|
|
PREPARING ROW
|
STA
|
51.000
|
$6,000.000
|
$5,765.000
|
$1,000.000
|
$15,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,374.000
|
$20.000
|
$20.000
|
$50.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,014.000
|
$40.000
|
$10.000
|
$50.000
|
$35.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
38.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$720.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
19.000
|
$1,000.000
|
$800.000
|
$700.000
|
$520.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
19.000
|
$1,000.000
|
$1,000.000
|
$700.000
|
$325.000
|
|
|
VEGETATIVE WATERING
|
MG
|
855.000
|
$150.000
|
$55.000
|
$35.000
|
$50.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
23,970.000
|
$50.000
|
$25.000
|
$60.000
|
$42.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,320.000
|
$7.000
|
$10.000
|
$7.000
|
$10.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
10,640.000
|
$11.000
|
$10.000
|
$5.500
|
$8.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
36,881.000
|
$5.000
|
$10.000
|
$5.500
|
$8.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
190.000
|
$300.000
|
$210.000
|
$300.000
|
$250.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
802.000
|
$200.000
|
$210.000
|
$200.000
|
$300.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
2,700.000
|
$45.000
|
$100.000
|
$75.000
|
$65.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$600.000
|
$650.000
|
$1,000.000
|
$845.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$367,000.000
|
$375,000.000
|
$425,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$20,000.000
|
$50,000.000
|
$25,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
656.000
|
$40.000
|
$65.000
|
$65.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
656.000
|
$15.000
|
$25.000
|
$16.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,040.000
|
$6.500
|
$6.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,040.000
|
$2.250
|
$4.000
|
$0.750
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,328.000
|
$6.000
|
$10.000
|
$6.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,328.000
|
$2.000
|
$5.000
|
$0.600
|
$3.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT(SURF TREAT)
|
SY
|
2,486.000
|
$60.000
|
$50.000
|
$50.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
205.000
|
$35.000
|
$35.000
|
$65.000
|
$45.500
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
70.000
|
$80.000
|
$75.000
|
$140.000
|
$100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,700.000
|
$3,400.000
|
$5,000.000
|
$4,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$450.000
|
$320.000
|
$400.000
|
$520.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$800.000
|
$650.000
|
$800.000
|
$1,100.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
40.000
|
$25.000
|
$35.500
|
$25.000
|
$26.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
50.000
|
$3.000
|
$4.000
|
$6.000
|
$6.500
|
|
|
GROUND BOX TY BATTERY (162915)W/APRON
|
EA
|
2.000
|
$3,500.000
|
$4,100.000
|
$8,000.000
|
$8,500.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$300.000
|
$1,500.000
|
$600.000
|
$650.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
45.000
|
$50.000
|
$30.000
|
$36.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$875.000
|
$650.000
|
$750.000
|
$855.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$900.000
|
$800.000
|
$925.000
|
$1,120.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$750.000
|
$1,000.000
|
$1,000.000
|
$1,320.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,575.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$215.000
|
$75.000
|
$100.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$60.000
|
$35.000
|
$30.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
2,300.000
|
$1.250
|
$2.200
|
$1.750
|
$2.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,300.000
|
$2.400
|
$2.000
|
$1.250
|
$4.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
50,550.000
|
$1.250
|
$0.720
|
$1.250
|
$0.940
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
3,380.000
|
$1.250
|
$0.720
|
$1.250
|
$0.940
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
34,290.000
|
$1.250
|
$0.720
|
$1.250
|
$0.940
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
131.000
|
$20.000
|
$18.000
|
$18.000
|
$23.400
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$300.000
|
$500.000
|
$300.000
|
$650.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
603.000
|
$10.000
|
$4.000
|
$6.000
|
$5.200
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,300.000
|
$0.750
|
$0.600
|
$2.250
|
$1.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$13,000.000
|
$21,000.000
|
$20,000.000
|
$23,000.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$900.000
|
$4,600.000
|
$2,000.000
|
$2,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$18,500.000
|
$16,000.000
|
$18,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$20.000
|
$10.000
|
$18.000
|
$13.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
2,670.000
|
$5.000
|
$6.000
|
$8.000
|
$7.800
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$300.000
|
$590.000
|
$400.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
18.000
|
$600.000
|
$590.000
|
$600.000
|
$750.000
|
|
|
LEAD LED CHEVRON
|
EA
|
2.000
|
$5,100.000
|
$3,500.000
|
$5,000.000
|
$6,000.000
|
|
|
LED CHEVRON
|
EA
|
9.000
|
$3,200.000
|
$2,500.000
|
$3,000.000
|
$5,100.000
|
|
Totals: |
$3,902,364.000
|
$3,763,383.400
|
$4,283,512.300
|
$4,495,673.300
|