|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
619.060
|
$1,000.000
|
$350.000
|
$525.000
|
$709.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
109.600
|
$110.000
|
$125.000
|
$205.000
|
$215.000
|
|
|
BLOCK SODDING
|
SY
|
102,667.000
|
$3.000
|
$1.300
|
$3.250
|
$3.000
|
|
|
FERTILIZER
|
AC
|
21.210
|
$550.000
|
$300.000
|
$900.000
|
$705.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,454.000
|
$25.000
|
$5.000
|
$25.000
|
$12.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
31,375.000
|
$75.000
|
$62.000
|
$64.000
|
$75.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
15,363.000
|
$1.200
|
$2.250
|
$1.600
|
$1.000
|
|
|
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
|
SY
|
2,107.000
|
$3.000
|
$2.250
|
$7.250
|
$3.350
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
11,484.000
|
$75.000
|
$85.000
|
$72.000
|
$79.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,500.000
|
$31.000
|
$33.000
|
$34.000
|
$45.000
|
|
|
CEM STABIL BKFL
|
CY
|
55.330
|
$42.000
|
$85.000
|
$65.000
|
$94.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
42.000
|
$300.000
|
$275.000
|
$100.000
|
$230.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
383.820
|
$425.000
|
$300.000
|
$500.000
|
$343.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
66.000
|
$65.000
|
$150.000
|
$80.000
|
$88.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
6.000
|
$3,000.000
|
$5,000.000
|
$6,800.000
|
$8,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,300.000
|
$2,200.000
|
$1,600.000
|
$1,850.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$2,000.000
|
$1,500.000
|
$950.000
|
$1,875.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,000.000
|
$1,500.000
|
$1,850.000
|
$2,570.000
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$800.000
|
$1,750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$465,109.050
|
$275,000.000
|
$300,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,000.000
|
$2,700.000
|
$1,600.000
|
$1,545.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
270.000
|
$25.000
|
$35.000
|
$26.800
|
$34.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
459.000
|
$30.000
|
$45.000
|
$31.300
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
729.000
|
$15.000
|
$12.000
|
$10.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,456.000
|
$5.000
|
$14.000
|
$5.500
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,456.000
|
$2.000
|
$5.000
|
$1.200
|
$0.550
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
66,100.000
|
$0.200
|
$0.230
|
$0.320
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
32,640.000
|
$0.200
|
$0.270
|
$0.320
|
$0.220
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,618.000
|
$25.000
|
$20.000
|
$20.500
|
$18.990
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
152.000
|
$30.000
|
$37.000
|
$37.000
|
$25.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
52.000
|
$75.000
|
$60.000
|
$61.000
|
$57.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$2,500.000
|
$2,600.000
|
$2,800.000
|
$2,650.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
16.000
|
$200.000
|
$290.000
|
$140.000
|
$126.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$250.000
|
$400.000
|
$170.000
|
$150.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$350.000
|
$700.000
|
$520.000
|
$460.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
40.000
|
$450.000
|
$460.000
|
$400.000
|
$359.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$525.000
|
$530.000
|
$590.000
|
$520.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$73.000
|
$50.000
|
$55.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
34.000
|
$60.000
|
$90.000
|
$61.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
80.000
|
$40.000
|
$25.000
|
$21.000
|
$19.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
83,417.000
|
$0.200
|
$0.200
|
$0.300
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
6,200.000
|
$0.450
|
$0.300
|
$0.600
|
$0.290
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
275.000
|
$3.000
|
$1.850
|
$2.750
|
$1.820
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
21.000
|
$55.000
|
$40.000
|
$56.000
|
$39.260
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
25.000
|
$45.000
|
$40.000
|
$84.000
|
$39.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
38,444.000
|
$0.200
|
$0.210
|
$0.300
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
7,195.000
|
$0.200
|
$0.250
|
$0.300
|
$0.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,820.000
|
$2.000
|
$0.570
|
$1.400
|
$0.570
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
275.000
|
$5.000
|
$4.500
|
$7.250
|
$4.380
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
14.000
|
$120.000
|
$110.000
|
$140.000
|
$102.820
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$125.000
|
$110.000
|
$155.000
|
$105.320
|
|
|
PAVEMENT SEALER 6"
|
LF
|
129,056.000
|
$0.070
|
$0.060
|
$0.250
|
$0.060
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,200.000
|
$0.150
|
$0.090
|
$0.300
|
$0.090
|
|
|
PAVEMENT SEALER 24"
|
LF
|
275.000
|
$1.000
|
$1.500
|
$1.600
|
$1.330
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
21.000
|
$23.000
|
$15.000
|
$34.000
|
$14.030
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
25.000
|
$32.000
|
$20.000
|
$34.000
|
$19.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
76,664.000
|
$0.500
|
$0.360
|
$0.550
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,063.000
|
$0.400
|
$0.360
|
$0.550
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
30,552.000
|
$0.400
|
$0.420
|
$0.550
|
$0.420
|
|
REFL PAV MRKR TY I-C
|
EA
|
195.000
|
$3.000
|
$3.000
|
$5.600
|
$2.980
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,424.000
|
$3.000
|
$3.600
|
$5.600
|
$3.560
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
114,279.000
|
$0.030
|
$0.050
|
$0.450
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,820.000
|
$0.050
|
$0.050
|
$0.700
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
275.000
|
$0.300
|
$1.100
|
$1.250
|
$1.010
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
14.000
|
$15.000
|
$20.000
|
$11.250
|
$18.930
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
16.000
|
$15.000
|
$20.000
|
$11.250
|
$18.930
|
|
|
TMA (STATIONARY)
|
DAY
|
24.000
|
$250.000
|
$550.000
|
$304.000
|
$480.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
126.000
|
$450.000
|
$250.000
|
$340.000
|
$700.000
|
|
Totals: |
$5,457,735.500
|
$4,321,824.760
|
$4,800,246.400
|
$5,167,510.280
|