|
|
|
PREPARING ROW
|
STA
|
8.000
|
$3,500.000
|
$4,720.000
|
$2,689.000
|
$5,500.000
|
$4,026.500
|
$3,900.000
|
$60,000.000
|
$2,900.000
|
$5,900.000
|
$4,500.000
|
$20,000.000
|
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
491.000
|
$17.000
|
$14.600
|
$14.500
|
$20.000
|
$23.800
|
$1.000
|
$9.220
|
$18.000
|
$56.000
|
$15.000
|
$25.000
|
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
CY
|
909.000
|
$9.500
|
$15.500
|
$16.800
|
$20.000
|
$13.600
|
$30.000
|
$9.220
|
$23.000
|
$32.000
|
$60.000
|
$35.000
|
|
|
|
RMV (22") TRT/UNTRT BASE & ASPH PAV
|
CY
|
286.300
|
$17.000
|
$26.400
|
$17.800
|
$20.000
|
$27.200
|
$16.000
|
$9.220
|
$36.000
|
$45.000
|
$60.000
|
$25.000
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,329.000
|
$17.500
|
$11.700
|
$18.650
|
$19.000
|
$23.800
|
$18.000
|
$18.290
|
$22.000
|
$24.000
|
$15.000
|
$30.000
|
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,519.000
|
$13.000
|
$16.700
|
$8.600
|
$19.000
|
$23.800
|
$22.000
|
$18.290
|
$18.000
|
$30.000
|
$12.000
|
$40.000
|
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
10,430.000
|
$22.000
|
$17.400
|
$13.000
|
$21.000
|
$29.400
|
$21.000
|
$30.480
|
$38.000
|
$29.000
|
$25.000
|
$40.000
|
|
|
|
BLADING
|
HR
|
40.000
|
$100.000
|
$48.400
|
$142.000
|
$150.000
|
$103.500
|
$150.000
|
$106.690
|
$60.000
|
$180.500
|
$20.000
|
$200.000
|
|
|
|
FURN & PLACE TOPSOIL (VEH)
|
CY
|
211.000
|
$11.000
|
$18.100
|
$43.000
|
$30.000
|
$27.000
|
$64.000
|
$6.350
|
$40.000
|
$59.000
|
$50.000
|
$52.000
|
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
5,921.000
|
$0.500
|
$0.390
|
$0.180
|
$0.400
|
$0.450
|
$0.170
|
$1.020
|
$0.500
|
$0.500
|
$1.500
|
$0.200
|
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
1,480.000
|
$0.500
|
$0.590
|
$0.180
|
$0.610
|
$1.200
|
$0.170
|
$1.020
|
$0.500
|
$0.600
|
$1.000
|
$0.200
|
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
1,480.000
|
$0.500
|
$0.590
|
$0.180
|
$0.610
|
$1.200
|
$0.170
|
$1.020
|
$0.500
|
$0.600
|
$1.000
|
$0.200
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
51.000
|
$70.000
|
$38.200
|
$56.000
|
$50.000
|
$20.400
|
$81.000
|
$106.690
|
$60.000
|
$26.250
|
$1.000
|
$215.000
|
|
|
|
SOIL RET BLKT(SL_MOD_SAND_SHORT)
|
SY
|
3,706.000
|
$2.500
|
$1.400
|
$2.000
|
$1.430
|
$2.500
|
$2.000
|
$10.160
|
$4.000
|
$1.500
|
$3.000
|
$2.000
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
1,385.300
|
$95.000
|
$121.000
|
$97.700
|
$150.000
|
$99.180
|
$165.000
|
$82.880
|
$96.000
|
$101.000
|
$70.000
|
$135.000
|
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
51.500
|
$300.000
|
$223.000
|
$360.700
|
$250.000
|
$550.000
|
$400.000
|
$355.620
|
$608.000
|
$372.000
|
$350.000
|
$430.000
|
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
3,210.000
|
$4.500
|
$5.100
|
$14.600
|
$8.000
|
$4.600
|
$10.000
|
$7.110
|
$10.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
|
CEMENT
|
TON
|
31.600
|
$215.000
|
$326.000
|
$238.000
|
$250.000
|
$330.000
|
$433.000
|
$304.820
|
$285.000
|
$291.000
|
$350.000
|
$465.000
|
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
3,210.000
|
$4.250
|
$3.750
|
$7.500
|
$8.000
|
$4.600
|
$8.000
|
$7.110
|
$10.000
|
$8.000
|
$15.000
|
$15.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,184.000
|
$8.000
|
$6.800
|
$9.000
|
$5.500
|
$10.100
|
$6.000
|
$6.100
|
$8.000
|
$6.500
|
$10.000
|
$7.000
|
|
|
|
AGGR (TY-PE, GR-4)(SAC-B)
|
CY
|
83.800
|
$350.000
|
$317.000
|
$386.000
|
$200.000
|
$366.350
|
$223.000
|
$226.580
|
$514.000
|
$466.000
|
$650.000
|
$260.000
|
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
3,657.000
|
$6.000
|
$5.800
|
$6.750
|
$6.000
|
$7.800
|
$5.000
|
$4.570
|
$7.500
|
$6.000
|
$10.000
|
$5.000
|
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
944.600
|
$95.000
|
$141.000
|
$128.000
|
$110.000
|
$141.900
|
$133.000
|
$135.140
|
$173.000
|
$150.000
|
$200.000
|
$145.000
|
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,507.300
|
$110.000
|
$157.000
|
$139.000
|
$130.000
|
$130.200
|
$148.000
|
$150.380
|
$174.000
|
$175.000
|
$175.000
|
$150.000
|
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
685.100
|
$115.000
|
$157.000
|
$149.000
|
$120.000
|
$146.300
|
$148.000
|
$150.380
|
$235.000
|
$210.000
|
$200.000
|
$170.000
|
|
|
|
TACK COAT
|
GAL
|
1,702.000
|
$5.000
|
$5.300
|
$4.000
|
$6.000
|
$5.090
|
$5.000
|
$5.080
|
$4.500
|
$4.000
|
$8.000
|
$6.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
578.000
|
$100.000
|
$185.000
|
$175.300
|
$180.000
|
$170.000
|
$340.000
|
$133.100
|
$180.000
|
$230.000
|
$200.000
|
$230.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
365.000
|
$10.000
|
$4.400
|
$14.600
|
$15.000
|
$9.000
|
$1.000
|
$20.320
|
$15.000
|
$16.000
|
$5.000
|
$14.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,981.000
|
$20.000
|
$23.300
|
$27.850
|
$26.000
|
$29.000
|
$17.000
|
$3.560
|
$60.000
|
$39.900
|
$35.000
|
$35.000
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
230.000
|
$160.000
|
$66.600
|
$83.300
|
$300.000
|
$162.890
|
$98.000
|
$183.100
|
$153.000
|
$92.000
|
$130.000
|
$195.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,610.000
|
$295.000
|
$246.000
|
$260.500
|
$325.000
|
$286.340
|
$384.000
|
$274.000
|
$270.000
|
$293.000
|
$230.000
|
$285.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
100.400
|
$1,150.000
|
$1,000.000
|
$1,393.400
|
$1,043.000
|
$1,650.000
|
$1,700.000
|
$1,527.380
|
$1,400.000
|
$1,635.000
|
$1,900.000
|
$1,950.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
68.900
|
$1,150.000
|
$1,350.000
|
$1,336.000
|
$1,337.000
|
$1,950.000
|
$1,600.000
|
$1,290.410
|
$1,900.000
|
$1,985.000
|
$2,000.000
|
$2,000.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
37.600
|
$1,300.000
|
$1,560.000
|
$1,222.000
|
$1,337.000
|
$1,050.000
|
$1,200.000
|
$1,379.970
|
$1,900.000
|
$1,709.000
|
$2,200.000
|
$2,000.000
|
|
|
|
REINF CONC SLAB
|
SF
|
10,175.000
|
$21.000
|
$27.000
|
$37.000
|
$27.550
|
$30.000
|
$27.000
|
$25.490
|
$24.000
|
$41.000
|
$40.000
|
$25.000
|
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,473.500
|
$190.000
|
$247.000
|
$234.000
|
$200.000
|
$215.000
|
$275.000
|
$192.420
|
$275.000
|
$251.000
|
$300.000
|
$230.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
16.000
|
$185.000
|
$230.000
|
$326.000
|
$300.000
|
$200.000
|
$230.000
|
$144.790
|
$160.000
|
$203.000
|
$500.000
|
$240.000
|
|
|
|
RIPRAP (STONE PROTECTION)(36 IN)
|
CY
|
3,072.000
|
$230.000
|
$246.000
|
$200.000
|
$205.000
|
$185.000
|
$143.000
|
$173.830
|
$170.000
|
$180.000
|
$200.000
|
$288.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
450.000
|
$80.000
|
$127.000
|
$144.000
|
$95.000
|
$104.400
|
$96.000
|
$169.680
|
$120.000
|
$167.000
|
$120.000
|
$100.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
151.000
|
$190.000
|
$257.000
|
$248.000
|
$215.000
|
$263.870
|
$280.000
|
$213.880
|
$287.000
|
$281.000
|
$250.000
|
$270.000
|
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$6,000.000
|
$7,910.000
|
$7,085.000
|
$11,750.000
|
$9,500.000
|
$16,491.000
|
$5,613.730
|
$6,633.000
|
$3,400.000
|
$6,000.000
|
$3,500.000
|
|
|
|
INLET (COMPL)(PSL)(RH)(3FTX3FT)
|
EA
|
1.000
|
$5,500.000
|
$6,390.000
|
$6,551.000
|
$10,600.000
|
$9,000.000
|
$13,045.000
|
$5,613.730
|
$7,600.000
|
$5,700.000
|
$6,000.000
|
$5,800.000
|
|
|
|
HEADWALL (CH - FW - 45) (DIA= 18 IN)
|
EA
|
1.000
|
$7,000.000
|
$4,190.000
|
$12,300.000
|
$5,350.000
|
$5,500.000
|
$13,504.000
|
$11,633.890
|
$8,000.000
|
$6,200.000
|
$15,000.000
|
$6,350.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$2,020.000
|
$2,078.000
|
$2,200.000
|
$1,300.000
|
$5,160.000
|
$1,447.890
|
$1,750.000
|
$1,500.000
|
$3,000.000
|
$1,045.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$2,370.000
|
$2,008.000
|
$2,200.000
|
$2,400.000
|
$5,160.000
|
$1,549.490
|
$2,500.000
|
$2,900.000
|
$3,000.000
|
$2,900.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,950.000
|
$2,500.000
|
$2,388.000
|
$2,200.000
|
$3,000.000
|
$5,161.000
|
$1,701.900
|
$2,800.000
|
$4,000.000
|
$4,000.000
|
$4,100.000
|
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,000.000
|
$903.000
|
$1,951.000
|
$1,200.000
|
$3,250.000
|
$2,188.000
|
$533.430
|
$1,800.000
|
$2,808.000
|
$3,000.000
|
$2,900.000
|
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$40,000.000
|
$26,400.000
|
$31,521.000
|
$150,000.000
|
$37,799.890
|
$27,896.000
|
$50,803.000
|
$30,000.000
|
$63,000.000
|
$250,000.000
|
$75,000.000
|
|
|
|
REMOV STR (SMALL)
|
EA
|
6.000
|
$950.000
|
$335.000
|
$860.000
|
$3,500.000
|
$4,500.000
|
$2,000.000
|
$2,667.160
|
$500.000
|
$1,700.000
|
$2,000.000
|
$5,500.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,000.000
|
$325,000.000
|
$368,791.000
|
$395,000.000
|
$415,109.770
|
$400,000.000
|
$450,000.000
|
$400,200.000
|
$527,000.000
|
$500,000.000
|
$555,069.150
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,500.000
|
$4,890.000
|
$3,685.000
|
$4,500.000
|
$3,207.310
|
$2,500.000
|
$4,191.250
|
$3,200.000
|
$2,100.000
|
$6,700.000
|
$13,500.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$6,740.000
|
$8,184.000
|
$15,000.000
|
$7,720.030
|
$3,500.000
|
$15,240.900
|
$8,000.000
|
$13,500.000
|
$30,000.000
|
$20,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$139.000
|
$578.000
|
$250.000
|
$154.400
|
$150.000
|
$1,016.060
|
$60.000
|
$309.000
|
$300.000
|
$875.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$350.000
|
$351.000
|
$927.000
|
$250.000
|
$154.400
|
$100.000
|
$152.410
|
$60.000
|
$529.000
|
$300.000
|
$1,635.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
484.000
|
$35.000
|
$54.000
|
$48.000
|
$55.000
|
$46.300
|
$44.000
|
$50.800
|
$40.000
|
$56.000
|
$1.000
|
$50.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
484.000
|
$10.000
|
$13.000
|
$16.000
|
$13.200
|
$14.700
|
$15.000
|
$20.320
|
$10.000
|
$13.500
|
$1.000
|
$18.000
|
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
30.000
|
$10.000
|
$21.600
|
$24.000
|
$22.000
|
$10.000
|
$23.000
|
$20.320
|
$2.500
|
$22.500
|
$1.000
|
$26.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,720.000
|
$4.000
|
$4.150
|
$3.000
|
$4.240
|
$4.000
|
$3.000
|
$5.080
|
$5.000
|
$4.500
|
$1.000
|
$3.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,720.000
|
$1.000
|
$1.200
|
$1.500
|
$1.210
|
$1.000
|
$1.000
|
$2.030
|
$1.000
|
$1.250
|
$1.000
|
$1.500
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,170.000
|
$40.000
|
$22.800
|
$24.750
|
$22.000
|
$60.000
|
$50.000
|
$81.790
|
$95.000
|
$41.800
|
$120.000
|
$98.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,170.000
|
$15.000
|
$6.300
|
$5.000
|
$11.000
|
$10.000
|
$10.000
|
$10.670
|
$20.000
|
$10.200
|
$15.000
|
$20.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,170.000
|
$15.000
|
$23.200
|
$24.750
|
$22.000
|
$25.000
|
$17.000
|
$10.670
|
$25.000
|
$29.010
|
$50.000
|
$17.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
397.000
|
$35.000
|
$48.500
|
$51.000
|
$100.000
|
$49.500
|
$39.000
|
$19.310
|
$50.000
|
$78.500
|
$15.000
|
$22.000
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
4,213.000
|
$1.000
|
$0.530
|
$0.400
|
$0.550
|
$0.940
|
$1.000
|
$5.080
|
$1.250
|
$1.250
|
$1.250
|
$0.550
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
2,107.000
|
$1.000
|
$0.530
|
$0.600
|
$0.550
|
$1.410
|
$1.000
|
$5.080
|
$1.880
|
$1.250
|
$1.250
|
$0.550
|
|
|
|
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
|
LF
|
1,052.000
|
$3.000
|
$2.850
|
$10.000
|
$5.500
|
$3.400
|
$10.000
|
$5.080
|
$2.000
|
$21.750
|
$3.000
|
$7.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$25.000
|
$27.300
|
$27.000
|
$27.500
|
$24.630
|
$25.000
|
$35.560
|
$30.000
|
$27.000
|
$25.000
|
$27.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,200.000
|
$2,390.000
|
$2,011.000
|
$2,035.000
|
$1,891.000
|
$1,891.000
|
$2,540.150
|
$2,290.000
|
$2,475.000
|
$1,600.000
|
$2,100.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$2.400
|
$1.150
|
$2.700
|
$2.750
|
$3.500
|
$4.000
|
$5.080
|
$4.000
|
$1.200
|
$2.000
|
$1.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$150.000
|
$228.000
|
$271.000
|
$275.000
|
$275.000
|
$450.000
|
$508.030
|
$332.000
|
$225.000
|
$500.000
|
$230.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$250.000
|
$228.000
|
$271.000
|
$275.000
|
$345.680
|
$275.000
|
$508.030
|
$332.000
|
$225.000
|
$300.000
|
$230.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,800.000
|
$3,410.000
|
$3,261.000
|
$3,300.000
|
$3,292.000
|
$3,292.000
|
$3,556.210
|
$3,980.000
|
$3,400.000
|
$3,000.000
|
$3,400.000
|
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
4.000
|
$900.000
|
$1,140.000
|
$1,630.500
|
$1,650.000
|
$1,325.000
|
$1,325.000
|
$1,524.090
|
$1,600.000
|
$1,123.000
|
$1,200.000
|
$1,100.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$225.000
|
$910.000
|
$271.750
|
$275.000
|
$275.000
|
$275.000
|
$1,016.060
|
$333.000
|
$898.500
|
$500.000
|
$925.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$1,140.000
|
$995.000
|
$800.000
|
$800.000
|
$800.000
|
$2,540.150
|
$1,210.000
|
$1,123.000
|
$2,500.000
|
$1,100.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$910.000
|
$995.000
|
$500.000
|
$700.000
|
$499.000
|
$1,016.060
|
$1,150.000
|
$898.500
|
$1,200.000
|
$925.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,000.000
|
$9,100.000
|
$3,001.000
|
$8,500.000
|
$8,125.000
|
$8,125.000
|
$35,562.100
|
$9,075.000
|
$9,000.000
|
$10,000.000
|
$9,500.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$450.000
|
$635.000
|
$603.000
|
$550.000
|
$747.610
|
$500.000
|
$563.910
|
$500.000
|
$674.000
|
$500.000
|
$695.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$300.000
|
$317.000
|
$349.000
|
$330.000
|
$747.610
|
$300.000
|
$326.160
|
$500.000
|
$337.050
|
$800.000
|
$350.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
5.000
|
$350.000
|
$455.000
|
$777.000
|
$508.750
|
$801.230
|
$463.000
|
$726.480
|
$570.000
|
$482.850
|
$1,200.000
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$410.000
|
$476.000
|
$777.000
|
$632.500
|
$1,037.370
|
$575.000
|
$726.480
|
$650.000
|
$505.000
|
$1,200.000
|
$520.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
1.000
|
$250.000
|
$317.000
|
$598.000
|
$275.000
|
$443.410
|
$250.000
|
$558.830
|
$350.000
|
$337.000
|
$1,200.000
|
$350.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$100.000
|
$106.000
|
$136.000
|
$110.000
|
$103.120
|
$170.000
|
$127.010
|
$100.000
|
$112.000
|
$200.000
|
$120.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
20.000
|
$15.000
|
$21.200
|
$24.000
|
$26.400
|
$53.620
|
$24.000
|
$12.190
|
$35.000
|
$22.500
|
$30.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
37.000
|
$26.000
|
$21.200
|
$27.000
|
$48.400
|
$62.900
|
$44.000
|
$28.450
|
$60.000
|
$22.500
|
$30.000
|
$25.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
7,644.000
|
$1.000
|
$1.050
|
$1.090
|
$1.100
|
$1.060
|
$1.000
|
$2.540
|
$1.210
|
$1.250
|
$2.000
|
$1.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
7,644.000
|
$21.000
|
$1.050
|
$1.090
|
$1.100
|
$1.060
|
$1.000
|
$2.540
|
$1.210
|
$1.250
|
$2.000
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
510.000
|
$2.000
|
$1.650
|
$1.090
|
$6.000
|
$1.630
|
$0.500
|
$2.030
|
$2.000
|
$1.000
|
$5.000
|
$1.000
|
|
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
4,213.000
|
$1.000
|
$2.100
|
$1.850
|
$2.200
|
$2.750
|
$2.000
|
$1.730
|
$2.420
|
$3.250
|
$2.000
|
$2.500
|
|
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
535.000
|
$1.000
|
$3.150
|
$1.850
|
$3.300
|
$3.400
|
$3.000
|
$1.730
|
$3.630
|
$3.250
|
$3.000
|
$3.500
|
|
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
1,391.000
|
$1.000
|
$2.100
|
$1.850
|
$2.200
|
$2.750
|
$2.000
|
$1.730
|
$2.420
|
$3.250
|
$3.000
|
$2.500
|
|
|
|
PAVEMENT SLER 6"
|
LF
|
420.000
|
$0.500
|
$2.100
|
$0.540
|
$2.200
|
$2.500
|
$2.000
|
$0.510
|
$2.420
|
$1.000
|
$1.000
|
$2.500
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
51.000
|
$8.000
|
$6.100
|
$8.720
|
$6.330
|
$5.200
|
$6.000
|
$8.150
|
$6.960
|
$19.000
|
$20.000
|
$6.650
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
4,630.000
|
$2.000
|
$1.050
|
$3.530
|
$1.100
|
$0.770
|
$1.000
|
$3.300
|
$1.210
|
$2.150
|
$2.000
|
$1.000
|
|
|
|
REMOVE AND REPLACE WOOD FENCE
|
LF
|
205.000
|
$45.000
|
$26.400
|
$30.800
|
$50.000
|
$40.000
|
$50.000
|
$60.960
|
$80.000
|
$60.500
|
$30.000
|
$85.000
|
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$5,500.000
|
$7,300.000
|
$14,131.000
|
$12,500.000
|
$5,146.690
|
$2,500.000
|
$10,160.600
|
$2,100.000
|
$14,050.000
|
$16,000.000
|
$40,100.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
365.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$115.000
|
$94.000
|
$0.000
|
$107.000
|
$0.000
|
$80.000
|
$70.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
104.000
|
$110.000
|
$0.000
|
$0.000
|
$0.000
|
$105.000
|
$111.000
|
$0.000
|
$131.000
|
$0.000
|
$95.000
|
$175.000
|
|
1
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
28.000
|
$130.000
|
$0.000
|
$0.000
|
$0.000
|
$135.000
|
$139.000
|
$0.000
|
$176.000
|
$0.000
|
$150.000
|
$230.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
365.000
|
$95.000
|
$50.000
|
$73.000
|
$30.800
|
$0.000
|
$0.000
|
$127.010
|
$0.000
|
$93.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
104.000
|
$110.000
|
$68.200
|
$74.000
|
$74.200
|
$0.000
|
$0.000
|
$132.090
|
$0.000
|
$149.500
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
28.000
|
$130.000
|
$93.600
|
$139.000
|
$95.200
|
$0.000
|
$0.000
|
$137.170
|
$0.000
|
$195.500
|
$0.000
|
$0.000
|
|
Totals: |
$4,107,699.100
|
$4,282,480.360
|
$4,331,880.280
|
$4,565,294.710
|
$4,580,640.424
|
$4,604,907.770
|
$4,895,501.005
|
$5,063,886.080
|
$5,284,594.000
|
$5,575,560.000
|
$5,996,900.000
|