PREPARING ROW
|
STA
|
12.600
|
$3,500.000
|
$2,800.000
|
$20,000.000
|
$8,000.000
|
$10,000.000
|
$2,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
78.000
|
$10.000
|
$100.000
|
$30.000
|
$100.000
|
$50.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,180.000
|
$32.000
|
$25.000
|
$45.000
|
$52.000
|
$50.000
|
$45.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,571.000
|
$0.250
|
$1.250
|
$0.800
|
$0.600
|
$2.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,571.000
|
$0.250
|
$1.250
|
$0.800
|
$0.600
|
$1.000
|
$2.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
7,142.000
|
$0.200
|
$1.250
|
$0.600
|
$0.450
|
$1.000
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
11.000
|
$35.000
|
$1.000
|
$100.000
|
$30.000
|
$1.000
|
$50.000
|
|
|
REWORK BS MTL (TY A) (6") (ORD COMP)
|
SY
|
4,439.000
|
$12.000
|
$10.000
|
$4.000
|
$23.500
|
$12.000
|
$20.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,032.000
|
$7.000
|
$25.000
|
$7.500
|
$15.000
|
$10.000
|
$8.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
2,322.000
|
$7.000
|
$25.000
|
$7.500
|
$15.000
|
$15.000
|
$8.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
37.000
|
$100.000
|
$700.000
|
$500.000
|
$250.000
|
$1,500.000
|
$280.220
|
|
|
CEM STABIL BKFL
|
CY
|
78.000
|
$200.000
|
$325.000
|
$350.000
|
$408.000
|
$250.000
|
$500.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,606.000
|
$32.000
|
$38.000
|
$30.000
|
$75.000
|
$80.000
|
$50.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
200.000
|
$130.000
|
$200.000
|
$130.000
|
$179.000
|
$165.000
|
$112.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
880.000
|
$275.000
|
$275.000
|
$430.000
|
$332.000
|
$295.000
|
$345.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
57.000
|
$1,500.000
|
$2,000.000
|
$1,800.000
|
$2,200.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
41.200
|
$1,500.000
|
$2,200.000
|
$1,800.000
|
$2,200.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
30.600
|
$1,500.000
|
$2,500.000
|
$1,800.000
|
$2,400.000
|
$2,200.000
|
$2,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
10,120.000
|
$25.000
|
$28.500
|
$50.000
|
$45.000
|
$35.000
|
$40.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
73.800
|
$800.000
|
$1,000.000
|
$1,000.000
|
$1,125.000
|
$850.000
|
$1,500.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,311.000
|
$200.000
|
$275.000
|
$300.000
|
$240.000
|
$350.000
|
$290.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
484.000
|
$8.000
|
$35.500
|
$22.000
|
$18.000
|
$10.000
|
$35.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
2,006.000
|
$240.000
|
$150.000
|
$190.000
|
$288.000
|
$200.000
|
$280.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$525.000
|
$700.050
|
$600.000
|
$700.000
|
$800.000
|
$700.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
492.000
|
$140.000
|
$200.000
|
$170.000
|
$260.000
|
$160.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$120.000
|
$250.000
|
$220.000
|
$260.000
|
$200.000
|
$300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$135,000.000
|
$200,000.000
|
$300,000.000
|
$205,000.000
|
$200,000.000
|
$250,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$185,000.000
|
$350,000.000
|
$400,000.000
|
$435,000.000
|
$400,000.000
|
$487,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$7,500.000
|
$4,000.000
|
$2,000.000
|
$3,500.000
|
$32,500.000
|
$49,950.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
60.000
|
$45.000
|
$50.000
|
$100.000
|
$60.000
|
$1.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$10.000
|
$20.000
|
$8.000
|
$10.000
|
$1.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
536.000
|
$30.000
|
$13.250
|
$55.000
|
$20.000
|
$1.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
536.000
|
$10.000
|
$1.000
|
$8.000
|
$5.000
|
$1.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,022.000
|
$3.000
|
$4.250
|
$4.000
|
$3.000
|
$1.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,022.000
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
30.000
|
$60.000
|
$65.000
|
$18.000
|
$17.000
|
$20.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30.000
|
$10.000
|
$65.000
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$4,500.000
|
$7,000.000
|
$6,000.000
|
$6,025.000
|
$10,000.000
|
$21,000.000
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
1,715.000
|
$65.000
|
$48.000
|
$28.000
|
$38.000
|
$150.000
|
$40.000
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
1,035.000
|
$3.000
|
$25.000
|
$8.000
|
$19.000
|
$50.000
|
$10.000
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
1,715.000
|
$2.500
|
$25.000
|
$9.000
|
$18.000
|
$10.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
77.000
|
$80.000
|
$125.000
|
$60.000
|
$70.000
|
$80.000
|
$4.230
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,804.000
|
$0.250
|
$3.000
|
$3.000
|
$2.000
|
$10.000
|
$3.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
902.000
|
$0.250
|
$2.500
|
$3.000
|
$3.000
|
$10.000
|
$3.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
875.000
|
$30.000
|
$39.500
|
$30.000
|
$25.000
|
$28.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,750.000
|
$2,000.000
|
$1,870.000
|
$2,000.000
|
$2,350.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.000
|
$15.000
|
$2.500
|
$2.500
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$250.000
|
$500.000
|
$250.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$4,000.000
|
$3,500.000
|
$3,200.000
|
$3,400.000
|
$3,450.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$1,000.000
|
$350.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,400.000
|
$4,000.000
|
$2,500.000
|
$2,600.000
|
$3,000.000
|
$1,925.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$900.000
|
$2,500.000
|
$1,500.000
|
$1,011.000
|
$1,000.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$12,500.000
|
$10,000.000
|
$10,500.000
|
$12,000.000
|
$7,250.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$600.000
|
$1,500.000
|
$650.000
|
$500.000
|
$1,000.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$105.000
|
$1,000.000
|
$40.000
|
$500.000
|
$200.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$100.000
|
$40.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$35.000
|
$50.000
|
$26.000
|
$25.000
|
$30.000
|
$35.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
105.000
|
$4.500
|
$20.000
|
$6.000
|
$5.000
|
$40.000
|
$5.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
5,957.000
|
$0.200
|
$1.000
|
$0.400
|
$0.300
|
$0.750
|
$0.350
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
55.000
|
$0.200
|
$15.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
8,400.000
|
$0.200
|
$1.000
|
$0.400
|
$0.300
|
$0.750
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
14,204.000
|
$0.400
|
$1.250
|
$0.900
|
$0.800
|
$1.250
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,420.000
|
$0.400
|
$1.250
|
$0.950
|
$0.800
|
$1.500
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,550.000
|
$0.450
|
$1.250
|
$0.950
|
$0.800
|
$1.500
|
$0.850
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
24.000
|
$30.000
|
$40.000
|
$22.000
|
$20.000
|
$40.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
96.000
|
$3.000
|
$12.000
|
$9.000
|
$7.500
|
$20.000
|
$7.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
18,158.000
|
$0.500
|
$1.350
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
2,148.000
|
$180.000
|
$175.000
|
$175.000
|
$210.000
|
$200.000
|
$175.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
606.000
|
$170.000
|
$200.000
|
$195.000
|
$210.000
|
$200.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
505.000
|
$7.000
|
$17.000
|
$10.000
|
$10.000
|
$10.000
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$18,000.000
|
$20,200.000
|
$25,000.000
|
$15,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
28.000
|
$250.000
|
$300.000
|
$180.000
|
$250.000
|
$300.000
|
$950.000
|
|
Totals: |
$3,124,039.900
|
$3,716,743.800
|
$4,238,957.000
|
$4,447,774.900
|
$4,711,770.750
|
$4,897,979.000
|