PREPARING ROW
|
STA
|
48.030
|
$3,000.000
|
$25,300.000
|
$4,000.000
|
$21,500.000
|
$29,298.150
|
$26,222.670
|
$29,223.000
|
$32,000.000
|
$18,200.000
|
$6,000.000
|
$32,000.000
|
$17,585.550
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,533.000
|
$11.000
|
$14.000
|
$11.500
|
$30.000
|
$3.920
|
$12.000
|
$18.000
|
$6.000
|
$10.000
|
$14.160
|
$8.000
|
$10.040
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
44,816.000
|
$15.000
|
$14.000
|
$13.000
|
$20.000
|
$25.000
|
$11.000
|
$12.000
|
$12.000
|
$15.000
|
$16.620
|
$20.000
|
$20.740
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$75.000
|
$107.000
|
$135.000
|
$206.510
|
$91.550
|
$220.000
|
$90.000
|
$90.000
|
$110.000
|
$275.000
|
$281.290
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
30,492.000
|
$1.500
|
$0.900
|
$2.250
|
$1.000
|
$2.050
|
$0.650
|
$1.000
|
$1.150
|
$1.000
|
$2.150
|
$1.310
|
$1.680
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
26,600.000
|
$0.200
|
$0.180
|
$0.150
|
$0.160
|
$0.160
|
$0.280
|
$0.160
|
$0.160
|
$0.280
|
$0.320
|
$0.280
|
$0.170
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
6,650.000
|
$0.200
|
$0.150
|
$0.550
|
$0.160
|
$0.160
|
$0.270
|
$0.540
|
$0.160
|
$0.270
|
$0.160
|
$0.270
|
$0.110
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
6,650.000
|
$0.200
|
$0.150
|
$0.550
|
$0.160
|
$0.160
|
$0.270
|
$0.540
|
$0.160
|
$0.270
|
$0.160
|
$0.270
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
257.000
|
$20.000
|
$15.000
|
$21.850
|
$25.000
|
$25.000
|
$24.400
|
$22.000
|
$15.000
|
$39.860
|
$14.850
|
$34.750
|
$39.110
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
3,892.000
|
$1.500
|
$1.300
|
$1.800
|
$1.000
|
$1.000
|
$1.370
|
$1.810
|
$1.100
|
$1.370
|
$1.780
|
$1.370
|
$1.680
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
44.000
|
$250.000
|
$1,300.000
|
$340.000
|
$325.000
|
$350.000
|
$1,298.100
|
$340.000
|
$410.000
|
$1,298.100
|
$378.530
|
$1,298.100
|
$502.840
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
3,168.000
|
$64.000
|
$68.000
|
$70.000
|
$57.000
|
$51.880
|
$76.790
|
$60.000
|
$63.000
|
$70.000
|
$75.470
|
$75.000
|
$92.240
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
9,755.000
|
$4.000
|
$3.200
|
$3.250
|
$3.000
|
$3.900
|
$4.160
|
$6.000
|
$3.100
|
$3.000
|
$6.530
|
$2.480
|
$9.420
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
116.000
|
$175.000
|
$155.000
|
$200.000
|
$198.000
|
$198.360
|
$213.660
|
$200.000
|
$220.000
|
$210.000
|
$204.310
|
$185.000
|
$244.840
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,771.000
|
$4.500
|
$5.000
|
$4.800
|
$5.500
|
$4.500
|
$5.990
|
$6.070
|
$5.800
|
$5.500
|
$7.350
|
$4.700
|
$6.150
|
|
|
ASPH (RC-250)
|
GAL
|
482.000
|
$5.000
|
$10.000
|
$7.450
|
$6.250
|
$7.000
|
$6.810
|
$6.890
|
$6.600
|
$6.250
|
$4.200
|
$7.310
|
$6.980
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
17.000
|
$150.000
|
$500.000
|
$400.000
|
$185.000
|
$375.000
|
$201.590
|
$204.050
|
$195.000
|
$185.000
|
$152.900
|
$391.860
|
$206.720
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
133.000
|
$140.000
|
$180.000
|
$191.000
|
$125.000
|
$180.000
|
$136.210
|
$137.870
|
$132.000
|
$125.000
|
$150.570
|
$188.090
|
$139.680
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
214.000
|
$140.000
|
$150.000
|
$165.000
|
$125.000
|
$155.000
|
$136.210
|
$137.870
|
$132.000
|
$125.000
|
$146.540
|
$161.970
|
$139.680
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
13,954.000
|
$4.000
|
$3.500
|
$3.450
|
$3.950
|
$3.250
|
$4.300
|
$4.360
|
$4.200
|
$3.950
|
$6.300
|
$3.400
|
$4.410
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,325.000
|
$40.000
|
$46.000
|
$83.000
|
$48.000
|
$34.870
|
$52.300
|
$53.000
|
$51.000
|
$48.000
|
$51.280
|
$80.800
|
$46.510
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
17,268.000
|
$4.000
|
$3.000
|
$4.800
|
$2.400
|
$1.040
|
$2.310
|
$5.000
|
$4.000
|
$3.750
|
$1.160
|
$1.040
|
$1.680
|
|
|
CEM STABIL BKFL
|
CY
|
356.000
|
$150.000
|
$150.000
|
$111.000
|
$75.000
|
$133.970
|
$122.410
|
$165.000
|
$163.000
|
$100.000
|
$183.750
|
$122.960
|
$115.620
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,900.000
|
$25.000
|
$3.000
|
$1.740
|
$4.000
|
$1.020
|
$2.000
|
$2.500
|
$0.010
|
$2.000
|
$48.370
|
$10.000
|
$20.600
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
242.000
|
$100.000
|
$70.000
|
$140.000
|
$60.000
|
$232.880
|
$129.710
|
$70.000
|
$67.000
|
$75.000
|
$238.370
|
$55.130
|
$215.340
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
858.000
|
$250.000
|
$190.000
|
$197.000
|
$155.000
|
$227.060
|
$192.340
|
$180.000
|
$186.000
|
$200.000
|
$253.400
|
$162.040
|
$255.110
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
996.000
|
$375.000
|
$260.000
|
$270.000
|
$215.000
|
$213.430
|
$300.370
|
$250.000
|
$260.000
|
$325.000
|
$332.020
|
$220.490
|
$314.540
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
2,208.000
|
$450.000
|
$460.000
|
$400.000
|
$370.000
|
$456.840
|
$426.240
|
$435.000
|
$455.000
|
$600.000
|
$620.110
|
$500.000
|
$366.490
|
|
|
CL C CONC (ABUT)
|
CY
|
76.800
|
$1,000.000
|
$750.000
|
$840.000
|
$750.000
|
$943.130
|
$700.000
|
$885.000
|
$1,080.000
|
$980.000
|
$1,196.610
|
$850.000
|
$1,246.020
|
|
|
CL C CONC (CAP)
|
CY
|
120.000
|
$1,100.000
|
$750.000
|
$1,040.000
|
$1,050.000
|
$993.640
|
$900.000
|
$1,085.000
|
$1,220.000
|
$1,200.000
|
$1,340.300
|
$1,700.000
|
$1,752.850
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
370.000
|
$1,200.000
|
$850.000
|
$1,000.000
|
$1,060.000
|
$849.120
|
$800.000
|
$1,100.000
|
$970.000
|
$1,275.000
|
$1,285.300
|
$1,725.000
|
$1,994.530
|
|
|
CL C CONC (COLUMN)
|
CY
|
403.700
|
$1,200.000
|
$800.000
|
$825.000
|
$750.000
|
$903.520
|
$750.000
|
$915.000
|
$1,060.000
|
$1,150.000
|
$882.900
|
$1,000.000
|
$794.010
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
223.200
|
$1,000.000
|
$850.000
|
$1,030.000
|
$850.000
|
$1,128.890
|
$750.000
|
$950.000
|
$900.000
|
$1,160.000
|
$1,130.500
|
$900.000
|
$1,369.550
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
530.400
|
$750.000
|
$850.000
|
$820.000
|
$760.000
|
$568.550
|
$650.000
|
$715.000
|
$845.000
|
$1,390.000
|
$965.290
|
$300.000
|
$954.490
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
4.500
|
$500.000
|
$740.000
|
$830.000
|
$525.000
|
$475.370
|
$950.000
|
$600.000
|
$660.000
|
$950.000
|
$1,650.000
|
$850.000
|
$1,627.540
|
|
|
REINF CONC SLAB
|
SF
|
74,200.000
|
$16.000
|
$16.500
|
$15.000
|
$17.000
|
$16.620
|
$18.010
|
$16.000
|
$20.800
|
$19.950
|
$16.110
|
$15.250
|
$29.450
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
4,875.710
|
$150.000
|
$136.000
|
$130.000
|
$135.000
|
$116.530
|
$150.000
|
$150.000
|
$127.000
|
$165.000
|
$148.760
|
$140.000
|
$151.620
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
90.000
|
$500.000
|
$460.000
|
$530.000
|
$450.000
|
$302.170
|
$301.140
|
$500.000
|
$585.000
|
$525.000
|
$550.000
|
$495.400
|
$469.650
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,690.000
|
$150.000
|
$110.000
|
$129.000
|
$115.000
|
$83.290
|
$125.150
|
$145.000
|
$140.000
|
$140.000
|
$182.030
|
$40.230
|
$196.460
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,047.000
|
$150.000
|
$125.000
|
$148.000
|
$120.000
|
$85.310
|
$124.070
|
$152.000
|
$155.000
|
$140.000
|
$264.630
|
$46.270
|
$200.860
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.000
|
$450.000
|
$530.000
|
$630.000
|
$435.000
|
$557.720
|
$495.730
|
$460.000
|
$660.000
|
$550.000
|
$1,100.000
|
$465.000
|
$783.700
|
|
|
ELASTOMERIC BEARING (E7)
|
EA
|
14.000
|
$2,000.000
|
$2,000.000
|
$3,900.000
|
$2,200.000
|
$3,205.120
|
$1,895.790
|
$2,600.000
|
$3,500.000
|
$3,100.000
|
$3,500.000
|
$2,738.170
|
$3,352.250
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
7.000
|
$2,000.000
|
$2,500.000
|
$4,370.000
|
$2,200.000
|
$3,922.120
|
$2,668.090
|
$2,510.000
|
$3,500.000
|
$3,975.000
|
$3,000.000
|
$2,719.010
|
$3,352.250
|
|
|
SLIDING ELASTOMERIC BEARING (ES 4)
|
EA
|
14.000
|
$1,900.000
|
$2,500.000
|
$3,350.000
|
$1,475.000
|
$3,922.120
|
$2,668.090
|
$1,800.000
|
$2,750.000
|
$3,975.000
|
$4,000.000
|
$2,155.710
|
$1,676.120
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,331,000.000
|
$1.500
|
$1.350
|
$1.580
|
$1.400
|
$1.240
|
$1.690
|
$1.450
|
$1.390
|
$1.800
|
$1.600
|
$1.800
|
$1.830
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
385.000
|
$10.000
|
$14.000
|
$21.890
|
$17.000
|
$10.550
|
$10.990
|
$15.000
|
$14.000
|
$15.000
|
$38.500
|
$24.180
|
$16.350
|
|
|
RAIL (TY T223)
|
LF
|
1,432.000
|
$100.000
|
$72.000
|
$75.800
|
$75.000
|
$131.920
|
$64.720
|
$110.000
|
$156.000
|
$130.000
|
$60.810
|
$62.790
|
$146.110
|
|
|
RAIL (TY C223)
|
LF
|
2,864.000
|
$120.000
|
$90.000
|
$95.000
|
$95.000
|
$133.760
|
$97.720
|
$140.000
|
$181.000
|
$150.000
|
$89.090
|
$83.860
|
$178.430
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
226.000
|
$140.000
|
$124.000
|
$142.000
|
$120.000
|
$145.410
|
$106.650
|
$160.000
|
$133.000
|
$150.000
|
$147.400
|
$115.180
|
$133.630
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
276.000
|
$80.000
|
$70.000
|
$88.500
|
$50.000
|
$56.950
|
$74.460
|
$115.000
|
$72.000
|
$95.000
|
$102.890
|
$250.000
|
$103.780
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
220.000
|
$100.000
|
$75.000
|
$102.000
|
$65.000
|
$59.790
|
$86.290
|
$146.000
|
$86.000
|
$100.000
|
$118.020
|
$300.000
|
$129.570
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$6,000.000
|
$4,000.000
|
$4,490.000
|
$2,800.000
|
$3,553.490
|
$3,751.140
|
$6,100.000
|
$4,450.000
|
$3,925.000
|
$4,213.970
|
$10,000.000
|
$6,772.870
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$4,000.000
|
$4,360.000
|
$4,700.000
|
$4,279.890
|
$5,824.620
|
$6,200.000
|
$4,350.000
|
$4,050.000
|
$4,346.410
|
$10,000.000
|
$6,772.870
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,500.000
|
$1,200.000
|
$1,360.000
|
$700.000
|
$2,568.220
|
$1,369.050
|
$1,970.000
|
$2,300.000
|
$1,000.000
|
$1,889.630
|
$2,500.000
|
$1,695.480
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,300.000
|
$1,730.000
|
$1,080.000
|
$2,350.070
|
$1,476.770
|
$2,500.000
|
$2,300.000
|
$1,700.000
|
$2,283.100
|
$3,000.000
|
$2,247.570
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,950.000
|
$1,800.000
|
$2,010.000
|
$1,130.000
|
$2,516.090
|
$2,123.040
|
$2,500.000
|
$2,300.000
|
$2,050.000
|
$2,283.100
|
$3,000.000
|
$2,850.930
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$300.000
|
$1,030.000
|
$450.000
|
$985.040
|
$571.290
|
$525.000
|
$1,350.000
|
$675.000
|
$5,500.000
|
$1,998.800
|
$444.440
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$750.000
|
$700.000
|
$2,730.000
|
$450.000
|
$985.040
|
$571.300
|
$750.000
|
$1,100.000
|
$1,700.000
|
$3,850.000
|
$1,998.800
|
$442.510
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,280,000.000
|
$1,000,000.000
|
$1,200,000.000
|
$1,390,000.000
|
$1,400,000.000
|
$1,500,000.000
|
$1,313,890.000
|
$1,168,000.000
|
$500,000.000
|
$1,600,000.000
|
$1,673,979.670
|
$1,834,180.390
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$4,000.000
|
$1,000.000
|
$1,780.000
|
$2,300.000
|
$2,626.100
|
$2,466.160
|
$2,100.000
|
$3,800.000
|
$3,000.000
|
$2,000.000
|
$15,000.000
|
$2,317.190
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
250.000
|
$30.000
|
$28.000
|
$22.000
|
$30.070
|
$30.070
|
$30.070
|
$28.000
|
$36.500
|
$30.070
|
$107.990
|
$30.070
|
$24.580
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
250.000
|
$10.000
|
$9.000
|
$9.000
|
$10.580
|
$10.580
|
$10.580
|
$20.000
|
$11.700
|
$10.580
|
$19.080
|
$10.580
|
$8.940
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$25.000
|
$25.000
|
$27.300
|
$28.110
|
$28.110
|
$28.110
|
$28.000
|
$34.000
|
$28.110
|
$70.250
|
$28.110
|
$14.530
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$7.000
|
$10.000
|
$5.700
|
$8.870
|
$8.870
|
$8.880
|
$21.000
|
$9.800
|
$8.870
|
$22.000
|
$8.870
|
$2.230
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,463.000
|
$3.000
|
$3.500
|
$2.550
|
$2.140
|
$2.140
|
$2.140
|
$3.500
|
$2.600
|
$2.140
|
$3.650
|
$2.140
|
$2.070
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,463.000
|
$1.000
|
$0.750
|
$0.500
|
$0.470
|
$0.470
|
$0.470
|
$1.000
|
$0.520
|
$0.470
|
$1.850
|
$0.470
|
$0.890
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,020.000
|
$35.000
|
$40.000
|
$15.550
|
$40.000
|
$67.780
|
$35.500
|
$55.000
|
$19.000
|
$60.000
|
$28.080
|
$70.000
|
$86.740
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$50.000
|
$40.000
|
$15.550
|
$40.000
|
$47.330
|
$33.400
|
$55.000
|
$46.000
|
$60.000
|
$33.580
|
$70.000
|
$90.920
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,020.000
|
$10.000
|
$20.000
|
$15.550
|
$8.500
|
$8.490
|
$8.340
|
$3.250
|
$8.000
|
$10.000
|
$20.160
|
$6.330
|
$18.850
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$20.000
|
$20.000
|
$15.550
|
$13.000
|
$15.520
|
$9.460
|
$6.900
|
$8.800
|
$10.000
|
$20.160
|
$6.330
|
$18.820
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,317.000
|
$25.000
|
$24.000
|
$15.700
|
$21.500
|
$21.990
|
$19.650
|
$34.000
|
$25.500
|
$30.000
|
$66.000
|
$25.760
|
$30.120
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,049.000
|
$40.000
|
$38.000
|
$88.700
|
$24.000
|
$42.000
|
$46.900
|
$52.000
|
$41.500
|
$50.000
|
$45.240
|
$43.890
|
$26.820
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,514.000
|
$30.000
|
$16.000
|
$75.000
|
$19.500
|
$7.500
|
$37.450
|
$40.000
|
$65.000
|
$45.000
|
$60.500
|
$7.840
|
$21.790
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,171.000
|
$50.000
|
$64.000
|
$61.000
|
$44.000
|
$55.500
|
$46.040
|
$127.000
|
$65.000
|
$70.000
|
$121.000
|
$73.500
|
$71.100
|
|
|
CURB RAMPS
|
SY
|
63.000
|
$250.000
|
$120.000
|
$280.000
|
$135.000
|
$126.900
|
$133.600
|
$265.000
|
$147.000
|
$275.000
|
$275.000
|
$230.000
|
$178.710
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$25.000
|
$22.000
|
$21.800
|
$17.250
|
$17.000
|
$17.250
|
$22.000
|
$22.500
|
$17.000
|
$22.310
|
$17.250
|
$23.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$1,800.000
|
$1,410.000
|
$1,700.000
|
$1,500.000
|
$1,700.000
|
$1,404.000
|
$1,442.000
|
$1,500.000
|
$1,440.860
|
$1,700.000
|
$1,533.370
|
|
|
MTL W-BEAM GD FEN (NESTED)(TIM POST)
|
LF
|
50.000
|
$30.000
|
$26.000
|
$26.500
|
$22.500
|
$24.000
|
$22.500
|
$27.000
|
$27.500
|
$24.000
|
$27.140
|
$22.500
|
$28.890
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$2.500
|
$1.500
|
$1.550
|
$2.000
|
$2.000
|
$2.000
|
$1.600
|
$1.600
|
$2.000
|
$10.500
|
$2.000
|
$1.690
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$175.000
|
$150.000
|
$148.000
|
$500.000
|
$75.000
|
$500.000
|
$148.000
|
$152.000
|
$75.000
|
$167.360
|
$500.000
|
$161.470
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$2,700.000
|
$2,740.000
|
$2,425.000
|
$2,200.000
|
$2,425.000
|
$2,733.000
|
$2,810.000
|
$2,200.000
|
$2,805.130
|
$2,425.000
|
$2,985.230
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
5.000
|
$200.000
|
$180.000
|
$205.000
|
$205.000
|
$180.000
|
$205.000
|
$179.000
|
$190.000
|
$180.000
|
$315.000
|
$205.000
|
$195.550
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$250.000
|
$190.000
|
$260.000
|
$280.000
|
$200.000
|
$280.000
|
$190.000
|
$210.000
|
$200.000
|
$315.000
|
$280.000
|
$206.730
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$500.000
|
$480.000
|
$470.000
|
$435.000
|
$475.000
|
$435.000
|
$476.000
|
$500.000
|
$475.000
|
$721.280
|
$435.000
|
$519.590
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$700.000
|
$520.000
|
$610.000
|
$530.000
|
$475.000
|
$530.000
|
$522.000
|
$500.000
|
$475.000
|
$442.560
|
$530.000
|
$569.880
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
10.000
|
$400.000
|
$285.000
|
$350.000
|
$280.000
|
$300.000
|
$280.000
|
$287.000
|
$315.000
|
$300.000
|
$1,019.370
|
$280.000
|
$312.880
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$450.000
|
$320.000
|
$470.000
|
$300.000
|
$360.000
|
$300.000
|
$318.000
|
$378.000
|
$360.000
|
$323.280
|
$300.000
|
$346.400
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$80.000
|
$60.000
|
$66.700
|
$50.000
|
$45.000
|
$50.000
|
$98.000
|
$47.500
|
$45.000
|
$118.130
|
$50.000
|
$106.150
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$20.000
|
$33.000
|
$33.850
|
$28.000
|
$15.000
|
$28.000
|
$20.000
|
$16.000
|
$15.000
|
$22.510
|
$28.000
|
$50.280
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
2.000
|
$60.000
|
$50.000
|
$51.300
|
$48.000
|
$75.000
|
$48.000
|
$60.000
|
$79.000
|
$75.000
|
$525.000
|
$48.000
|
$83.810
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
37,638.000
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.670
|
$0.670
|
$0.600
|
$0.700
|
$0.670
|
$1.190
|
$0.850
|
$0.660
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
2,520.000
|
$0.900
|
$0.660
|
$0.650
|
$0.900
|
$0.670
|
$0.670
|
$0.660
|
$0.700
|
$0.670
|
$1.380
|
$0.850
|
$0.730
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
40,038.000
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.670
|
$0.670
|
$0.600
|
$0.700
|
$0.670
|
$1.190
|
$0.850
|
$0.660
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,903.000
|
$1.500
|
$1.600
|
$1.200
|
$1.000
|
$1.270
|
$0.850
|
$1.500
|
$0.800
|
$1.000
|
$0.390
|
$1.070
|
$1.230
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
9,626.000
|
$0.500
|
$0.400
|
$0.400
|
$0.710
|
$0.500
|
$0.500
|
$0.400
|
$0.530
|
$0.500
|
$0.630
|
$0.450
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
630.000
|
$0.500
|
$0.420
|
$0.400
|
$0.750
|
$0.500
|
$0.500
|
$0.420
|
$0.530
|
$0.500
|
$0.870
|
$0.450
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
10,226.000
|
$0.500
|
$0.420
|
$0.400
|
$0.710
|
$0.500
|
$0.500
|
$0.420
|
$0.530
|
$0.500
|
$0.650
|
$0.450
|
$0.460
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$310.000
|
$440.000
|
$200.000
|
$200.000
|
$307.000
|
$210.000
|
$200.000
|
$211.970
|
$250.000
|
$335.230
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
205.000
|
$4.750
|
$4.000
|
$4.100
|
$7.900
|
$6.000
|
$6.000
|
$4.100
|
$6.300
|
$6.000
|
$4.220
|
$5.000
|
$4.470
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,700.000
|
$0.400
|
$0.560
|
$0.550
|
$0.790
|
$0.400
|
$0.400
|
$0.600
|
$0.420
|
$0.400
|
$0.870
|
$0.450
|
$0.610
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
125.000
|
$5.000
|
$3.000
|
$3.100
|
$7.900
|
$3.000
|
$3.000
|
$3.100
|
$3.150
|
$3.000
|
$3.240
|
$5.000
|
$3.350
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,010.000
|
$90.000
|
$85.000
|
$115.000
|
$83.000
|
$102.000
|
$90.440
|
$92.000
|
$88.000
|
$83.000
|
$105.000
|
$106.590
|
$92.750
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
4,155.000
|
$100.000
|
$90.000
|
$114.000
|
$98.000
|
$100.000
|
$106.790
|
$109.000
|
$103.000
|
$98.000
|
$126.000
|
$104.500
|
$109.510
|
|
|
TACK COAT
|
GAL
|
2,518.000
|
$4.000
|
$5.000
|
$3.200
|
$4.500
|
$3.000
|
$4.900
|
$5.000
|
$4.750
|
$4.500
|
$4.200
|
$3.130
|
$5.030
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
6.000
|
$7,000.000
|
$3,500.000
|
$330.000
|
$2,980.000
|
$6,000.000
|
$4,116.420
|
$3,450.000
|
$3,500.000
|
$7,282.000
|
$7,000.000
|
$3,307.210
|
$25,174.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$13,000.000
|
$9,200.000
|
$10,000.000
|
$16,616.380
|
$4,308.480
|
$5,000.000
|
$5,000.000
|
$6,750.000
|
$14,000.000
|
$15,000.000
|
$18,947.060
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
48.000
|
$200.000
|
$50.000
|
$200.000
|
$45.000
|
$25.000
|
$75.000
|
$60.000
|
$82.000
|
$50.000
|
$210.000
|
$50.700
|
$55.870
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$250.000
|
$245.000
|
$350.000
|
$189.400
|
$161.570
|
$300.000
|
$410.000
|
$300.000
|
$315.000
|
$279.460
|
$167.610
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$500.000
|
$250.000
|
$200.000
|
$250.000
|
$407.220
|
$459.540
|
$300.000
|
$500.000
|
$400.000
|
$525.000
|
$511.020
|
$731.560
|
|
Totals: |
$14,271,310.850
|
$13,635,356.230
|
$13,800,972.200
|
$13,954,778.360
|
$14,582,466.672
|
$15,017,304.980
|
$15,049,206.060
|
$15,337,588.440
|
$15,987,543.720
|
$16,365,365.004
|
$16,739,796.740
|
$18,490,230.366
|