000
|
$4.000
|
$1.340
|
$100.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
91.000
|
$500.000
|
$1,050.000
|
$1,081.500
|
$1,300.000
|
$600.000
|
$1,208.000
|
$800.000
|
$750.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
16.000
|
$800.000
|
$1,200.000
|
$1,440.250
|
$1,600.000
|
$800.000
|
$1,608.000
|
$1,135.690
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
78.000
|
$200.000
|
$220.000
|
$203.940
|
$240.000
|
$50.000
|
$228.000
|
$489.440
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
133.000
|
$300.000
|
$300.000
|
$336.350
|
$395.000
|
$200.000
|
$376.000
|
$266.510
|
$360.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$50.000
|
$280.000
|
$231.750
|
$270.000
|
$200.000
|
$259.000
|
$103.740
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
1.000
|
$150.000
|
$150.000
|
$97.850
|
$150.000
|
$500.000
|
$115.000
|
$64.950
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
1.000
|
$55.000
|
$50.000
|
$51.500
|
$50.000
|
$150.000
|
$115.000
|
$20.800
|
$100.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,313.000
|
$6.000
|
$5.000
|
$3.090
|
$3.650
|
$5.000
|
$3.500
|
$3.210
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,626.000
|
$7.000
|
$8.000
|
$6.180
|
$7.500
|
$10.000
|
$7.000
|
$6.550
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$25.000
|
$200.000
|
$139.050
|
$170.000
|
$150.000
|
$155.500
|
$122.200
|
$65.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$400.000
|
$200.000
|
$149.350
|
$180.000
|
$150.000
|
$167.000
|
$150.000
|
$65.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
288.000
|
$0.600
|
$2.000
|
$2.060
|
$2.500
|
$0.700
|
$2.500
|
$0.180
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,313.000
|
$1.000
|
$2.500
|
$1.440
|
$1.750
|
$1.000
|
$2.000
|
$1.100
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,626.000
|
$1.250
|
$3.000
|
$2.880
|
$3.500
|
$2.000
|
$3.500
|
$2.130
|
$2.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$20.000
|
$200.000
|
$72.100
|
$85.000
|
$25.000
|
$81.000
|
$42.460
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$35.000
|
$200.000
|
$82.400
|
$96.000
|
$25.000
|
$92.000
|
$48.250
|
$40.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
108.000
|
$3.000
|
$8.000
|
$4.120
|
$5.000
|
$1.500
|
$5.000
|
$0.430
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
10.000
|
$3.000
|
$15.000
|
$3.090
|
$3.750
|
$1.500
|
$3.500
|
$0.380
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
170.000
|
$3.000
|
$8.000
|
$3.090
|
$3.750
|
$1.500
|
$3.500
|
$0.430
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
485.000
|
$1.250
|
$3.500
|
$0.570
|
$0.750
|
$1.000
|
$1.000
|
$0.610
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
108.000
|
$2.250
|
$3.500
|
$1.130
|
$1.500
|
$2.000
|
$1.500
|
$0.880
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,398.000
|
$2.500
|
$3.500
|
$1.650
|
$2.000
|
$3.000
|
$2.000
|
$1.510
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,663.000
|
$3.000
|
$3.500
|
$3.300
|
$4.000
|
$3.500
|
$3.700
|
$3.270
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$40.000
|
$100.000
|
$128.750
|
$150.000
|
$80.000
|
$144.000
|
$54.870
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$40.000
|
$100.000
|
$128.750
|
$150.000
|
$80.000
|
$144.000
|
$65.380
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
288.000
|
$0.200
|
$1.000
|
$0.260
|
$0.500
|
$0.500
|
$0.500
|
$0.120
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,313.000
|
$0.650
|
$2.000
|
$0.770
|
$1.000
|
$0.500
|
$1.000
|
$0.430
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,626.000
|
$0.650
|
$2.000
|
$1.550
|
$1.900
|
$0.600
|
$2.000
|
$0.790
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$8.000
|
$200.000
|
$25.750
|
$30.000
|
$15.000
|
$29.000
|
$19.700
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$15.000
|
$200.000
|
$25.750
|
$30.000
|
$15.000
|
$29.000
|
$26.090
|
$55.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
130.000
|
$3.500
|
$6.600
|
$6.160
|
$7.500
|
$12.000
|
$7.000
|
$1.730
|
$50.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$1,100.000
|
$2,800.000
|
$2,631.650
|
$3,100.000
|
$2,500.000
|
$3,000.000
|
$2,210.000
|
$5,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
2.000
|
$600.000
|
$1,450.000
|
$1,287.500
|
$1,500.000
|
$2,000.000
|
$1,438.000
|
$1,003.760
|
$1,000.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
86.000
|
$400.000
|
$618.000
|
$606.360
|
$710.000
|
$300.000
|
$677.000
|
$506.220
|
$450.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$16.150
|
$16.380
|
$19.250
|
$1.000
|
$18.500
|
$3.580
|
$10.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
88.000
|
$75.000
|
$140.000
|
$128.750
|
$151.000
|
$25.000
|
$144.000
|
$92.410
|
$300.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
1.000
|
$400.000
|
$4,000.000
|
$1,751.000
|
$6,000.000
|
$5,000.000
|
$3,450.000
|
$7,588.750
|
$5,000.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
2.000
|
$350.000
|
$500.000
|
$618.000
|
$700.000
|
$500.000
|
$460.000
|
$630.410
|
$350.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$4,500.000
|
$2,060.000
|
$10,000.000
|
$300.000
|
$8,625.000
|
$8,423.220
|
$20,000.000
|
|
Totals: |
$1,918,349.500
|
$1,766,126.500
|
$1,858,586.920
|
$1,919,931.600
|
$2,046,684.700
|
$2,186,325.050
|
$2,337,282.560
|
$2,632,932.000
|