PREPARING ROW
|
STA
|
46.200
|
$900.000
|
$500.000
|
$1,785.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,340.000
|
$12.480
|
$16.000
|
$15.000
|
$25.000
|
$15.000
|
$15.000
|
$20.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
245.000
|
$3.860
|
$12.000
|
$15.000
|
$10.000
|
$15.000
|
$20.000
|
$20.000
|
$18.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,983.000
|
$9.270
|
$13.000
|
$5.250
|
$25.000
|
$10.000
|
$20.000
|
$20.000
|
$12.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
46.200
|
$107.170
|
$200.000
|
$126.000
|
$300.000
|
$600.000
|
$400.000
|
$250.000
|
$600.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
10,273.000
|
$1.300
|
$1.500
|
$1.250
|
$0.950
|
$3.000
|
$2.000
|
$5.500
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
63.000
|
$4.000
|
$5.000
|
$2.500
|
$8.500
|
$5.000
|
$12.000
|
$6.250
|
$6.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
10,273.000
|
$0.140
|
$0.390
|
$1.250
|
$0.150
|
$1.000
|
$0.290
|
$0.500
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
10,273.000
|
$0.110
|
$0.390
|
$0.100
|
$0.130
|
$1.000
|
$0.270
|
$0.500
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
3,141.700
|
$6.000
|
$6.000
|
$1.000
|
$1.000
|
$25.000
|
$18.000
|
$30.000
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2)(17")
|
SY
|
3,596.000
|
$19.250
|
$28.000
|
$40.360
|
$39.000
|
$25.000
|
$35.000
|
$32.500
|
$60.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
616.000
|
$3.780
|
$3.820
|
$11.180
|
$2.500
|
$17.000
|
$10.000
|
$8.000
|
$7.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
1,356.000
|
$2.500
|
$3.890
|
$6.000
|
$5.500
|
$10.000
|
$10.000
|
$8.000
|
$7.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
26.000
|
$81.000
|
$300.000
|
$250.000
|
$600.000
|
$1,000.000
|
$150.000
|
$250.000
|
$500.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG64-22
|
TON
|
1,639.000
|
$72.000
|
$85.000
|
$76.500
|
$100.000
|
$100.000
|
$110.000
|
$105.000
|
$180.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
8.000
|
$6.130
|
$30.000
|
$21.000
|
$20.000
|
$10.000
|
$60.000
|
$3.500
|
$50.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,382.000
|
$14.000
|
$12.000
|
$31.500
|
$18.000
|
$35.000
|
$35.000
|
$42.000
|
$10.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
20.000
|
$395.600
|
$400.000
|
$735.000
|
$425.000
|
$600.000
|
$660.000
|
$650.000
|
$800.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
85.000
|
$38.720
|
$200.000
|
$315.000
|
$300.000
|
$180.000
|
$250.000
|
$145.000
|
$200.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
37.000
|
$55.000
|
$40.000
|
$100.000
|
$53.000
|
$45.000
|
$40.000
|
$55.000
|
$80.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
20.000
|
$230.000
|
$600.000
|
$1,000.000
|
$700.000
|
$700.000
|
$700.000
|
$850.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
42.000
|
$309.110
|
$700.000
|
$1,050.000
|
$750.000
|
$800.000
|
$875.000
|
$950.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
119.000
|
$48.000
|
$48.000
|
$55.000
|
$35.000
|
$35.000
|
$65.000
|
$55.000
|
$60.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
103.000
|
$50.000
|
$43.500
|
$60.000
|
$48.000
|
$45.000
|
$70.000
|
$65.000
|
$70.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
270.000
|
$54.430
|
$42.000
|
$65.000
|
$54.000
|
$55.000
|
$85.000
|
$85.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
27.000
|
$74.630
|
$58.500
|
$100.000
|
$86.000
|
$75.000
|
$105.000
|
$105.000
|
$110.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$8,289.000
|
$6,500.000
|
$20,761.400
|
$6,300.000
|
$8,000.000
|
$5,000.000
|
$10,000.000
|
$12,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$9,250.000
|
$7,000.000
|
$16,800.000
|
$6,300.000
|
$10,000.000
|
$5,500.000
|
$12,500.000
|
$14,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$16,500.000
|
$8,000.000
|
$25,200.000
|
$22,500.000
|
$16,000.000
|
$30,000.000
|
$20,000.000
|
$25,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$600.000
|
$600.000
|
$700.000
|
$850.000
|
$500.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$600.000
|
$600.000
|
$725.000
|
$840.000
|
$500.000
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$600.000
|
$700.000
|
$750.000
|
$850.000
|
$600.000
|
$1,000.000
|
$1,500.000
|
$1,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$780.000
|
$700.000
|
$900.000
|
$925.000
|
$800.000
|
$1,050.000
|
$1,850.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$1,259.090
|
$1,050.000
|
$900.000
|
$1,200.000
|
$2,000.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,075.000
|
$1,100.000
|
$1,300.000
|
$2,500.000
|
$1,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,100.000
|
$1,000.000
|
$1,260.000
|
$4,100.000
|
$1,500.000
|
$3,500.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,450.000
|
$900.000
|
$630.000
|
$1,050.000
|
$1,000.000
|
$1,750.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$800.000
|
$800.000
|
$630.000
|
$1,050.000
|
$500.000
|
$1,750.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
15.000
|
$415.350
|
$300.000
|
$630.000
|
$475.000
|
$300.000
|
$750.000
|
$250.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$104,775.180
|
$90,000.000
|
$125,000.000
|
$144,000.000
|
$200,000.000
|
$160,000.000
|
$150,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$10,000.000
|
$1,500.000
|
$15,750.000
|
$14,150.000
|
$5,000.000
|
$17,000.000
|
$8,500.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
360.000
|
$28.000
|
$29.000
|
$26.340
|
$27.000
|
$35.000
|
$24.000
|
$45.000
|
$20.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
360.000
|
$8.000
|
$12.000
|
$8.600
|
$8.500
|
$10.000
|
$8.000
|
$15.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$19.000
|
$30.000
|
$10.000
|
$19.250
|
$25.000
|
$30.000
|
$45.000
|
$14.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$12.000
|
$5.000
|
$8.000
|
$10.000
|
$10.000
|
$20.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
618.000
|
$2.500
|
$3.000
|
$1.770
|
$4.000
|
$3.000
|
$3.500
|
$4.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
618.000
|
$0.700
|
$1.500
|
$0.540
|
$0.500
|
$1.000
|
$1.250
|
$2.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$5,600.000
|
$5,000.000
|
$1,260.000
|
$1,000.000
|
$10,000.000
|
$7,500.000
|
$5,500.000
|
$6,000.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$12.120
|
$35.000
|
$5.000
|
$28.000
|
$35.000
|
$15.000
|
$65.000
|
$45.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$10.960
|
$28.000
|
$5.000
|
$26.000
|
$25.000
|
$15.000
|
$20.000
|
$30.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
966.000
|
$94.680
|
$85.000
|
$94.500
|
$135.000
|
$75.000
|
$90.000
|
$75.000
|
$160.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
245.000
|
$33.770
|
$38.000
|
$42.530
|
$49.000
|
$45.000
|
$65.000
|
$42.000
|
$100.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
374.000
|
$95.020
|
$92.000
|
$94.500
|
$160.000
|
$100.000
|
$110.000
|
$110.000
|
$160.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
650.000
|
$17.150
|
$26.000
|
$20.380
|
$19.500
|
$25.000
|
$20.000
|
$25.000
|
$28.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$2.400
|
$2.000
|
$3.230
|
$2.150
|
$2.000
|
$2.250
|
$3.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,194.000
|
$2,200.000
|
$2,391.880
|
$2,350.000
|
$2,500.000
|
$2,500.000
|
$2,850.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$256.000
|
$300.000
|
$376.250
|
$270.000
|
$500.000
|
$300.000
|
$1,500.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$18,000.000
|
$7,000.000
|
$1,000.000
|
$9,750.000
|
$15,000.000
|
$12,000.000
|
$12,500.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,061.000
|
$500.000
|
$250.000
|
$800.000
|
$2,500.000
|
$3,000.000
|
$2,500.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$379.000
|
$300.000
|
$295.630
|
$240.000
|
$350.000
|
$250.000
|
$650.000
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
14.000
|
$650.000
|
$300.000
|
$425.000
|
$350.000
|
$500.000
|
$400.000
|
$650.000
|
$200.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$75.000
|
$50.000
|
$59.130
|
$75.000
|
$35.000
|
$80.000
|
$100.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
70.000
|
$30.990
|
$35.000
|
$35.480
|
$27.000
|
$35.000
|
$30.000
|
$100.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
192.000
|
$0.300
|
$0.750
|
$0.500
|
$1.090
|
$1.000
|
$1.110
|
$1.500
|
$1.900
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
8,478.000
|
$0.300
|
$0.750
|
$0.250
|
$0.490
|
$0.500
|
$0.500
|
$1.000
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,200.000
|
$0.600
|
$1.250
|
$1.000
|
$1.300
|
$2.000
|
$1.340
|
$3.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
347.000
|
$0.710
|
$1.500
|
$1.800
|
$1.500
|
$1.000
|
$1.250
|
$5.000
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,245.000
|
$0.250
|
$1.000
|
$0.750
|
$0.600
|
$0.900
|
$0.610
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
393.000
|
$0.510
|
$2.250
|
$2.000
|
$1.090
|
$1.900
|
$1.110
|
$2.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
192.000
|
$0.260
|
$1.250
|
$1.000
|
$1.090
|
$1.000
|
$1.110
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,478.000
|
$0.280
|
$0.950
|
$0.700
|
$0.600
|
$1.000
|
$0.610
|
$1.000
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
116.000
|
$2.430
|
$5.000
|
$4.000
|
$6.790
|
$4.000
|
$6.950
|
$5.000
|
$15.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
6.800
|
$91.590
|
$600.000
|
$200.000
|
$200.000
|
$500.000
|
$600.000
|
$3,000.000
|
$50.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$4,000.000
|
$4,000.000
|
$2,000.000
|
$9,500.000
|
$25,000.000
|
$17,000.000
|
$15,000.000
|
$15,000.000
|
|
Totals: |
$1,030,586.706
|
$1,003,410.950
|
$1,292,578.000
|
$1,445,183.080
|
$1,531,985.700
|
$1,611,131.430
|
$1,654,299.250
|
$1,682,592.800
|