|
|
PREPARING ROW
|
STA
|
362.600
|
$750.000
|
$246.000
|
$150.000
|
$250.000
|
$210.000
|
$525.000
|
$500.000
|
$381.560
|
$900.000
|
$500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
133.000
|
$20.000
|
$15.000
|
$30.000
|
$20.000
|
$19.250
|
$21.000
|
$40.000
|
$17.000
|
$20.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
87,843.000
|
$3.250
|
$1.360
|
$2.000
|
$1.500
|
$2.500
|
$3.220
|
$5.000
|
$6.230
|
$3.550
|
$5.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,809.000
|
$7.450
|
$9.200
|
$7.000
|
$9.000
|
$8.000
|
$15.750
|
$9.000
|
$13.000
|
$21.000
|
$6.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
362.600
|
$260.380
|
$201.640
|
$350.000
|
$200.000
|
$235.000
|
$630.000
|
$500.000
|
$224.000
|
$300.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
51,289.000
|
$12.500
|
$9.400
|
$6.500
|
$15.500
|
$9.000
|
$3.150
|
$18.000
|
$7.000
|
$13.500
|
$10.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
362.600
|
$190.000
|
$261.420
|
$170.000
|
$100.000
|
$295.000
|
$157.500
|
$150.000
|
$500.000
|
$175.000
|
$350.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
362.600
|
$230.000
|
$201.640
|
$100.000
|
$75.000
|
$165.000
|
$525.000
|
$170.000
|
$304.000
|
$180.000
|
$180.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
161,155.000
|
$0.950
|
$0.650
|
$0.800
|
$0.650
|
$2.000
|
$0.630
|
$1.000
|
$0.650
|
$0.950
|
$1.750
|
|
|
BLOCK SODDING
|
SY
|
416.000
|
$3.150
|
$5.000
|
$5.000
|
$5.500
|
$7.700
|
$13.650
|
$5.000
|
$4.900
|
$7.500
|
$10.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
161,155.000
|
$0.200
|
$0.110
|
$0.120
|
$0.110
|
$0.150
|
$0.110
|
$0.100
|
$0.103
|
$0.120
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
161,155.000
|
$0.200
|
$0.080
|
$0.100
|
$0.070
|
$0.150
|
$0.110
|
$0.100
|
$0.065
|
$0.100
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
27,979.000
|
$5.960
|
$2.080
|
$0.100
|
$0.010
|
$1.000
|
$1.050
|
$15.000
|
$0.010
|
$0.010
|
$20.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
451.000
|
$27.540
|
$74.130
|
$47.000
|
$35.000
|
$75.000
|
$31.500
|
$20.000
|
$35.000
|
$30.000
|
$45.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
114,123.000
|
$15.610
|
$17.280
|
$18.000
|
$18.000
|
$21.000
|
$16.800
|
$17.600
|
$23.000
|
$23.000
|
$22.000
|
|
|
REWORK BS MTL (TY B) (6") (ORD COMP)
|
SY
|
18,521.000
|
$1.750
|
$3.160
|
$4.000
|
$2.000
|
$3.900
|
$1.330
|
$2.000
|
$6.000
|
$2.200
|
$5.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
62,057.000
|
$1.750
|
$1.890
|
$2.000
|
$1.250
|
$1.500
|
$1.330
|
$1.000
|
$4.000
|
$2.000
|
$2.000
|
|
|
CEMENT
|
TON
|
715.000
|
$190.000
|
$127.000
|
$175.000
|
$140.000
|
$150.000
|
$136.500
|
$149.000
|
$140.000
|
$130.000
|
$225.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
122,181.000
|
$1.500
|
$1.880
|
$2.500
|
$1.500
|
$1.650
|
$2.500
|
$2.000
|
$4.000
|
$2.000
|
$3.250
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
22,825.000
|
$6.500
|
$4.030
|
$2.800
|
$2.500
|
$4.850
|
$6.300
|
$4.000
|
$7.000
|
$7.250
|
$4.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
33,322.000
|
$4.500
|
$4.130
|
$2.800
|
$3.200
|
$3.500
|
$4.000
|
$4.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
ASPH (RC-250)
|
GAL
|
10,566.000
|
$3.500
|
$4.650
|
$2.800
|
$3.500
|
$5.000
|
$4.500
|
$5.000
|
$4.000
|
$5.500
|
$5.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
302.000
|
$120.000
|
$121.950
|
$75.000
|
$115.000
|
$145.000
|
$121.000
|
$100.000
|
$95.000
|
$130.000
|
$165.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
47,264.000
|
$3.570
|
$4.390
|
$3.500
|
$3.100
|
$3.500
|
$4.290
|
$5.000
|
$6.000
|
$5.000
|
$4.750
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
728.000
|
$75.000
|
$138.480
|
$140.000
|
$140.000
|
$130.000
|
$152.000
|
$120.000
|
$105.000
|
$110.000
|
$250.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
274.000
|
$150.000
|
$112.970
|
$90.000
|
$135.000
|
$140.000
|
$204.000
|
$140.000
|
$90.000
|
$110.000
|
$200.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
719.000
|
$125.000
|
$112.590
|
$110.000
|
$130.000
|
$130.000
|
$132.000
|
$140.000
|
$90.000
|
$155.000
|
$200.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
2,853.000
|
$85.600
|
$93.000
|
$89.000
|
$84.000
|
$100.000
|
$111.000
|
$115.000
|
$93.000
|
$95.000
|
$110.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
39.000
|
$250.000
|
$175.000
|
$130.000
|
$500.000
|
$120.000
|
$232.500
|
$95.000
|
$175.000
|
$220.000
|
$95.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
39.000
|
$30.000
|
$15.000
|
$10.000
|
$15.000
|
$30.000
|
$55.950
|
$20.000
|
$15.000
|
$8.500
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,257.000
|
$22.060
|
$33.000
|
$31.000
|
$17.000
|
$38.000
|
$60.050
|
$20.000
|
$38.000
|
$32.000
|
$20.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
11.000
|
$363.700
|
$425.000
|
$510.000
|
$575.000
|
$500.000
|
$735.000
|
$700.000
|
$425.000
|
$550.000
|
$400.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
278.000
|
$525.000
|
$155.500
|
$125.000
|
$310.000
|
$285.000
|
$420.000
|
$250.000
|
$211.000
|
$87.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$424.260
|
$425.000
|
$480.000
|
$425.000
|
$495.000
|
$735.000
|
$600.000
|
$425.000
|
$540.000
|
$400.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
56.000
|
$850.250
|
$550.000
|
$550.000
|
$600.000
|
$500.000
|
$445.530
|
$500.000
|
$550.000
|
$490.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
64.000
|
$652.500
|
$625.000
|
$600.000
|
$575.000
|
$410.000
|
$474.660
|
$450.000
|
$625.000
|
$550.000
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
60.000
|
$880.000
|
$600.000
|
$620.000
|
$595.000
|
$430.000
|
$534.810
|
$500.000
|
$600.000
|
$570.000
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
148.000
|
$500.000
|
$700.000
|
$675.000
|
$625.000
|
$460.000
|
$602.140
|
$540.000
|
$700.000
|
$700.000
|
$700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,936.000
|
$48.510
|
$45.000
|
$54.000
|
$54.000
|
$44.000
|
$82.240
|
$80.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
581.000
|
$58.210
|
$55.000
|
$70.000
|
$58.000
|
$58.000
|
$95.630
|
$100.000
|
$55.000
|
$100.000
|
$75.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
74.000
|
$110.000
|
$75.000
|
$110.000
|
$80.000
|
$80.000
|
$134.520
|
$110.000
|
$75.000
|
$135.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
38.000
|
$200.000
|
$105.000
|
$150.000
|
$95.000
|
$105.000
|
$240.130
|
$195.000
|
$105.000
|
$175.000
|
$175.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
91.000
|
$300.000
|
$130.000
|
$175.000
|
$120.000
|
$135.000
|
$447.590
|
$200.000
|
$130.000
|
$275.000
|
$275.000
|
|
|
RC PIPE (CL V)(12 IN)
|
LF
|
40.000
|
$68.960
|
$45.000
|
$100.000
|
$145.000
|
$60.000
|
$75.160
|
$80.000
|
$45.000
|
$50.000
|
$100.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
100.000
|
$85.390
|
$85.000
|
$85.000
|
$170.000
|
$90.000
|
$109.780
|
$100.000
|
$85.000
|
$108.000
|
$115.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$1,800.000
|
$3,000.000
|
$3,000.000
|
$5,500.000
|
$4,900.000
|
$5,703.870
|
$3,800.000
|
$3,000.000
|
$2,200.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$4,746.100
|
$4,000.000
|
$4,000.000
|
$6,000.000
|
$5,000.000
|
$6,051.190
|
$4,700.000
|
$4,000.000
|
$3,250.000
|
$6,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$6,700.000
|
$5,500.000
|
$5,000.000
|
$6,500.000
|
$5,000.000
|
$7,550.360
|
$7,400.000
|
$5,500.000
|
$4,100.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,533.330
|
$6,500.000
|
$6,000.000
|
$7,500.000
|
$10,000.000
|
$9,172.520
|
$7,800.000
|
$6,500.000
|
$6,000.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
4.000
|
$5,482.500
|
$7,000.000
|
$17,000.000
|
$9,500.000
|
$10,000.000
|
$12,412.900
|
$7,500.000
|
$7,000.000
|
$15,500.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
6.000
|
$10,600.000
|
$9,000.000
|
$18,000.000
|
$9,000.000
|
$12,500.000
|
$12,676.040
|
$8,000.000
|
$9,000.000
|
$14,300.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$20,000.000
|
$35,000.000
|
$55,000.000
|
$34,000.000
|
$34,000.000
|
$49,174.780
|
$29,000.000
|
$35,000.000
|
$44,000.000
|
$30,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$5,500.000
|
$8,000.000
|
$7,500.000
|
$7,000.000
|
$9,000.000
|
$14,148.650
|
$10,000.000
|
$8,000.000
|
$5,400.000
|
$12,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$7,500.000
|
$12,000.000
|
$8,500.000
|
$8,000.000
|
$12,000.000
|
$15,270.720
|
$12,000.000
|
$12,000.000
|
$8,600.000
|
$15,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$12,000.000
|
$16,000.000
|
$14,000.000
|
$9,000.000
|
$17,250.000
|
$21,297.070
|
$13,000.000
|
$16,000.000
|
$13,000.000
|
$16,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$21,500.000
|
$26,000.000
|
$30,000.000
|
$17,000.000
|
$24,000.000
|
$29,083.740
|
$28,000.000
|
$26,000.000
|
$26,000.000
|
$30,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$745.000
|
$550.000
|
$750.000
|
$875.000
|
$525.000
|
$625.760
|
$900.000
|
$550.000
|
$775.000
|
$650.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
130.000
|
$665.000
|
$650.000
|
$800.000
|
$1,025.000
|
$630.000
|
$857.880
|
$1,000.000
|
$650.000
|
$800.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,005.000
|
$900.000
|
$850.000
|
$1,250.000
|
$975.000
|
$1,110.830
|
$1,300.000
|
$900.000
|
$925.000
|
$1,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,825.000
|
$2,200.000
|
$1,800.000
|
$2,500.000
|
$1,750.000
|
$2,512.140
|
$1,900.000
|
$2,200.000
|
$2,700.000
|
$2,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,150.000
|
$4,500.000
|
$3,200.000
|
$3,400.000
|
$3,200.000
|
$3,631.600
|
$3,900.000
|
$4,500.000
|
$3,750.000
|
$6,000.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
8.000
|
$57.800
|
$40.000
|
$100.000
|
$85.000
|
$58.000
|
$239.040
|
$140.000
|
$40.000
|
$110.000
|
$80.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$2,167.570
|
$1,500.000
|
$1,600.000
|
$1,650.000
|
$2,500.000
|
$5,201.990
|
$19.000
|
$1,500.000
|
$1,650.000
|
$1,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$1,159.060
|
$750.000
|
$1,400.000
|
$1,175.000
|
$1,350.000
|
$2,072.190
|
$900.000
|
$750.000
|
$1,300.000
|
$1,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$1,482.390
|
$750.000
|
$1,400.000
|
$1,175.000
|
$1,250.000
|
$1,036.100
|
$900.000
|
$750.000
|
$1,300.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$900.000
|
$750.000
|
$650.000
|
$785.510
|
$1,100.000
|
$300.000
|
$950.000
|
$1,000.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
84.000
|
$580.920
|
$300.000
|
$650.000
|
$500.000
|
$250.000
|
$518.050
|
$600.000
|
$300.000
|
$950.000
|
$350.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$709,916.200
|
$591,000.000
|
$578,000.000
|
$725,000.000
|
$825,000.000
|
$922,000.000
|
$775,000.000
|
$794,000.000
|
$998,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$10,000.000
|
$7,800.000
|
$14,000.000
|
$14,600.000
|
$3,500.000
|
$29,500.000
|
$10,000.000
|
$9,343.000
|
$44,060.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,160.000
|
$22.240
|
$26.000
|
$25.000
|
$27.500
|
$34.350
|
$26.890
|
$25.000
|
$26.000
|
$25.000
|
$27.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,160.000
|
$5.830
|
$5.000
|
$3.000
|
$8.000
|
$8.800
|
$8.520
|
$10.000
|
$5.000
|
$9.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$18.460
|
$15.000
|
$10.000
|
$20.250
|
$22.250
|
$21.570
|
$25.000
|
$15.000
|
$23.000
|
$21.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.340
|
$5.000
|
$2.000
|
$7.000
|
$7.700
|
$7.460
|
$9.000
|
$5.000
|
$7.750
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,514.000
|
$1.750
|
$2.250
|
$3.000
|
$3.000
|
$1.800
|
$1.760
|
$2.000
|
$2.250
|
$2.050
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,514.000
|
$0.500
|
$0.500
|
$0.700
|
$0.500
|
$0.550
|
$0.530
|
$0.500
|
$0.500
|
$0.500
|
$0.650
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
352.000
|
$4.320
|
$3.500
|
$6.500
|
$7.500
|
$4.700
|
$4.530
|
$4.000
|
$3.500
|
$3.500
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
352.000
|
$0.610
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
$0.960
|
$1.000
|
$1.000
|
$0.750
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
50.000
|
$75.000
|
$202.040
|
$100.000
|
$155.000
|
$130.000
|
$75.000
|
$70.000
|
$620.000
|
$300.000
|
$65.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$28.760
|
$88.540
|
$100.000
|
$100.000
|
$70.000
|
$52.500
|
$90.000
|
$100.000
|
$156.000
|
$50.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$3.980
|
$23.540
|
$25.000
|
$37.000
|
$12.000
|
$21.000
|
$5.000
|
$100.000
|
$51.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$8.060
|
$23.540
|
$35.000
|
$36.000
|
$25.000
|
$21.000
|
$7.000
|
$100.000
|
$79.000
|
$12.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,006.000
|
$30.140
|
$24.810
|
$26.000
|
$40.000
|
$37.000
|
$45.000
|
$35.000
|
$28.650
|
$38.500
|
$45.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,259.000
|
$20.000
|
$19.930
|
$15.000
|
$26.000
|
$29.000
|
$34.000
|
$30.000
|
$25.000
|
$21.250
|
$18.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
108.000
|
$125.000
|
$111.720
|
$120.000
|
$210.000
|
$130.000
|
$157.500
|
$85.000
|
$115.000
|
$130.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$20.320
|
$17.750
|
$20.000
|
$19.500
|
$24.200
|
$21.300
|
$20.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$22.560
|
$22.000
|
$25.000
|
$24.000
|
$22.000
|
$53.250
|
$20.000
|
$18.000
|
$21.000
|
$20.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.730
|
$2.250
|
$3.000
|
$2.450
|
$2.200
|
$5.330
|
$2.000
|
$2.000
|
$2.300
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$220.110
|
$225.000
|
$260.000
|
$245.000
|
$220.000
|
$159.750
|
$240.000
|
$200.000
|
$145.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,349.870
|
$2,225.000
|
$2,500.000
|
$2,400.000
|
$2,800.000
|
$2,662.500
|
$2,700.000
|
$2,250.000
|
$2,700.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$9,148.430
|
$13,775.000
|
$12,000.000
|
$13,000.000
|
$14,850.000
|
$15,750.000
|
$16,000.000
|
$14,000.000
|
$12,800.000
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
$3,200.000
|
$1,155.000
|
$3,000.000
|
$1,500.000
|
$1,300.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$639.880
|
$800.000
|
$750.000
|
$950.000
|
$1,100.000
|
$735.000
|
$1,200.000
|
$750.000
|
$705.000
|
$900.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$271.970
|
$250.000
|
$260.000
|
$270.000
|
$235.000
|
$186.380
|
$300.000
|
$200.000
|
$220.000
|
$275.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$582.540
|
$450.000
|
$470.000
|
$475.000
|
$630.000
|
$319.500
|
$350.000
|
$500.000
|
$580.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
73.000
|
$412.360
|
$450.000
|
$470.000
|
$490.000
|
$515.000
|
$559.130
|
$400.000
|
$600.000
|
$475.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$515.060
|
$500.000
|
$530.000
|
$540.000
|
$575.000
|
$670.950
|
$450.000
|
$700.000
|
$530.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$640.000
|
$500.000
|
$530.000
|
$540.000
|
$740.000
|
$899.930
|
$500.000
|
$900.000
|
$680.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
13.000
|
$1,035.830
|
$675.000
|
$710.000
|
$725.000
|
$1,050.000
|
$1,230.080
|
$600.000
|
$1,300.000
|
$955.000
|
$525.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
54.000
|
$63.430
|
$55.000
|
$60.000
|
$59.000
|
$85.000
|
$159.750
|
$40.000
|
$40.000
|
$80.000
|
$55.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
58,016.000
|
$0.750
|
$0.270
|
$0.270
|
$0.300
|
$0.330
|
$0.310
|
$0.500
|
$0.270
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
87,024.000
|
$0.260
|
$0.240
|
$0.240
|
$0.280
|
$0.330
|
$0.290
|
$0.500
|
$0.240
|
$0.300
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,211.000
|
$1.400
|
$2.000
|
$1.000
|
$1.200
|
$1.200
|
$1.850
|
$0.500
|
$3.000
|
$1.100
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
47.000
|
$6.410
|
$5.910
|
$6.200
|
$10.500
|
$6.600
|
$10.650
|
$6.000
|
$5.910
|
$10.050
|
$12.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$585.000
|
$525.000
|
$550.000
|
$775.000
|
$660.000
|
$798.750
|
$650.000
|
$525.000
|
$755.000
|
$500.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
60,868.000
|
$0.450
|
$0.350
|
$0.380
|
$0.400
|
$0.530
|
$0.400
|
$0.400
|
$0.350
|
$0.400
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
11,652.000
|
$0.510
|
$0.490
|
$0.500
|
$0.580
|
$0.750
|
$0.590
|
$0.800
|
$0.490
|
$0.560
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
28,449.000
|
$0.440
|
$0.420
|
$0.450
|
$0.430
|
$0.550
|
$0.440
|
$0.400
|
$0.420
|
$0.420
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
44,009.000
|
$0.480
|
$0.350
|
$0.380
|
$0.400
|
$0.530
|
$0.400
|
$0.400
|
$0.350
|
$0.400
|
$0.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
454.000
|
$3.630
|
$3.500
|
$4.000
|
$4.200
|
$4.000
|
$4.260
|
$3.500
|
$3.500
|
$4.050
|
$3.500
|
|
|
FULL - WIDTH MOWING
|
AC
|
154.000
|
$167.420
|
$26.000
|
$100.000
|
$75.000
|
$125.000
|
$175.000
|
$1.000
|
$26.000
|
$181.000
|
$170.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,504.020
|
$12,000.000
|
$10,000.000
|
$15,000.000
|
$18,000.000
|
$15,750.000
|
$1.000
|
$25,000.000
|
$15,100.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$14,500.000
|
$5,000.000
|
$10,000.000
|
$5,000.000
|
$20,000.000
|
$10,500.000
|
$1.000
|
$25,000.000
|
$53,000.000
|
$10,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$117.150
|
$100.000
|
$40.000
|
$50.000
|
$27.500
|
$55.000
|
$1.000
|
$75.000
|
$100.000
|
$900.000
|
|
Totals: |
$7,831,437.348
|
$7,140,372.110
|
$7,242,211.990
|
$7,520,020.340
|
$8,265,429.810
|
$8,895,123.520
|
$8,918,593.300
|
$9,162,741.586
|
$9,984,758.340
|
$10,267,895.700
|