MOBILIZATION
|
LS
|
1.000
|
$5,000.000
|
$15,000.000
|
$15,000.000
|
$30,000.000
|
|
|
MOBILIZATION (CALLOUT 1)
|
EA
|
3.000
|
$1,500.000
|
$10,000.000
|
$1,750.000
|
$8,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.820
|
$4.000
|
$2.000
|
$19.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$222.400
|
$124.000
|
$150.000
|
$200.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
200.000
|
$8.800
|
$8.000
|
$8.000
|
$30.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
1.000
|
$500.000
|
$3,000.000
|
$500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$1,000.000
|
$20,000.000
|
$20,100.000
|
$21,000.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
|
EA
|
2.000
|
$20,000.000
|
$20,000.000
|
$16,500.000
|
$17,000.000
|
|
|
CRASH CUSHION ATTEN (INSTALL) (QUAD)(W)
|
EA
|
2.000
|
$16,900.000
|
$20,000.000
|
$20,550.000
|
$21,000.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$20.000
|
$12.000
|
$17.750
|
$16.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
80.000
|
$30.000
|
$25.000
|
$35.000
|
$75.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
350.000
|
$30.000
|
$20.000
|
$30.000
|
$36.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
550.000
|
$50.000
|
$30.000
|
$48.000
|
$50.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
80.000
|
$30.000
|
$39.940
|
$60.000
|
$60.000
|
|
|
REALIGN POSTS
|
EA
|
300.000
|
$40.000
|
$9.000
|
$15.000
|
$35.000
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
2.000
|
$10.000
|
$15.000
|
$20.000
|
$500.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
500.000
|
$11.750
|
$15.000
|
$28.000
|
$18.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
550.000
|
$30.000
|
$35.000
|
$97.000
|
$40.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
3.000
|
$50.000
|
$50.000
|
$150.000
|
$500.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
220.000
|
$100.000
|
$100.000
|
$200.000
|
$300.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
200.000
|
$900.000
|
$925.000
|
$1,100.000
|
$900.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
10.000
|
$5.000
|
$30.000
|
$30.000
|
$50.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
100.000
|
$80.000
|
$75.000
|
$77.000
|
$100.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
2.000
|
$100.000
|
$150.000
|
$300.000
|
$500.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
2.000
|
$150.000
|
$150.000
|
$300.000
|
$500.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
4.000
|
$50.000
|
$100.000
|
$100.000
|
$600.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
30.000
|
$221.000
|
$250.000
|
$500.000
|
$90.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
1,000.000
|
$4.000
|
$1.500
|
$6.750
|
$9.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
100.000
|
$4.400
|
$5.000
|
$2.000
|
$50.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
2.000
|
$50.000
|
$35.000
|
$50.000
|
$500.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
20.000
|
$19.250
|
$9.000
|
$15.000
|
$150.000
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
2.000
|
$4,200.000
|
$35.000
|
$50.000
|
$250.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
20.000
|
$18.000
|
$23.000
|
$50.000
|
$150.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
20.000
|
$5.000
|
$2.500
|
$5.000
|
$150.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
1.000
|
$10,000.000
|
$13,000.000
|
$15,000.000
|
$17,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
1.000
|
$20,000.000
|
$10,000.000
|
$23,900.000
|
$23,500.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
1.000
|
$16,000.000
|
$10,000.000
|
$20,100.000
|
$21,000.000
|
|
|
REPAIR (TRACC)
|
LF
|
20.000
|
$130.000
|
$75.000
|
$100.000
|
$150.000
|
|
|
REPAIR (WIDE TRACC)
|
LF
|
2.000
|
$200.000
|
$50.000
|
$200.000
|
$500.000
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
1.000
|
$20,000.000
|
$15,000.000
|
$17,500.000
|
$17,500.000
|
|
|
REMOVE AND REPLACE (TAU II) (N)
|
EA
|
1.000
|
$20,000.000
|
$20,090.500
|
$19,950.000
|
$25,000.000
|
|
|
REPAIR TAU II (N)
|
LF
|
2.000
|
$1,000.000
|
$300.000
|
$500.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$1,500.000
|
$100.000
|
$600.000
|
$350.000
|
|
|
1 LN CLOSURE 2 LN RD NO SHOULDERS
|
HR
|
80.000
|
$150.000
|
$175.000
|
$70.000
|
$60.000
|
|
|
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
|
HR
|
80.000
|
$65.000
|
$175.000
|
$70.000
|
$60.000
|
|
|
1 LN CLOSURE 4 LN RD
|
HR
|
25.000
|
$65.000
|
$180.000
|
$150.000
|
$60.000
|
|
|
FREEWAY 1 LANE CLOSURE
|
HR
|
80.000
|
$88.000
|
$200.000
|
$150.000
|
$60.000
|
|
|
EXIT OR ENTRANCE RAMP CLOSURE
|
HR
|
40.000
|
$525.000
|
$175.000
|
$70.000
|
$60.000
|
|
|
ONE LANE FRONTAGE ROAD CLOSURE
|
HR
|
5.000
|
$150.000
|
$175.000
|
$70.000
|
$60.000
|
|
|
ONE LANE CONNECTING RAMP CLOSURE
|
HR
|
5.000
|
$150.000
|
$175.000
|
$150.000
|
$60.000
|
|
|
WORK AREA ON SHOULDER
|
HR
|
60.000
|
$120.000
|
$175.000
|
$70.000
|
$60.000
|
|
|
TURN AROUND CLOSURE
|
HR
|
40.000
|
$120.000
|
$175.000
|
$70.000
|
$60.000
|
|
Totals: |
$652,223.000
|
$641,335.700
|
$760,090.000
|
$761,400.000
|