|
|
PREPARING ROW
|
STA
|
128.640
|
$500.000
|
$389.000
|
$459.500
|
$388.900
|
$332.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
19.000
|
$20.000
|
$25.000
|
$23.600
|
$22.000
|
$22.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
525.000
|
$6.000
|
$15.000
|
$8.200
|
$20.000
|
$26.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
156.000
|
$30.000
|
$25.000
|
$15.450
|
$100.000
|
$45.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
128.640
|
$170.000
|
$150.000
|
$303.450
|
$158.380
|
$230.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
85.000
|
$17.000
|
$50.000
|
$16.800
|
$90.690
|
$42.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
113.000
|
$25.000
|
$50.000
|
$16.300
|
$55.820
|
$42.000
|
|
|
BACKFILL (TY B)
|
STA
|
128.640
|
$160.000
|
$150.000
|
$234.900
|
$158.380
|
$274.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
128.640
|
$155.000
|
$150.000
|
$120.600
|
$158.380
|
$308.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
28,587.000
|
$0.060
|
$0.010
|
$0.050
|
$0.010
|
$0.050
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
28,587.000
|
$0.060
|
$0.010
|
$0.050
|
$0.010
|
$0.050
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
57,174.000
|
$0.200
|
$0.250
|
$0.250
|
$0.250
|
$0.190
|
|
|
VEGETATIVE WATERING
|
MG
|
343.000
|
$10.000
|
$10.000
|
$9.200
|
$5.990
|
$45.000
|
|
|
FL BS (RDWY DEL) (TY A GR 4)
|
TON
|
45.000
|
$45.000
|
$40.000
|
$35.350
|
$100.000
|
$54.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
34,572.000
|
$12.000
|
$14.250
|
$12.750
|
$13.870
|
$15.000
|
|
|
REWORK BS MTL (TY C) (6") (ORD COMP)
|
SY
|
31,713.000
|
$2.500
|
$2.910
|
$2.350
|
$2.090
|
$2.750
|
|
|
ASPH (RC-250)
|
GAL
|
9,680.000
|
$4.650
|
$4.770
|
$3.850
|
$4.640
|
$6.500
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
247.000
|
$110.000
|
$157.000
|
$91.300
|
$123.740
|
$98.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
288.000
|
$125.000
|
$186.000
|
$115.150
|
$184.280
|
$147.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
28,348.000
|
$3.250
|
$3.550
|
$3.350
|
$4.170
|
$5.150
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
330.000
|
$116.500
|
$159.000
|
$97.250
|
$128.040
|
$109.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
225.000
|
$100.000
|
$250.000
|
$147.700
|
$110.000
|
$110.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
120.000
|
$20.000
|
$5.000
|
$23.600
|
$20.000
|
$20.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
11.000
|
$115.000
|
$250.000
|
$160.600
|
$289.400
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$420.000
|
$450.000
|
$561.250
|
$500.000
|
$500.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
120.000
|
$100.000
|
$92.000
|
$81.500
|
$69.000
|
$94.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
240.000
|
$440.000
|
$507.000
|
$977.150
|
$700.000
|
$700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
366.000
|
$50.000
|
$41.000
|
$53.900
|
$45.000
|
$45.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
60.000
|
$70.000
|
$55.000
|
$80.900
|
$65.000
|
$65.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
290.000
|
$100.000
|
$88.000
|
$94.350
|
$90.000
|
$90.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
6.000
|
$9,500.000
|
$8,500.000
|
$7,975.550
|
$7,200.000
|
$7,200.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$750.000
|
$550.000
|
$768.000
|
$550.000
|
$550.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$600.000
|
$474.000
|
$827.100
|
$550.000
|
$550.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$800.000
|
$514.000
|
$1,004.350
|
$700.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$1,121.000
|
$1,181.550
|
$1,100.000
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
14.000
|
$1,400.000
|
$1,187.000
|
$1,299.700
|
$1,150.000
|
$1,150.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$4,500.000
|
$4,575.000
|
$6,498.600
|
$6,000.000
|
$6,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,108.000
|
$16.000
|
$50.000
|
$4.750
|
$12.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$126,000.000
|
$110,000.000
|
$182,243.750
|
$144,169.000
|
$126,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$2,500.000
|
$1,000.000
|
$2,613.100
|
$5,265.000
|
$6,138.790
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
360.000
|
$35.000
|
$36.000
|
$40.150
|
$36.000
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
360.000
|
$7.000
|
$5.000
|
$7.100
|
$5.500
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,314.000
|
$2.350
|
$2.000
|
$3.100
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
480.000
|
$2.350
|
$0.500
|
$0.150
|
$0.500
|
$0.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
19.000
|
$100.000
|
$150.000
|
$118.150
|
$100.000
|
$125.000
|
|
|
TURNOUTS (ACP)
|
SY
|
261.000
|
$70.000
|
$55.000
|
$35.450
|
$48.310
|
$90.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
585.000
|
$16.000
|
$30.000
|
$9.850
|
$27.730
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
250.000
|
$19.000
|
$25.000
|
$26.600
|
$22.500
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$1,388.350
|
$1,175.000
|
$1,902.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$1.000
|
$2.000
|
$1.500
|
$1.250
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$125.000
|
$120.000
|
$206.750
|
$175.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,180.000
|
$3,030.700
|
$2,565.000
|
$2,700.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
9.000
|
$185.000
|
$150.000
|
$199.700
|
$169.000
|
$175.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
62.000
|
$560.000
|
$550.000
|
$554.150
|
$469.000
|
$635.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$665.000
|
$780.000
|
$855.450
|
$724.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$850.000
|
$1,062.250
|
$899.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
67.000
|
$100.000
|
$150.000
|
$59.100
|
$50.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
12.000
|
$65.000
|
$35.000
|
$59.100
|
$50.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$25.000
|
$21.000
|
$23.650
|
$20.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
25,710.000
|
$0.180
|
$0.300
|
$0.230
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,810.000
|
$0.250
|
$0.300
|
$0.230
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,947.000
|
$0.180
|
$0.300
|
$0.230
|
$0.220
|
$0.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,020.000
|
$1.500
|
$1.000
|
$0.900
|
$2.250
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
42.000
|
$6.000
|
$20.000
|
$7.650
|
$7.250
|
$7.250
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
42.000
|
$4.000
|
$5.000
|
$4.250
|
$4.000
|
$4.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
25,710.000
|
$0.550
|
$0.650
|
$0.550
|
$0.520
|
$0.520
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
1,810.000
|
$0.650
|
$0.650
|
$0.550
|
$0.520
|
$0.520
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
15,947.000
|
$0.550
|
$0.650
|
$0.550
|
$0.520
|
$0.520
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
290.000
|
$4.000
|
$5.000
|
$4.150
|
$3.950
|
$3.950
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
37,431.000
|
$1.050
|
$1.740
|
$0.930
|
$1.110
|
$1.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
96.000
|
$200.000
|
$200.000
|
$225.000
|
$150.000
|
$165.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$85.000
|
$50.000
|
$95.000
|
$150.000
|
$165.000
|
|
Totals: |
$1,641,195.200
|
$1,844,734.620
|
$1,845,913.998
|
$1,846,483.366
|
$2,003,221.600
|