|
|
PREPARING ROW
|
STA
|
252.500
|
$750.000
|
$550.000
|
$550.000
|
$1,000.000
|
$300.000
|
$3,851.400
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
2,009.000
|
$10.000
|
$23.000
|
$11.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
52.000
|
$25.000
|
$64.000
|
$28.000
|
$26.000
|
$30.000
|
$20.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
471.000
|
$23.000
|
$51.000
|
$28.000
|
$30.000
|
$50.000
|
$20.000
|
|
|
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,066.000
|
$10.000
|
$27.000
|
$5.500
|
$11.000
|
$35.000
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
627.800
|
$30.000
|
$115.000
|
$34.000
|
$85.000
|
$35.000
|
$20.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
231.100
|
$450.000
|
$518.000
|
$300.000
|
$750.000
|
$150.000
|
$350.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
11,067.600
|
$25.000
|
$10.000
|
$25.000
|
$19.000
|
$19.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
231.100
|
$200.000
|
$240.740
|
$210.000
|
$325.000
|
$155.000
|
$250.000
|
|
|
BLADING
|
STA
|
252.500
|
$225.000
|
$89.000
|
$50.000
|
$140.000
|
$250.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
231.100
|
$150.000
|
$98.000
|
$50.000
|
$100.000
|
$170.000
|
$250.000
|
|
|
BLOCK SODDING
|
SY
|
585.000
|
$7.000
|
$7.400
|
$8.000
|
$9.000
|
$7.350
|
$10.000
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
185,335.000
|
$0.200
|
$0.410
|
$0.420
|
$0.500
|
$0.440
|
$0.350
|
|
|
HYDRO MULCH SEED (TEMP_WARM_COOL)
|
SY
|
185,335.000
|
$0.200
|
$0.400
|
$0.400
|
$0.500
|
$0.420
|
$0.350
|
|
|
VEGETATIVE WATERING
|
TGL
|
55,235.000
|
$7.000
|
$0.010
|
$0.010
|
$0.010
|
$0.150
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
72,750.000
|
$27.000
|
$27.700
|
$26.150
|
$28.000
|
$25.000
|
$25.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
14,848.000
|
$35.000
|
$34.000
|
$36.500
|
$36.000
|
$35.000
|
$50.000
|
|
|
REWORK BS MTL (TY C)(6")(ORD COMP)
|
SY
|
61,572.000
|
$3.000
|
$2.200
|
$2.400
|
$1.750
|
$2.700
|
$4.000
|
|
|
CEMENT
|
TON
|
500.000
|
$250.000
|
$220.000
|
$239.000
|
$240.000
|
$215.000
|
$300.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(6")
|
SY
|
82,175.000
|
$2.500
|
$1.800
|
$2.000
|
$2.250
|
$1.600
|
$5.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
14,553.000
|
$5.000
|
$5.000
|
$6.050
|
$4.250
|
$5.500
|
$5.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
18,192.000
|
$5.000
|
$3.800
|
$3.650
|
$4.250
|
$4.500
|
$5.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
15,281.000
|
$5.250
|
$4.350
|
$4.200
|
$5.000
|
$4.500
|
$5.000
|
|
|
AGGR (TY-B OR L, GR-3)(SAC-B)
|
CY
|
696.000
|
$180.000
|
$174.000
|
$180.000
|
$180.000
|
$235.000
|
$250.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
9,438.000
|
$135.000
|
$134.000
|
$130.000
|
$116.000
|
$155.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
583.000
|
$3.000
|
$3.050
|
$6.500
|
$8.000
|
$5.000
|
$6.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
5,285.000
|
$2.100
|
$4.100
|
$2.500
|
$2.000
|
$4.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV(3")
|
SY
|
61,629.000
|
$2.200
|
$2.750
|
$1.250
|
$2.500
|
$3.000
|
$3.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
223.000
|
$350.000
|
$180.000
|
$342.000
|
$200.000
|
$220.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
244.000
|
$12.000
|
$1.000
|
$22.000
|
$8.000
|
$21.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
432.000
|
$30.000
|
$45.000
|
$30.000
|
$26.000
|
$28.000
|
$85.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
5.000
|
$200.000
|
$350.000
|
$800.000
|
$750.000
|
$260.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.400
|
$600.000
|
$680.000
|
$675.000
|
$1,000.000
|
$635.000
|
$550.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
119.200
|
$225.000
|
$260.000
|
$238.000
|
$350.000
|
$225.000
|
$155.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,180.500
|
$300.000
|
$160.000
|
$233.000
|
$140.000
|
$190.000
|
$150.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
480.000
|
$50.000
|
$36.130
|
$70.000
|
$60.000
|
$38.000
|
$100.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
366.000
|
$350.000
|
$95.000
|
$92.000
|
$155.000
|
$100.000
|
$200.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
303.000
|
$600.000
|
$475.000
|
$402.000
|
$300.000
|
$375.000
|
$650.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
96.000
|
$1,150.000
|
$935.000
|
$907.000
|
$750.000
|
$848.000
|
$850.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
530.000
|
$100.000
|
$65.000
|
$70.000
|
$75.000
|
$66.000
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
501.000
|
$120.000
|
$85.000
|
$95.000
|
$145.000
|
$89.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
473.000
|
$145.000
|
$122.000
|
$106.000
|
$185.000
|
$100.000
|
$120.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
264.000
|
$185.000
|
$180.000
|
$151.000
|
$155.000
|
$142.000
|
$140.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
137.000
|
$210.000
|
$220.000
|
$255.000
|
$220.000
|
$238.000
|
$200.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
159.000
|
$290.000
|
$280.000
|
$246.000
|
$300.000
|
$230.000
|
$225.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$13,000.000
|
$9,000.000
|
$11,300.000
|
$12,000.000
|
$10,570.000
|
$9,500.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 42 IN)
|
EA
|
2.000
|
$14,000.000
|
$9,600.000
|
$11,600.000
|
$16,250.000
|
$10,920.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$10,000.000
|
$8,100.000
|
$12,000.000
|
$13,250.000
|
$11,300.000
|
$13,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$13,000.000
|
$14,400.000
|
$13,700.000
|
$19,500.000
|
$12,900.000
|
$18,500.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$20,000.000
|
$9,125.000
|
$11,700.000
|
$13,500.000
|
$10,900.000
|
$15,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
3.000
|
$21,000.000
|
$12,600.000
|
$12,200.000
|
$18,500.000
|
$11,500.000
|
$17,500.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$20,000.000
|
$9,350.000
|
$11,600.000
|
$18,000.000
|
$11,000.000
|
$16,500.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$21,000.000
|
$14,800.000
|
$13,000.000
|
$19,000.000
|
$12,225.000
|
$17,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
36.000
|
$1,500.000
|
$1,190.000
|
$1,900.000
|
$1,750.000
|
$1,815.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,300.000
|
$1,050.000
|
$1,650.000
|
$2,100.000
|
$1,560.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,800.000
|
$1,500.000
|
$2,350.000
|
$1,850.000
|
$2,242.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$4,000.000
|
$3,850.000
|
$2,850.000
|
$3,625.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$4,300.000
|
$6,000.000
|
$4,000.000
|
$5,610.000
|
$2,650.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$3,000.000
|
$3,100.000
|
$5,250.000
|
$2,850.000
|
$5,000.000
|
$4,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$4,000.000
|
$7,100.000
|
$9,400.000
|
$5,500.000
|
$8,875.000
|
$6,250.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$7,500.000
|
$9,500.000
|
$8,800.000
|
$11,000.000
|
$8,260.000
|
$9,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,800.000
|
$1,000.000
|
$1,740.000
|
$2,300.000
|
$1,650.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,044.500
|
$25.000
|
$10.000
|
$13.500
|
$26.000
|
$13.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
164.000
|
$170.000
|
$30.000
|
$250.000
|
$110.000
|
$245.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$884,166.530
|
$849,000.000
|
$790,000.000
|
$850,000.000
|
$850,000.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$12,000.000
|
$4,100.000
|
$12,500.000
|
$1,500.000
|
$10,000.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$5,600.000
|
$18,000.000
|
$22,000.000
|
$15,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
267.000
|
$250.000
|
$95.000
|
$15.000
|
$200.000
|
$225.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
184.000
|
$50.000
|
$12.000
|
$10.000
|
$200.000
|
$60.000
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
319.000
|
$70.000
|
$77.210
|
$82.000
|
$100.000
|
$74.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
319.000
|
$14.000
|
$19.130
|
$20.000
|
$12.000
|
$19.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
247.000
|
$30.000
|
$38.380
|
$38.500
|
$30.000
|
$20.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
247.000
|
$10.000
|
$11.270
|
$11.300
|
$12.000
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,584.000
|
$5.000
|
$4.340
|
$7.500
|
$6.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,584.000
|
$1.000
|
$0.940
|
$1.000
|
$1.200
|
$1.300
|
$2.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,290.000
|
$50.000
|
$67.000
|
$60.000
|
$58.000
|
$70.000
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
452.000
|
$150.000
|
$135.000
|
$175.000
|
$125.000
|
$165.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,459.000
|
$55.000
|
$75.000
|
$61.000
|
$42.000
|
$92.000
|
$45.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
48,296.000
|
$0.200
|
$0.340
|
$0.250
|
$0.400
|
$0.340
|
$0.300
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
24,148.000
|
$0.200
|
$0.430
|
$0.250
|
$0.500
|
$0.300
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,025.000
|
$25.000
|
$22.500
|
$22.000
|
$25.000
|
$24.000
|
$25.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
45.000
|
$95.000
|
$75.000
|
$95.000
|
$100.000
|
$79.000
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,630.000
|
$3.500
|
$2.500
|
$2.750
|
$3.000
|
$2.600
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$300.000
|
$150.000
|
$275.000
|
$200.000
|
$158.000
|
$1,850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$3,300.000
|
$2,950.000
|
$3,100.000
|
$3,300.000
|
$3,100.000
|
$3,850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
10.000
|
$260.000
|
$315.000
|
$375.000
|
$350.000
|
$331.000
|
$850.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$270.000
|
$400.000
|
$400.000
|
$425.000
|
$420.000
|
$850.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$600.000
|
$845.000
|
$650.000
|
$900.000
|
$887.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$800.000
|
$750.000
|
$800.000
|
$775.000
|
$788.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$950.000
|
$1,100.000
|
$1,050.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$500.000
|
$575.000
|
$750.000
|
$600.000
|
$604.000
|
$1,250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
48.000
|
$30.000
|
$25.000
|
$34.000
|
$30.000
|
$26.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH
|
EA
|
22.000
|
$85.000
|
$150.000
|
$175.000
|
$180.000
|
$158.000
|
$100.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
21.000
|
$5.000
|
$10.000
|
$16.000
|
$12.000
|
$11.000
|
$100.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
5.000
|
$5.000
|
$10.000
|
$16.000
|
$12.000
|
$11.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
3,620.000
|
$0.500
|
$0.370
|
$1.100
|
$1.250
|
$1.120
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
30,265.000
|
$0.500
|
$0.370
|
$0.280
|
$0.350
|
$0.280
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,602.000
|
$1.750
|
$1.040
|
$1.600
|
$2.000
|
$1.100
|
$6.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
39.000
|
$1.000
|
$2.000
|
$2.250
|
$2.250
|
$2.240
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
51.000
|
$14.000
|
$7.500
|
$9.000
|
$10.000
|
$8.980
|
$20.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
4,354.000
|
$1.000
|
$0.150
|
$0.220
|
$0.250
|
$0.220
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
50,346.000
|
$1.150
|
$0.510
|
$0.550
|
$0.600
|
$0.550
|
$0.750
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
3,620.000
|
$1.100
|
$0.590
|
$0.600
|
$0.750
|
$0.590
|
$0.750
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
30,265.000
|
$1.100
|
$0.510
|
$0.550
|
$0.600
|
$0.550
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
576.000
|
$5.500
|
$3.550
|
$4.200
|
$4.500
|
$4.210
|
$6.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
4,354.000
|
$0.500
|
$0.550
|
$0.450
|
$0.500
|
$0.450
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,354.000
|
$0.500
|
$0.050
|
$0.110
|
$0.150
|
$0.110
|
$0.750
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$3,500.000
|
$5,000.000
|
$4,000.000
|
$4,500.000
|
$5,000.000
|
$2,500.000
|
|
Totals: |
$9,725,830.780
|
$8,523,201.014
|
$8,683,140.920
|
$8,791,625.650
|
$8,970,458.210
|
$10,562,185.700
|