PREPARING ROW
|
STA
|
26.000
|
$100.000
|
$540.000
|
$800.000
|
$1,125.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
5,400.000
|
$5.000
|
$1.700
|
$7.000
|
$6.200
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
32.100
|
$600.000
|
$460.000
|
$1,200.000
|
$525.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,756.000
|
$10.000
|
$15.000
|
$20.000
|
$21.400
|
|
|
BACKFILL (TY A OR B)
|
STA
|
406.200
|
$175.000
|
$72.000
|
$200.000
|
$340.000
|
|
|
BLOCK SODDING
|
SY
|
8,500.000
|
$7.000
|
$3.950
|
$2.500
|
$3.750
|
|
|
FERTILIZER
|
AC
|
1.800
|
$550.000
|
$1,250.000
|
$600.000
|
$1,350.000
|
|
|
VEGETATIVE WATERING
|
MG
|
240.000
|
$15.000
|
$19.000
|
$25.000
|
$20.500
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
1,934.000
|
$75.000
|
$69.000
|
$100.000
|
$88.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
16,198.000
|
$1.000
|
$2.500
|
$3.500
|
$2.250
|
|
|
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
|
SY
|
5,979.000
|
$2.500
|
$1.100
|
$3.500
|
$5.650
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
16,534.000
|
$76.000
|
$80.500
|
$81.000
|
$79.800
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,675.000
|
$20.000
|
$46.500
|
$26.000
|
$35.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
255.000
|
$425.000
|
$682.000
|
$700.000
|
$490.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
22.000
|
$1,300.000
|
$416.000
|
$2,000.000
|
$920.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$114,945.760
|
$210,000.000
|
$65,000.000
|
$245,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$2,300.000
|
$2,500.000
|
$2,050.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
83,090.000
|
$0.250
|
$0.170
|
$0.220
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
30,132.000
|
$0.330
|
$0.400
|
$0.300
|
$0.260
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,439.000
|
$25.000
|
$18.910
|
$21.000
|
$20.400
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,100.000
|
$1,570.000
|
$1,800.000
|
$1,695.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
260.000
|
$60.000
|
$61.100
|
$70.000
|
$66.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,699.000
|
$3.000
|
$1.500
|
$1.250
|
$1.600
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$300.000
|
$280.000
|
$250.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$2,500.000
|
$2,650.000
|
$2,850.000
|
$2,860.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$300.000
|
$280.000
|
$280.000
|
$300.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
21.000
|
$260.000
|
$265.000
|
$200.000
|
$285.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$300.000
|
$290.000
|
$230.000
|
$315.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$570.000
|
$575.000
|
$400.000
|
$620.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
34.000
|
$25.000
|
$15.000
|
$22.000
|
$16.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
37.000
|
$450.000
|
$445.000
|
$390.000
|
$480.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
26.000
|
$480.000
|
$465.000
|
$520.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$570.000
|
$510.000
|
$540.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$650.000
|
$585.000
|
$640.000
|
$630.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
89.000
|
$100.000
|
$53.000
|
$50.000
|
$57.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
65.000
|
$60.000
|
$70.000
|
$60.000
|
$76.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
150.000
|
$40.000
|
$25.000
|
$25.000
|
$27.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
84,800.000
|
$0.200
|
$0.200
|
$0.200
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
5,500.000
|
$0.450
|
$0.250
|
$0.400
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,500.000
|
$2.500
|
$1.000
|
$1.000
|
$2.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
30.000
|
$86.000
|
$40.000
|
$35.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
30.000
|
$86.000
|
$40.000
|
$35.000
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
18,500.000
|
$0.250
|
$0.200
|
$0.200
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
56,500.000
|
$0.200
|
$0.200
|
$0.200
|
$0.380
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,500.000
|
$1.200
|
$0.800
|
$0.800
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,500.000
|
$6.500
|
$6.900
|
$5.000
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$150.000
|
$145.000
|
$99.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
30.000
|
$150.000
|
$145.000
|
$99.000
|
$155.000
|
|
REFL PAV MRK TY II (W) (RR XING)
|
EA
|
1.000
|
$300.000
|
$125.000
|
$500.000
|
$375.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
84,800.000
|
$0.450
|
$0.520
|
$0.380
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
18,500.000
|
$0.430
|
$0.520
|
$0.380
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
56,500.000
|
$0.470
|
$0.520
|
$0.380
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
325.000
|
$3.600
|
$4.000
|
$5.000
|
$4.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,450.000
|
$3.600
|
$4.000
|
$5.000
|
$4.350
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
159,800.000
|
$0.050
|
$0.010
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,500.000
|
$0.200
|
$0.020
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,500.000
|
$1.000
|
$0.100
|
$0.060
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
30.000
|
$18.000
|
$5.000
|
$5.000
|
$3.250
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
30.000
|
$17.000
|
$5.000
|
$5.000
|
$5.400
|
|
|
TMA (STATIONARY)
|
DAY
|
43.000
|
$300.000
|
$470.000
|
$500.000
|
$245.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
344.000
|
$15.000
|
$88.000
|
$25.000
|
$55.000
|
|
Totals: |
$2,416,853.320
|
$2,581,583.890
|
$2,619,398.650
|
$2,794,866.720
|