DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
628.000
|
$278.710
|
$300.000
|
$278.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$63,412.300
|
$83,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$6,860.000
|
$3,000.000
|
$15,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,200.000
|
$2.340
|
$1.850
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,200.000
|
$0.640
|
$0.800
|
$2.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
122,200.000
|
$0.270
|
$0.150
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
59,900.000
|
$0.230
|
$0.200
|
$0.200
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
855.000
|
$8.410
|
$16.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,070.000
|
$12.420
|
$18.000
|
$15.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,845.000
|
$1.320
|
$1.550
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
250.000
|
$1.590
|
$1.700
|
$2.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
5,100.000
|
$1.970
|
$2.300
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$937.430
|
$850.000
|
$900.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
16.000
|
$940.060
|
$1,000.000
|
$1,000.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
4,530.000
|
$3.830
|
$3.000
|
$6.000
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
4,530.000
|
$3.890
|
$3.000
|
$6.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
|
EA
|
12.000
|
$3,632.140
|
$5,000.000
|
$4,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$610.840
|
$750.000
|
$650.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
130.000
|
$0.770
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
513.000
|
$5.630
|
$5.770
|
$11.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
9.000
|
$37.310
|
$50.000
|
$500.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
122,200.000
|
$0.210
|
$0.120
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
11,600.000
|
$0.180
|
$0.150
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
51,700.000
|
$0.230
|
$0.120
|
$0.150
|
|
|
PAVEMENT SEALER 4"
|
LF
|
250.000
|
$0.090
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
130.000
|
$0.270
|
$1.000
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
513.000
|
$1.910
|
$3.000
|
$10.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
9.000
|
$14.740
|
$33.000
|
$500.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
122,200.000
|
$0.360
|
$0.360
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
11,600.000
|
$0.430
|
$0.380
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
51,950.000
|
$0.280
|
$0.360
|
$0.400
|
|
REFL PAV MRKR TY I-C
|
EA
|
8.000
|
$3.070
|
$8.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,314.000
|
$2.790
|
$3.770
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
250.000
|
$0.040
|
$0.500
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
130.000
|
$0.140
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
513.000
|
$1.140
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
9.000
|
$9.600
|
$22.000
|
$300.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
12.000
|
$4,410.490
|
$1,300.000
|
$6,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
96.000
|
$221.140
|
$270.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
78.000
|
$219.580
|
$270.000
|
$285.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
8,545.000
|
$1.880
|
$1.900
|
$3.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)
|
EA
|
24.000
|
$3,142.750
|
$4,500.000
|
$5,000.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
23.000
|
$4,550.970
|
$6,000.000
|
$6,000.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
1.000
|
$5,584.370
|
$8,500.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
48.000
|
$181.620
|
$280.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$150.000
|
$565.000
|
$850.000
|
|
Totals: |
$921,017.480
|
$952,818.040
|
$1,285,707.000
|