PREPARING ROW
|
STA
|
32.000
|
$5,000.000
|
$4,130.000
|
$2,500.000
|
$3,600.000
|
$5,520.000
|
$5,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
3,742.000
|
$20.000
|
$9.400
|
$13.000
|
$18.000
|
$24.000
|
$3.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
26.000
|
$9.000
|
$18.100
|
$25.100
|
$18.000
|
$22.000
|
$8.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
3,630.000
|
$5.000
|
$5.000
|
$7.200
|
$5.000
|
$13.000
|
$8.060
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,899.000
|
$13.000
|
$13.800
|
$14.100
|
$12.000
|
$11.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
488.000
|
$13.000
|
$21.700
|
$42.650
|
$19.000
|
$32.000
|
$60.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
14,023.000
|
$18.000
|
$22.600
|
$26.000
|
$18.000
|
$21.000
|
$25.000
|
|
|
BLADING
|
HR
|
40.000
|
$120.000
|
$117.000
|
$168.000
|
$80.000
|
$100.000
|
$30.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
28,551.000
|
$0.500
|
$0.210
|
$0.250
|
$0.220
|
$0.270
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
7,137.000
|
$0.500
|
$0.260
|
$0.200
|
$0.200
|
$0.240
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
7,137.000
|
$0.500
|
$0.260
|
$0.200
|
$0.200
|
$0.240
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
240.000
|
$45.000
|
$32.200
|
$36.700
|
$65.000
|
$15.000
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
5,770.000
|
$110.000
|
$50.000
|
$90.000
|
$105.000
|
$107.000
|
$88.000
|
|
|
CEMENT
|
TON
|
274.000
|
$220.000
|
$265.000
|
$270.000
|
$265.000
|
$230.000
|
$250.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
13,906.000
|
$3.500
|
$2.350
|
$4.750
|
$5.000
|
$4.000
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
16,674.000
|
$6.500
|
$1.000
|
$5.250
|
$3.000
|
$5.000
|
$4.950
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
99.000
|
$250.000
|
$238.000
|
$238.000
|
$700.000
|
$550.000
|
$225.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
188.000
|
$250.000
|
$264.000
|
$260.000
|
$400.000
|
$370.000
|
$250.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
5,946.000
|
$6.000
|
$4.250
|
$4.250
|
$4.000
|
$6.000
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
291.000
|
$150.000
|
$177.000
|
$216.000
|
$175.000
|
$230.000
|
$100.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
218.000
|
$45.000
|
$42.300
|
$58.000
|
$25.000
|
$100.000
|
$50.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,436.000
|
$325.000
|
$229.000
|
$270.000
|
$285.000
|
$247.000
|
$320.000
|
|
|
CL C CONC (ABUT)
|
CY
|
122.200
|
$1,200.000
|
$1,180.000
|
$1,310.000
|
$1,200.000
|
$1,600.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
197.000
|
$1,300.000
|
$1,240.000
|
$1,470.000
|
$1,650.000
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
77.500
|
$1,300.000
|
$1,440.000
|
$1,350.000
|
$1,900.000
|
$1,400.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
35,055.000
|
$23.000
|
$24.400
|
$26.000
|
$25.000
|
$30.000
|
$23.000
|
|
|
APPROACH SLAB
|
CY
|
204.400
|
$750.000
|
$848.000
|
$910.000
|
$1,100.000
|
$720.000
|
$600.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,074.500
|
$220.000
|
$225.000
|
$196.000
|
$275.000
|
$200.000
|
$280.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
3,398.520
|
$185.000
|
$200.000
|
$173.000
|
$275.000
|
$200.000
|
$280.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.200
|
$550.000
|
$660.000
|
$750.000
|
$900.000
|
$630.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,642.000
|
$175.000
|
$152.000
|
$208.000
|
$145.000
|
$190.000
|
$130.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,530.000
|
$120.000
|
$70.800
|
$73.900
|
$150.000
|
$108.000
|
$80.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
270.000
|
$150.000
|
$212.000
|
$237.000
|
$200.000
|
$200.000
|
$150.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
24.000
|
$950.000
|
$789.000
|
$1,370.000
|
$1,100.000
|
$800.000
|
$800.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$1,100.000
|
$1,720.000
|
$2,190.000
|
$1,500.000
|
$1,500.000
|
$800.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
188.000
|
$210.000
|
$130.000
|
$121.000
|
$300.000
|
$105.000
|
$100.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$19,500.000
|
$17,600.000
|
$12,900.000
|
$17,500.000
|
$19,000.000
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$15,000.000
|
$14,000.000
|
$9,300.000
|
$12,500.000
|
$12,000.000
|
$15,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,230.000
|
$2,940.000
|
$2,750.000
|
$2,200.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$2,740.000
|
$3,540.000
|
$3,400.000
|
$2,200.000
|
$1,800.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$130,180.000
|
$50,000.000
|
$44,500.000
|
$40,000.000
|
$31,000.000
|
$90,000.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$100,000.000
|
$88,000.000
|
$65,000.000
|
$62,000.000
|
$180,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$850.000
|
$539.000
|
$2,430.000
|
$100.000
|
$1,200.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$740,000.000
|
$616,000.000
|
$700,000.000
|
$360,000.000
|
$570,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$3,500.000
|
$4,880.000
|
$5,300.000
|
$3,000.000
|
$2,700.000
|
$2,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,785.000
|
$4.000
|
$3.150
|
$4.050
|
$2.350
|
$4.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,785.000
|
$1.000
|
$1.050
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,074.000
|
$75.000
|
$55.200
|
$68.900
|
$65.000
|
$72.000
|
$60.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$6,000.000
|
$5,290.000
|
$3,820.000
|
$12,000.000
|
$4,000.000
|
$8,750.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,140.000
|
$15.000
|
$12.700
|
$32.200
|
$17.500
|
$21.000
|
$10.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
810.000
|
$7.250
|
$14.100
|
$20.100
|
$4.500
|
$27.000
|
$5.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,140.000
|
$15.000
|
$12.700
|
$32.050
|
$16.000
|
$19.000
|
$10.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
746.000
|
$50.000
|
$69.000
|
$119.000
|
$68.000
|
$42.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
550.000
|
$28.000
|
$28.600
|
$25.450
|
$23.670
|
$30.000
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$2,020.000
|
$2,080.000
|
$1,933.000
|
$2,500.000
|
$1,915.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,875.000
|
$3.000
|
$2.250
|
$2.150
|
$28.160
|
$2.000
|
$2.150
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$296.000
|
$300.000
|
$275.000
|
$300.000
|
$280.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,300.000
|
$3,390.000
|
$3,090.000
|
$2,876.000
|
$3,500.000
|
$3,205.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,500.000
|
$3,070.000
|
$700.000
|
$650.000
|
$1,000.000
|
$2,900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$500.000
|
$1,960.000
|
$380.000
|
$350.000
|
$600.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,000.000
|
$11,700.000
|
$8,500.000
|
$7,900.000
|
$8,000.000
|
$11,100.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$600.000
|
$370.000
|
$770.000
|
$350.000
|
$630.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$899.000
|
$1,090.000
|
$1,700.000
|
$700.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,700.000
|
$996.000
|
$1,470.000
|
$1,884.000
|
$900.000
|
$942.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$600.000
|
$504.000
|
$640.000
|
$954.000
|
$450.000
|
$477.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$100.000
|
$89.900
|
$156.000
|
$170.000
|
$100.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$25.000
|
$29.600
|
$16.200
|
$28.000
|
$36.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$30.000
|
$94.100
|
$50.300
|
$89.000
|
$75.000
|
$89.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
31.000
|
$25.000
|
$29.600
|
$38.900
|
$28.000
|
$35.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$90.000
|
$94.100
|
$81.800
|
$89.000
|
$75.000
|
$89.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
7,910.000
|
$0.350
|
$0.480
|
$0.350
|
$0.450
|
$0.460
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
6,680.000
|
$0.400
|
$0.480
|
$0.350
|
$0.450
|
$0.460
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
11,842.000
|
$0.900
|
$0.690
|
$0.850
|
$0.640
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
40.000
|
$9.000
|
$4.250
|
$13.650
|
$4.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
11,968.000
|
$0.900
|
$0.690
|
$0.850
|
$0.650
|
$0.660
|
$0.650
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
12,350.000
|
$0.850
|
$1.050
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,667.000
|
$0.850
|
$1.200
|
$0.850
|
$1.150
|
$1.200
|
$1.150
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
4,060.000
|
$0.850
|
$1.150
|
$0.750
|
$1.100
|
$1.100
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
168.000
|
$6.500
|
$5.800
|
$7.550
|
$5.500
|
$5.500
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,997.000
|
$0.700
|
$0.370
|
$0.550
|
$0.350
|
$0.360
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
215.000
|
$3.650
|
$2.350
|
$2.700
|
$2.200
|
$2.200
|
$2.200
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
5,150.000
|
$0.500
|
$3.000
|
$0.550
|
$0.750
|
$6.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,174.000
|
$0.200
|
$0.130
|
$0.250
|
$0.120
|
$0.120
|
$0.120
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
3,035.000
|
$150.000
|
$122.000
|
$122.000
|
$111.000
|
$130.000
|
$115.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
2,768.000
|
$150.000
|
$159.000
|
$159.000
|
$145.000
|
$150.000
|
$150.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
422.000
|
$120.000
|
$169.000
|
$169.000
|
$196.000
|
$185.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$38.800
|
$16,500.000
|
$20,000.000
|
$8,000.000
|
$4,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
3.000
|
$10,000.000
|
$9,090.000
|
$13,000.000
|
$7,500.000
|
$8,000.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$350.000
|
$142.000
|
$340.000
|
$350.000
|
$350.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$300.000
|
$450.000
|
$244.000
|
$350.000
|
$350.000
|
$500.000
|
|
Totals: |
$8,178,337.600
|
$7,055,348.460
|
$7,881,129.410
|
$7,979,880.730
|
$7,984,668.810
|
$8,130,575.290
|