Show Job Controls
Bid Cobra

CULBERSON IH0010 (6500-72-001)

Items: 18

County: CULBERSON
Length: 0.0100 MILES
Highway: IH0010
District: EL PASO
Control Number: 6500-72-001
DBE Goal: 0.0%
Project: RMC - A00220891
Guaranty: $0.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $998,750.00
Date: 08/12/2026 3:00 PM CDT (5 weeks ago) Changed
Contract Number: 7262401
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00220891
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (3)
E
Engineer's Estimate
$998,750.00
$1,106,900.00
Over/Under Est: 10.83% $108,150.00
Over/Under Est: 15.04% $150,175.00
Amt Left: 3.8% $42,025.00
$1,274,190.00
Over/Under Est: 27.58% $275,440.00
Amt Left: 15.11% $167,290.00
Delta: -10.90% -$125,265.00

Bid Items & Bid Tabulations

18 Total 0 of 18
CULBERSON  |  IH0010  |  EL PASO  |  6500-72-001  |  08/12/2026 3:00 PM CDT  |  $998,750.00  |  RMC - A00220891  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E.V.G. ENTERPRISE
APACHE BARRICADE & SIGN
DIGG COMMERCIAL, LLC
MOBILIZATION
LS 1.000 $35,000.000 $500.000 $20,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $2,000.000 $125.000 $8,000.000
TMA (STATIONARY)
DAY 115.000 $250.000 $300.000 $700.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $30.000 $100.000 $5.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 25.000 $30.000 $100.000 $5.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $30.000 $100.000 $5.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 25.000 $30.000 $100.000 $5.000 $50.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $1,050.000 $1,200.000 $1,600.000 $846.000
REPLACE W-BEAM RAIL
LF 5,100.000 $50.000 $46.000 $21.000 $10.000
REPLACE GUARDRAIL END TREATMENT SYSTEM
EA 70.000 $3,500.000 $5,000.000 $3,400.000 $1,800.000
REPLACE CURVED RAIL
LF 50.000 $35.000 $25.000 $23.000 $1.000
REMOVE RAIL
LF 1,000.000 $12.000 $20.000 $9.000 $1.000
REPLACE LINE OR TERMINAL POST (VALTIR)
EA 1,200.000 $250.000 $300.000 $415.000 $270.000
REPLACE LINE OR TERMINAL POST (GIBRAL)
EA 300.000 $200.000 $195.000 $415.000 $270.000
REPLACE CABLE RELEASE POST
EA 25.000 $300.000 $250.000 $1,275.000 $750.000
CHECK AND RE-TENSION CABLE SYSTEM
EA 5.000 $350.000 $300.000 $175.000 $500.000
REPLACE CABLE
LF 300.000 $10.000 $1.000 $21.000 $4.000
SPLICE CABLE
EA 25.000 $250.000 $300.000 $275.000 $400.000
Totals: $998,750.000 $1,106,900.000 $1,148,925.000 $1,274,190.000