Show Job Controls
Bid Cobra

EL PASO SL 375 (2552-04-055)

Items: 41

County: EL PASO
Length: 0.0000 MILES (8.4080 MILES)
Highway: SL 375
District: EL PASO
Control Number: 2552-04-055
DBE Goal: 0.0%
Project: STP 2026(324)HES
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $6,949,288.00
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263215
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193343
Contract Type: FEDERAL
Project Description: SAFETY LIGHTING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,949,288.00
$6,996,635.80
Over/Under Est: 0.68% $47,347.80
Over/Under Est: 10.2% $708,903.97
Amt Left: 9.46% $661,556.17
Over/Under Est: 13.84% $961,754.85
Amt Left: 13.07% $914,407.05
Delta: -3.30% -$252,850.88
$8,808,153.40
Over/Under Est: 26.75% $1,858,865.40
Amt Left: 25.89% $1,811,517.60
Delta: -11.34% -$897,110.55

Bid Items & Bid Tabulations

41 Total 0 of 41
EL PASO  |  SL 375  |  EL PASO  |  2552-04-055  |  08/06/2026 1:00 PM CDT  |  $6,949,288.00  |  STP 2026(324)HES  |  HAZARD ELIM & SAFETY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALBATROSS CONSTRUCTION LLC
MARTINEZ BROS. CONTRACTORS, LLC
TRI STATE ELECTRIC, LTD.
DIGG COMMERCIAL, LLC
REMOV CONC (PAV)
SY 7.220 $25.000 $201.250 $201.250 $525.000 $500.000
EXCAV (SPECIAL)
CY 21.000 $1,250.000 $212.750 $856.750 $975.000 $200.000
CONC PVMT (CRCP) (11")
SY 5.850 $100.000 $1,092.500 $488.750 $1,250.000 $1,500.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 1,280.000 $900.000 $974.340 $977.500 $956.140 $1,000.000
RIPRAP (CONC)(4 IN)
CY 61.440 $500.000 $902.750 $690.000 $575.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 107.460 $500.000 $977.500 $690.000 $600.000 $800.000
MOBILIZATION
LS 1.000 $34,000.000 $354,456.700 $270,000.000 $10,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $13,000.000 $3,742.100 $14,938.500 $16,519.490 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $155.000 $111.800 $115.000 $295.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $1,250.000 $20,125.000 $14,950.000 $10,300.000 $2,500.000
TMA (STATIONARY)
DAY 180.000 $250.000 $225.000 $373.750 $325.000 $2,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $5.000 $5.690 $8.050 $12.750 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.500 $2.820 $1.150 $3.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 60.000 $7.500 $30.280 $8.050 $15.500 $35.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $1.500 $18.780 $1.150 $7.000 $1.000
PERM CTB (F-SHAPE) (TY 1)
LF 330.000 $90.000 $402.500 $165.600 $395.000 $150.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,750.000 $35.000 $55.200 $43.700 $60.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $3,000.000 $3,450.000 $2,990.000 $4,500.000 $2,213.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $2,200.000 $1,897.500 $2,012.500 $5,632.000 $1,217.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $500.000 $575.000 $575.000 $990.000 $195.000
GUARDRAIL END TREATMENT (INSTALL)
EA 29.000 $4,000.000 $4,255.000 $4,025.000 $5,530.250 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $575.000 $575.000 $625.000 $269.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL2)
EA 9.000 $18,000.000 $16,675.000 $11,500.000 $9,500.000 $1,500.000
REMOVE RD IL ASM (CTB MOUNT)
EA 129.000 $850.000 $266.260 $1,035.000 $935.000 $454.000
REPLACE LUMINAIRE W/(150W EQ) LED
EA 16.000 $700.000 $420.720 $575.000 $750.000 $510.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 40.000 $50,000.000 $47,382.850 $55,200.000 $54,000.000 $58,000.000
LED HI MST IL ASM (6 FIXT) (TY B)
EA 6.000 $35,000.000 $38,185.680 $45,568.750 $46,500.000 $50,000.000
LED HI MST IL ASM(6 FIXT) (TY B)SHLD
EA 34.000 $35,000.000 $39,305.210 $46,718.750 $47,000.000 $50,000.000
CONDT (PVC) (SCH 40) (2")
LF 28,040.000 $18.000 $13.350 $14.950 $18.090 $30.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,480.000 $30.000 $45.060 $34.500 $30.880 $70.000
CONDUIT (PREPARE)
LF 1,380.000 $4.000 $8.150 $8.050 $4.140 $2.000
ELEC CONDR (NO.8) INSULATED
LF 9,315.000 $2.500 $1.430 $2.300 $3.650 $2.160
ELEC CONDR (NO.6) INSULATED
LF 98,070.000 $2.500 $1.890 $2.300 $4.000 $2.800
GROUND BOX TY A (122311)W/APRON
EA 100.000 $1,700.000 $972.810 $1,265.000 $1,498.360 $1,451.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 3.000 $9,000.000 $9,385.330 $11,500.000 $10,000.000 $7,500.000
RELOCATE LRSA
EA 1.000 $4,000.000 $3,585.060 $3,450.000 $9,182.270 $1,636.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 22.000 $25.000 $57.500 $57.500 $18.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BR)
EA 138.000 $35.000 $57.500 $57.500 $45.000 $30.000
GROUND BOX (PREPARE)
EA 18.000 $600.000 $386.030 $460.000 $886.210 $500.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 6.000 $600.000 $6,771.660 $4,600.000 $2,500.000 $1,130.000
REMOVE EXISTING CABLES (POWER)
LF 33,930.000 $10.000 $0.430 $1.150 $2.950 $3.000
Totals: $6,949,288.000 $6,996,635.790 $7,658,191.962 $7,911,042.850 $8,808,153.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $96,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $126,000.00