|
|
PREPARING ROW
|
STA
|
171.840
|
$1,200.000
|
$785.000
|
$800.000
|
$2,633.000
|
$410.000
|
$1,500.000
|
$4,000.000
|
$5,420.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
18.000
|
$50.000
|
$33.000
|
$16.000
|
$75.000
|
$50.000
|
$150.000
|
$20.000
|
$19.200
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
2,411.000
|
$23.000
|
$26.000
|
$16.000
|
$17.500
|
$52.570
|
$22.000
|
$20.000
|
$19.000
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,456.000
|
$9.000
|
$8.000
|
$12.000
|
$13.000
|
$26.760
|
$24.000
|
$20.000
|
$11.200
|
|
|
EXCAV (ROADWAY)
|
CY
|
9,989.000
|
$25.000
|
$15.000
|
$11.000
|
$5.000
|
$10.000
|
$26.000
|
$20.000
|
$17.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
171.840
|
$400.000
|
$375.000
|
$110.000
|
$750.000
|
$400.000
|
$1,300.000
|
$250.000
|
$394.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
16,708.000
|
$26.000
|
$21.000
|
$20.000
|
$10.500
|
$35.000
|
$24.000
|
$30.000
|
$34.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
171.840
|
$225.000
|
$235.000
|
$120.000
|
$375.000
|
$312.000
|
$150.000
|
$250.000
|
$310.000
|
|
|
BLADING
|
STA
|
171.840
|
$250.000
|
$100.000
|
$250.000
|
$200.000
|
$163.000
|
$130.000
|
$250.000
|
$255.000
|
|
|
BLOCK SODDING
|
SY
|
238.000
|
$9.000
|
$14.000
|
$10.000
|
$15.000
|
$12.990
|
$10.000
|
$6.000
|
$4.500
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
98,791.000
|
$0.270
|
$0.150
|
$0.250
|
$0.160
|
$0.140
|
$0.400
|
$0.500
|
$0.330
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
98,791.000
|
$0.270
|
$0.130
|
$0.210
|
$0.130
|
$0.120
|
$0.300
|
$0.500
|
$0.330
|
|
|
VEGETATIVE WATERING
|
TGL
|
29,429.000
|
$7.000
|
$0.010
|
$1.000
|
$1.000
|
$0.010
|
$1.000
|
$1.000
|
$25.600
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
56,094.000
|
$26.000
|
$29.250
|
$31.750
|
$30.000
|
$40.000
|
$38.000
|
$25.000
|
$25.540
|
|
|
REWORK BS MTL (TY B)(10")(ORD COMP)
|
SY
|
1,317.000
|
$2.500
|
$12.000
|
$3.250
|
$10.000
|
$37.000
|
$30.000
|
$6.000
|
$3.700
|
|
|
REWORK BS MTL (TY C)(10")(ORD COMP)
|
SY
|
40,956.000
|
$2.500
|
$2.000
|
$2.500
|
$3.250
|
$3.100
|
$3.500
|
$6.000
|
$2.800
|
|
|
CEMENT
|
TON
|
337.000
|
$250.000
|
$235.000
|
$225.000
|
$215.000
|
$210.000
|
$325.000
|
$300.000
|
$275.000
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
58,959.000
|
$3.000
|
$2.000
|
$2.000
|
$1.250
|
$2.150
|
$5.000
|
$6.000
|
$3.500
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
16,254.000
|
$4.750
|
$4.000
|
$5.000
|
$6.000
|
$4.800
|
$5.000
|
$5.000
|
$5.780
|
|
|
ASPH (CRS-2P)
|
GAL
|
13,558.000
|
$4.300
|
$4.000
|
$4.750
|
$5.000
|
$3.750
|
$4.000
|
$5.000
|
$8.400
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
11,378.000
|
$5.000
|
$4.000
|
$4.750
|
$6.000
|
$3.800
|
$5.000
|
$5.000
|
$8.660
|
|
|
AGGR (TY-B, GR-3)(SAC-B)
|
CY
|
518.000
|
$200.000
|
$190.000
|
$225.000
|
$275.000
|
$250.000
|
$170.000
|
$250.000
|
$446.250
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
5,896.000
|
$135.000
|
$130.000
|
$140.000
|
$163.000
|
$150.000
|
$120.000
|
$150.000
|
$172.000
|
|
|
PLANE ASPH CONC PAV(4")
|
SY
|
42,178.000
|
$4.000
|
$3.000
|
$3.500
|
$4.500
|
$4.500
|
$2.750
|
$6.000
|
$5.800
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
90.000
|
$400.000
|
$675.000
|
$131.000
|
$400.000
|
$130.000
|
$275.000
|
$200.000
|
$515.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
8.000
|
$300.000
|
$1,450.000
|
$420.000
|
$1,155.000
|
$1,000.000
|
$1,200.000
|
$350.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
33.000
|
$25.000
|
$15.000
|
$16.000
|
$75.000
|
$1.000
|
$50.000
|
$10.000
|
$4.800
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
32.000
|
$800.000
|
$700.000
|
$761.000
|
$1,000.000
|
$725.000
|
$1,200.000
|
$550.000
|
$795.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
10.000
|
$330.000
|
$460.000
|
$444.000
|
$402.350
|
$400.000
|
$325.000
|
$185.000
|
$167.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
92.000
|
$350.000
|
$320.000
|
$420.000
|
$235.040
|
$250.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
196.000
|
$350.000
|
$310.000
|
$210.000
|
$235.000
|
$199.120
|
$400.000
|
$250.000
|
$270.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
192.000
|
$550.000
|
$500.000
|
$735.000
|
$400.000
|
$480.000
|
$525.000
|
$650.000
|
$420.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
11.000
|
$1,100.000
|
$1,200.000
|
$1,155.000
|
$900.000
|
$1,045.000
|
$2,000.000
|
$1,000.000
|
$1,220.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$1,150.000
|
$1,500.000
|
$1,260.000
|
$1,000.000
|
$1,150.000
|
$2,550.000
|
$1,000.000
|
$612.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$1,200.000
|
$1,200.000
|
$1,470.000
|
$1,100.000
|
$1,200.000
|
$1,500.000
|
$1,000.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,250.000
|
$101.000
|
$77.000
|
$63.000
|
$68.000
|
$59.000
|
$105.000
|
$85.000
|
$84.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
404.000
|
$155.000
|
$108.000
|
$95.000
|
$91.000
|
$73.000
|
$125.000
|
$105.000
|
$133.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
102.000
|
$155.000
|
$137.000
|
$131.000
|
$109.000
|
$100.000
|
$135.000
|
$150.000
|
$150.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$19,000.000
|
$14,000.000
|
$23,100.000
|
$16,000.000
|
$19,000.000
|
$26,000.000
|
$25,000.000
|
$16,250.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$21,000.000
|
$16,000.000
|
$26,250.000
|
$34,000.000
|
$33,250.000
|
$28,000.000
|
$30,000.000
|
$27,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
2.000
|
$18,000.000
|
$14,000.000
|
$10,500.000
|
$12,000.000
|
$8,400.000
|
$14,000.000
|
$25,000.000
|
$11,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
2.000
|
$19,000.000
|
$14,000.000
|
$12,600.000
|
$12,000.000
|
$9,600.000
|
$15,000.000
|
$30,000.000
|
$13,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
1.000
|
$20,000.000
|
$16,000.000
|
$15,750.000
|
$15,000.000
|
$12,000.000
|
$24,000.000
|
$40,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,400.000
|
$1,425.000
|
$840.000
|
$700.000
|
$1,050.000
|
$1,425.000
|
$1,850.000
|
$3,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$1,500.000
|
$1,575.000
|
$1,050.000
|
$900.000
|
$1,140.000
|
$1,525.000
|
$1,250.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,750.000
|
$1,650.000
|
$1,260.000
|
$1,100.000
|
$1,290.000
|
$1,625.000
|
$2,000.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$2,250.000
|
$1,890.000
|
$1,732.500
|
$1,500.000
|
$1,400.000
|
$1,875.000
|
$2,200.000
|
$1,560.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$3,550.000
|
$4,300.000
|
$5,775.000
|
$3,500.000
|
$3,200.000
|
$3,200.000
|
$3,000.000
|
$3,220.000
|
|
|
REMOV STR (SET)
|
EA
|
28.000
|
$500.000
|
$1,050.000
|
$210.000
|
$250.000
|
$225.000
|
$550.000
|
$500.000
|
$755.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,300.000
|
$1,800.000
|
$1,050.000
|
$4,000.000
|
$1,500.000
|
$1,400.000
|
$2,500.000
|
$1,740.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,335.000
|
$20.000
|
$13.000
|
$10.500
|
$30.000
|
$12.000
|
$8.000
|
$50.000
|
$27.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
152.000
|
$125.000
|
$105.000
|
$105.000
|
$90.000
|
$80.000
|
$50.000
|
$100.000
|
$58.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$667,621.000
|
$650,000.000
|
$600,000.000
|
$731,000.000
|
$700,000.000
|
$725,000.000
|
$700,000.000
|
$265,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$17,500.000
|
$8,100.000
|
$33,000.000
|
$4,500.000
|
$1,500.000
|
$8,500.000
|
$7,150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$18,000.000
|
$15,000.000
|
$15,000.000
|
$6,000.000
|
$10,000.000
|
$20,000.000
|
$18,450.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$275.000
|
$50.000
|
$275.000
|
$100.000
|
$200.000
|
$200.000
|
$250.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
192.000
|
$75.000
|
$40.000
|
$70.000
|
$50.000
|
$10.000
|
$200.000
|
$55.000
|
$95.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
33.000
|
$85.000
|
$150.000
|
$105.000
|
$137.500
|
$140.120
|
$125.000
|
$50.000
|
$85.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
33.000
|
$20.000
|
$24.000
|
$26.000
|
$33.000
|
$23.800
|
$20.000
|
$20.000
|
$17.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
247.000
|
$35.000
|
$43.000
|
$41.000
|
$38.500
|
$42.890
|
$48.000
|
$50.000
|
$33.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
247.000
|
$12.000
|
$14.000
|
$12.500
|
$11.000
|
$13.860
|
$14.500
|
$2.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,280.000
|
$4.750
|
$5.750
|
$4.200
|
$4.000
|
$4.200
|
$4.500
|
$4.000
|
$4.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,280.000
|
$1.250
|
$0.950
|
$1.050
|
$1.000
|
$0.930
|
$1.250
|
$2.000
|
$1.150
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,112.000
|
$150.000
|
$160.000
|
$115.000
|
$110.000
|
$135.000
|
$120.000
|
$85.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,346.000
|
$65.000
|
$63.000
|
$125.000
|
$63.000
|
$65.000
|
$70.000
|
$55.000
|
$47.030
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
34,368.000
|
$0.180
|
$0.270
|
$0.370
|
$0.150
|
$0.270
|
$0.200
|
$0.300
|
$0.600
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
17,184.000
|
$0.220
|
$0.270
|
$0.480
|
$0.250
|
$0.460
|
$0.200
|
$0.300
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$30.000
|
$31.000
|
$23.000
|
$23.960
|
$21.500
|
$32.000
|
$30.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,700.000
|
$1,735.000
|
$3,023.670
|
$2,150.000
|
$2,100.000
|
$1,820.000
|
$2,365.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,300.000
|
$3,250.000
|
$3,072.000
|
$3,141.750
|
$2,925.000
|
$3,400.000
|
$3,850.000
|
$3,367.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
30.000
|
$295.000
|
$245.000
|
$236.000
|
$298.200
|
$225.000
|
$300.000
|
$1,100.000
|
$282.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$400.000
|
$275.000
|
$263.000
|
$303.530
|
$250.000
|
$300.000
|
$1,100.000
|
$285.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$700.000
|
$650.000
|
$630.000
|
$846.680
|
$600.000
|
$1,100.000
|
$1,100.000
|
$710.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
8.000
|
$30.000
|
$110.000
|
$105.000
|
$50.000
|
$50.000
|
$100.000
|
$30.000
|
$73.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
656.000
|
$2.000
|
$4.350
|
$11.000
|
$5.000
|
$20.000
|
$20.000
|
$3.000
|
$2.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
11.000
|
$50.000
|
$38.000
|
$37.000
|
$50.000
|
$35.000
|
$40.000
|
$50.000
|
$40.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
34.000
|
$700.000
|
$765.000
|
$735.000
|
$772.130
|
$700.000
|
$850.000
|
$1,100.000
|
$711.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
7.000
|
$800.000
|
$820.000
|
$788.000
|
$756.150
|
$750.000
|
$1,000.000
|
$1,100.000
|
$783.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$950.000
|
$930.000
|
$893.000
|
$921.230
|
$850.000
|
$1,150.000
|
$1,100.000
|
$894.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,200.000
|
$1,040.000
|
$998.000
|
$1,091.630
|
$950.000
|
$1,200.000
|
$1,100.000
|
$1,290.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$45.000
|
$49.000
|
$44.000
|
$26.630
|
$38.000
|
$45.000
|
$100.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$75.000
|
$71.000
|
$68.000
|
$47.930
|
$65.000
|
$75.000
|
$100.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,910.000
|
$0.450
|
$0.550
|
$0.530
|
$0.530
|
$0.330
|
$0.750
|
$1.000
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
21,921.000
|
$0.500
|
$0.250
|
$0.240
|
$0.240
|
$0.200
|
$0.300
|
$1.000
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,671.000
|
$1.250
|
$1.650
|
$1.140
|
$3.150
|
$1.000
|
$3.000
|
$6.000
|
$1.200
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
90.000
|
$2.000
|
$2.190
|
$2.100
|
$2.130
|
$1.000
|
$2.500
|
$1.000
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
385.000
|
$1.500
|
$1.090
|
$1.050
|
$1.070
|
$1.250
|
$1.250
|
$4.000
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
308.000
|
$4.500
|
$2.190
|
$2.100
|
$2.130
|
$3.150
|
$2.500
|
$6.000
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
295.000
|
$8.000
|
$7.100
|
$6.900
|
$6.920
|
$6.500
|
$8.000
|
$20.000
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$180.000
|
$180.000
|
$175.000
|
$175.730
|
$250.000
|
$200.000
|
$250.000
|
$170.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$250.000
|
$215.000
|
$205.000
|
$207.680
|
$300.000
|
$240.000
|
$250.000
|
$217.000
|
|
|
PAVEMENT SLER 12"
|
LF
|
240.000
|
$1.500
|
$1.090
|
$1.050
|
$1.070
|
$1.200
|
$1.250
|
$4.000
|
$1.500
|
|
|
PAVEMENT SLER 24"
|
LF
|
162.000
|
$2.500
|
$2.190
|
$2.100
|
$2.130
|
$2.000
|
$2.500
|
$12.000
|
$2.500
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
42,881.000
|
$0.750
|
$0.550
|
$0.530
|
$0.530
|
$0.550
|
$0.800
|
$0.650
|
$0.980
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,910.000
|
$0.900
|
$0.710
|
$0.680
|
$0.690
|
$0.550
|
$0.800
|
$0.650
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
32,199.000
|
$0.700
|
$0.550
|
$0.530
|
$0.530
|
$0.550
|
$0.800
|
$0.650
|
$1.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
371.000
|
$6.000
|
$5.150
|
$4.990
|
$5.060
|
$3.980
|
$6.000
|
$6.000
|
$5.500
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
240.000
|
$2.100
|
$3.280
|
$3.150
|
$3.200
|
$2.000
|
$4.000
|
$6.000
|
$5.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
162.000
|
$4.000
|
$6.560
|
$6.300
|
$6.390
|
$3.500
|
$7.500
|
$20.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
360.000
|
$0.200
|
$1.090
|
$1.050
|
$1.070
|
$0.350
|
$1.200
|
$1.000
|
$0.500
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$350.000
|
$550.000
|
$525.000
|
$500.000
|
$500.000
|
$1,000.000
|
$350.000
|
$458.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$6,000.000
|
$11,000.000
|
$8,925.000
|
$20,000.000
|
$5,000.000
|
$10,000.000
|
$12,500.000
|
$8,450.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,000.000
|
$1,650.000
|
$1,050.000
|
$5,000.000
|
$2,500.000
|
$2,500.000
|
$6,500.000
|
$8,900.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,500.000
|
$2,600.000
|
$6,000.000
|
$5,500.000
|
$8,200.000
|
$2,300.000
|
$2,500.000
|
$4,135.000
|
|
Totals: |
$7,053,216.560
|
$6,535,504.830
|
$6,582,349.410
|
$7,164,924.530
|
$7,327,363.410
|
$7,750,287.350
|
$7,873,764.100
|
$8,354,326.140
|