PREPARING ROW
|
STA
|
149.200
|
$1,000.000
|
$750.000
|
$535.000
|
$650.000
|
$500.000
|
$750.000
|
$1,300.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
52.000
|
$60.000
|
$35.000
|
$50.000
|
$30.000
|
$21.000
|
$83.000
|
$26.379
|
|
|
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,795.000
|
$20.000
|
$12.000
|
$25.000
|
$4.000
|
$12.500
|
$20.000
|
$18.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,862.000
|
$20.000
|
$15.000
|
$27.000
|
$15.000
|
$22.000
|
$8.000
|
$16.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
7,913.000
|
$25.000
|
$25.000
|
$32.000
|
$25.000
|
$35.000
|
$30.000
|
$65.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
4.000
|
$200.000
|
$200.000
|
$176.000
|
$300.000
|
$160.000
|
$116.000
|
$125.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
79,279.000
|
$2.000
|
$0.600
|
$0.460
|
$0.500
|
$1.000
|
$0.700
|
$3.200
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
79,279.000
|
$0.330
|
$0.250
|
$0.180
|
$0.180
|
$0.260
|
$0.180
|
$0.400
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
79,279.000
|
$0.330
|
$0.250
|
$0.160
|
$0.160
|
$0.230
|
$0.160
|
$0.275
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,290.000
|
$34.000
|
$5.000
|
$37.000
|
$1.000
|
$25.000
|
$5.000
|
$34.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
9,116.000
|
$72.500
|
$60.000
|
$58.500
|
$63.000
|
$52.000
|
$70.000
|
$45.000
|
|
|
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
|
CY
|
5,998.000
|
$75.000
|
$50.000
|
$37.000
|
$44.000
|
$50.000
|
$52.000
|
$133.000
|
|
|
REWORK BS MTL (TY C)(8")(ORD COMP)
|
SY
|
56,366.000
|
$2.200
|
$1.500
|
$0.900
|
$2.500
|
$2.000
|
$1.000
|
$8.000
|
|
|
CEMENT
|
TON
|
537.000
|
$250.000
|
$250.000
|
$230.000
|
$240.000
|
$237.000
|
$250.000
|
$236.250
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
56,366.000
|
$2.000
|
$3.000
|
$2.750
|
$2.500
|
$2.750
|
$5.000
|
$4.221
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
65,646.000
|
$5.200
|
$3.000
|
$3.600
|
$2.000
|
$3.500
|
$4.750
|
$12.600
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
5,475.000
|
$4.500
|
$5.000
|
$4.550
|
$3.700
|
$3.000
|
$4.750
|
$2.587
|
|
|
ASPH (CRS-2)
|
GAL
|
33,923.000
|
$3.750
|
$3.000
|
$3.300
|
$3.000
|
$3.700
|
$4.250
|
$4.284
|
|
|
AGGR (TY-D OR L, GR-4)
|
CY
|
417.000
|
$280.000
|
$125.000
|
$180.000
|
$185.000
|
$200.000
|
$275.000
|
$133.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
5,834.000
|
$120.000
|
$100.000
|
$143.000
|
$125.000
|
$145.000
|
$110.000
|
$134.500
|
|
|
TACK COAT
|
GAL
|
5,311.000
|
$2.000
|
$3.000
|
$2.900
|
$2.500
|
$3.000
|
$3.500
|
$4.480
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
48.000
|
$275.000
|
$200.000
|
$250.000
|
$150.000
|
$140.000
|
$50.000
|
$157.950
|
|
|
CEM STABIL BKFL
|
CY
|
54.000
|
$300.000
|
$200.000
|
$200.000
|
$283.000
|
$275.000
|
$273.000
|
$225.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
118.000
|
$50.000
|
$10.000
|
$8.000
|
$8.700
|
$90.000
|
$8.500
|
$10.000
|
|
|
CL C CONC (MISC)
|
CY
|
3.290
|
$2,500.000
|
$7,000.000
|
$2,500.000
|
$6,500.000
|
$4,000.000
|
$6,350.000
|
$1,507.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
122.200
|
$650.000
|
$750.000
|
$675.000
|
$640.000
|
$600.000
|
$623.000
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
108.830
|
$245.000
|
$200.000
|
$300.000
|
$235.000
|
$222.000
|
$233.000
|
$185.000
|
|
|
MISC NON-BRIDGE (NBIS)
|
LB
|
96.000
|
$30.000
|
$25.000
|
$7.000
|
$10.000
|
$150.000
|
$8.000
|
$90.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
804.000
|
$90.000
|
$90.000
|
$65.000
|
$101.000
|
$70.000
|
$98.000
|
$90.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
152.000
|
$120.000
|
$125.000
|
$150.000
|
$150.000
|
$95.000
|
$145.000
|
$114.570
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
64.000
|
$220.000
|
$175.000
|
$300.000
|
$217.000
|
$172.000
|
$210.000
|
$185.557
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$1,700.000
|
$1,250.000
|
$1,000.000
|
$1,423.000
|
$859.000
|
$1,375.000
|
$1,620.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$1,700.000
|
$1,250.000
|
$1,000.000
|
$1,482.000
|
$872.000
|
$1,430.000
|
$1,569.577
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,400.000
|
$2,000.000
|
$1,458.000
|
$1,340.000
|
$1,410.000
|
$1,597.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$1,600.000
|
$2,500.000
|
$1,707.000
|
$1,440.000
|
$1,650.000
|
$1,924.065
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,000.000
|
$6,000.000
|
$4,500.000
|
$5,865.000
|
$4,809.000
|
$5,665.000
|
$6,910.470
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,338.000
|
$2,500.000
|
$2,260.000
|
$4,750.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$700.000
|
$500.000
|
$750.000
|
$638.000
|
$650.000
|
$620.000
|
$704.250
|
|
|
REMOV STR (PIPE)
|
LF
|
786.000
|
$44.000
|
$15.000
|
$30.000
|
$13.000
|
$30.000
|
$13.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$390,000.000
|
$320,000.000
|
$395,000.000
|
$300,000.000
|
$350,000.000
|
$113,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$7,500.000
|
$5,000.000
|
$2,440.000
|
$14,000.000
|
$8,000.000
|
$17,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$10,250.000
|
$3,000.000
|
$15,000.000
|
$6,500.000
|
$10,000.000
|
$9,150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
196.000
|
$300.000
|
$225.000
|
$10.000
|
$100.000
|
$100.000
|
$250.000
|
$205.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$65.000
|
$60.000
|
$40.000
|
$25.000
|
$55.000
|
$50.000
|
$61.250
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
600.000
|
$52.000
|
$35.000
|
$36.000
|
$47.000
|
$46.000
|
$38.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
600.000
|
$15.000
|
$10.000
|
$10.000
|
$12.000
|
$10.500
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,026.000
|
$5.300
|
$3.500
|
$4.000
|
$4.000
|
$6.150
|
$3.150
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,026.000
|
$1.300
|
$1.000
|
$0.350
|
$1.050
|
$1.100
|
$1.050
|
$1.250
|
|
|
DRIVEWAYS (ACP) (TY 1)
|
SY
|
1,795.000
|
$70.000
|
$50.000
|
$108.000
|
$63.000
|
$40.000
|
$90.000
|
$49.500
|
|
|
TURNOUTS (ACP)
|
SY
|
164.000
|
$100.000
|
$50.000
|
$26.000
|
$75.000
|
$55.000
|
$95.000
|
$90.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
29,545.000
|
$0.500
|
$0.250
|
$0.360
|
$0.300
|
$0.190
|
$0.300
|
$0.250
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
14,630.000
|
$0.400
|
$0.500
|
$0.420
|
$0.300
|
$0.390
|
$0.300
|
$0.345
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,325.000
|
$35.000
|
$35.000
|
$30.000
|
$32.000
|
$30.000
|
$32.000
|
$31.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,300.000
|
$3,000.000
|
$2,877.500
|
$3,100.000
|
$2,960.000
|
$3,025.000
|
$2,877.500
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
3.000
|
$390.000
|
$200.000
|
$190.000
|
$206.000
|
$230.000
|
$200.000
|
$306.180
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$420.000
|
$250.000
|
$215.000
|
$233.000
|
$271.000
|
$225.000
|
$340.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,100.000
|
$800.000
|
$775.000
|
$842.000
|
$940.000
|
$815.000
|
$765.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$990.000
|
$1,076.000
|
$1,092.000
|
$1,040.000
|
$652.500
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
35.000
|
$700.000
|
$500.000
|
$495.000
|
$538.000
|
$490.000
|
$520.000
|
$512.290
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$750.000
|
$600.000
|
$550.000
|
$598.000
|
$663.000
|
$575.000
|
$587.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$150.000
|
$100.000
|
$100.000
|
$105.000
|
$125.000
|
$105.000
|
$115.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
9.000
|
$350.000
|
$500.000
|
$550.000
|
$250.000
|
$250.000
|
$315.000
|
$600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
|
EA
|
24.000
|
$50.000
|
$50.000
|
$45.000
|
$49.000
|
$46.000
|
$48.000
|
$125.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
8.000
|
$25.000
|
$50.000
|
$90.000
|
$54.000
|
$51.000
|
$55.000
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
30,815.000
|
$0.500
|
$0.420
|
$0.340
|
$0.460
|
$0.320
|
$0.440
|
$0.435
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,560.000
|
$0.500
|
$0.420
|
$0.340
|
$0.460
|
$0.320
|
$0.440
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
15,813.000
|
$0.500
|
$0.420
|
$0.340
|
$0.460
|
$0.320
|
$0.440
|
$0.410
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,559.000
|
$2.500
|
$1.500
|
$1.010
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
88.000
|
$12.000
|
$25.000
|
$16.000
|
$27.000
|
$13.500
|
$27.000
|
$8.590
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
30,815.000
|
$0.820
|
$0.800
|
$0.770
|
$0.820
|
$0.820
|
$0.790
|
$0.900
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
2,560.000
|
$0.820
|
$0.800
|
$0.770
|
$0.820
|
$0.820
|
$0.790
|
$0.860
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
15,813.000
|
$0.860
|
$0.800
|
$0.770
|
$0.820
|
$0.820
|
$0.790
|
$0.900
|
|
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
|
LF
|
80.000
|
$20.000
|
$25.000
|
$25.000
|
$27.000
|
$19.500
|
$26.000
|
$17.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$350.000
|
$575.000
|
$1,060.000
|
$600.000
|
$350.000
|
$295.000
|
$300.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
603.000
|
$9.000
|
$7.000
|
$5.200
|
$6.750
|
$5.250
|
$7.000
|
$5.500
|
|
Totals: |
$4,914,108.920
|
$3,949,757.010
|
$4,117,508.520
|
$4,146,002.200
|
$4,206,741.890
|
$4,621,812.590
|
$6,026,363.596
|