|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
510.000
|
$8.870
|
$15.000
|
$21.000
|
$9.250
|
|
|
BACKFILL (TY A OR B)
|
STA
|
251.610
|
$191.450
|
$160.000
|
$77.000
|
$162.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
9.000
|
$150.000
|
$100.000
|
$250.000
|
$670.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,000.000
|
$21.330
|
$17.000
|
$46.000
|
$20.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
107,730.000
|
$1.440
|
$2.500
|
$1.900
|
$1.900
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
98.000
|
$432.670
|
$800.000
|
$455.000
|
$907.000
|
|
|
RAIL (TY T631)
|
LF
|
350.000
|
$75.060
|
$95.000
|
$71.140
|
$75.750
|
|
|
REMOVE STR (RAIL)
|
LF
|
387.500
|
$27.150
|
$45.000
|
$8.690
|
$107.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$154,000.000
|
$125,000.000
|
$145,000.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$5,281.660
|
$6,000.000
|
$19,000.000
|
$798.750
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
25,213.000
|
$0.200
|
$0.260
|
$0.370
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
20,015.000
|
$0.200
|
$0.300
|
$0.330
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,250.000
|
$19.410
|
$27.000
|
$22.350
|
$24.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,290.650
|
$1,500.000
|
$1,335.000
|
$1,422.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,500.000
|
$1,400.000
|
$1,126.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$1.610
|
$2.000
|
$1.940
|
$2.100
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$114.670
|
$300.000
|
$267.000
|
$285.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,418.890
|
$3,450.000
|
$3,054.000
|
$3,252.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$186.890
|
$300.000
|
$267.000
|
$285.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
36.000
|
$168.420
|
$250.000
|
$209.000
|
$223.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$220.170
|
$300.000
|
$244.000
|
$260.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$546.380
|
$700.000
|
$586.000
|
$624.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
38.000
|
$522.310
|
$500.000
|
$438.000
|
$467.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$510.300
|
$600.000
|
$552.000
|
$588.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$813.250
|
$900.000
|
$799.000
|
$851.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$773.750
|
$1,200.000
|
$1,076.000
|
$1,146.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$885.850
|
$1,100.000
|
$997.000
|
$1,062.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
58.000
|
$85.820
|
$60.000
|
$49.000
|
$52.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
20.000
|
$94.000
|
$75.000
|
$60.000
|
$64.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
31.000
|
$18.540
|
$35.000
|
$30.000
|
$32.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
960.000
|
$0.250
|
$0.150
|
$0.260
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
41,719.000
|
$0.210
|
$0.150
|
$0.260
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
960.000
|
$0.180
|
$0.220
|
$0.280
|
$0.480
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
41,719.000
|
$0.240
|
$0.220
|
$0.280
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
11,024.000
|
$0.420
|
$0.400
|
$0.550
|
$0.640
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
710.000
|
$1.840
|
$2.500
|
$3.000
|
$3.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
72.000
|
$62.000
|
$45.000
|
$55.000
|
$59.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
4.000
|
$112.000
|
$300.000
|
$221.000
|
$236.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
68.000
|
$52.980
|
$55.000
|
$55.000
|
$64.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,450.000
|
$0.250
|
$0.150
|
$0.260
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
31,326.000
|
$0.240
|
$0.150
|
$0.260
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,450.000
|
$0.240
|
$0.220
|
$0.280
|
$0.480
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
31,326.000
|
$0.240
|
$0.220
|
$0.280
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
188.000
|
$1.580
|
$2.500
|
$3.000
|
$3.460
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,746.000
|
$0.860
|
$0.700
|
$0.800
|
$1.040
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
567.000
|
$6.150
|
$5.000
|
$6.000
|
$6.400
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
50.000
|
$124.300
|
$110.000
|
$95.000
|
$106.500
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
44.000
|
$130.730
|
$125.000
|
$100.000
|
$111.830
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$365.000
|
$500.000
|
$336.000
|
$560.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
94.000
|
$5.200
|
$5.000
|
$6.000
|
$6.400
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
1,350.000
|
$0.610
|
$0.600
|
$0.550
|
$1.300
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,350.000
|
$0.140
|
$0.100
|
$0.120
|
$0.200
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,350.000
|
$0.510
|
$0.350
|
$0.490
|
$0.590
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
80.000
|
$0.440
|
$0.600
|
$0.490
|
$1.600
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,450.000
|
$0.400
|
$0.350
|
$0.490
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
46,535.000
|
$0.430
|
$0.350
|
$0.490
|
$0.530
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
50,298.000
|
$0.710
|
$0.500
|
$0.790
|
$0.750
|
|
REFL PAV MRKR TY I-C
|
EA
|
445.000
|
$3.520
|
$4.000
|
$4.000
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,352.000
|
$3.420
|
$4.000
|
$4.000
|
$4.250
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
9,016.430
|
$84.320
|
$120.000
|
$120.000
|
$131.500
|
|
|
TACK COAT
|
GAL
|
12,206.000
|
$3.350
|
$3.000
|
$2.100
|
$3.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$262.860
|
$400.000
|
$298.000
|
$320.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
121.000
|
$424.060
|
$50.000
|
$648.000
|
$9.000
|
|
Totals: |
$1,694,331.667
|
$2,089,681.980
|
$2,248,521.775
|
$2,274,795.685
|