|
|
PREPARING ROW
|
STA
|
63.000
|
$1,000.000
|
$400.000
|
$917.110
|
$2,729.000
|
$3,940.000
|
$1,000.000
|
$1,100.000
|
|
|
PREP ROW (TREE PRUNING)
|
EA
|
2.000
|
$1,000.000
|
$8,050.000
|
$2,172.450
|
$1,417.500
|
$4,610.000
|
$500.000
|
$110.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
45.000
|
$18.250
|
$1.000
|
$57.240
|
$16.000
|
$47.530
|
$50.000
|
$53.200
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
106.000
|
$18.000
|
$1.000
|
$24.300
|
$14.500
|
$47.300
|
$50.000
|
$22.580
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
863.000
|
$27.500
|
$1.000
|
$34.470
|
$18.000
|
$20.400
|
$50.000
|
$27.740
|
|
|
REMOVING CONC (CURB)
|
LF
|
154.000
|
$15.000
|
$1.000
|
$14.410
|
$7.500
|
$4.980
|
$50.000
|
$10.360
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
1,698.000
|
$6.000
|
$1.000
|
$12.280
|
$7.500
|
$5.800
|
$50.000
|
$14.100
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
13.000
|
$40.000
|
$1.000
|
$69.260
|
$24.000
|
$86.100
|
$50.000
|
$61.380
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
29.000
|
$25.000
|
$1.000
|
$31.050
|
$10.500
|
$15.100
|
$50.000
|
$27.520
|
|
|
REMOVING CONC (MOVABLE BARRIER)
|
LF
|
100.000
|
$25.000
|
$1.000
|
$84.860
|
$10.500
|
$50.600
|
$50.000
|
$44.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,840.000
|
$18.000
|
$9.000
|
$11.890
|
$8.500
|
$8.100
|
$50.000
|
$30.360
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
45.000
|
$40.000
|
$25.000
|
$65.770
|
$10.500
|
$18.700
|
$50.000
|
$88.670
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
47.000
|
$110.000
|
$18.000
|
$70.560
|
$24.000
|
$17.900
|
$50.000
|
$105.890
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
19,073.000
|
$12.000
|
$1.000
|
$5.950
|
$4.000
|
$3.300
|
$5.000
|
$3.600
|
|
|
BLOCK SODDING
|
SY
|
19,073.000
|
$7.500
|
$6.000
|
$6.940
|
$10.000
|
$7.100
|
$5.000
|
$6.600
|
|
|
VEGETATIVE WATERING
|
MG
|
309.000
|
$45.000
|
$80.000
|
$57.120
|
$71.000
|
$66.900
|
$5.000
|
$1.100
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
140.000
|
$20.000
|
$41.000
|
$66.680
|
$21.500
|
$44.500
|
$20.000
|
$13.200
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
28.000
|
$800.000
|
$1,959.000
|
$988.700
|
$693.500
|
$631.000
|
$500.000
|
$1,110.570
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
368.000
|
$150.000
|
$94.000
|
$104.640
|
$120.000
|
$114.000
|
$360.000
|
$115.500
|
|
|
ADJUSTING MANHOLES
|
EA
|
3.000
|
$2,000.000
|
$900.000
|
$2,357.150
|
$2,442.500
|
$2,500.000
|
$1,000.000
|
$1,330.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$239,556.600
|
$172,000.000
|
$281,751.550
|
$155,000.000
|
$196,000.000
|
$240,000.000
|
$263,461.140
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$4,500.000
|
$1,500.000
|
$11,874.050
|
$2,393.500
|
$6,270.000
|
$5,000.000
|
$2,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
41.000
|
$38.000
|
$34.000
|
$69.920
|
$141.500
|
$40.200
|
$50.000
|
$0.010
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
41.000
|
$11.000
|
$16.000
|
$63.210
|
$71.000
|
$18.800
|
$10.000
|
$0.010
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
562.000
|
$25.000
|
$39.000
|
$59.770
|
$66.500
|
$46.100
|
$50.000
|
$1.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
562.000
|
$12.750
|
$8.000
|
$28.810
|
$21.500
|
$9.700
|
$10.000
|
$0.010
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,822.000
|
$3.700
|
$2.000
|
$4.990
|
$5.500
|
$2.850
|
$10.000
|
$0.010
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,822.000
|
$0.600
|
$1.000
|
$1.140
|
$1.500
|
$1.250
|
$1.000
|
$0.010
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
200.000
|
$6.000
|
$9.000
|
$6.080
|
$10.000
|
$11.100
|
$10.000
|
$0.010
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,950.000
|
$10.000
|
$9.000
|
$5.530
|
$13.000
|
$10.300
|
$10.000
|
$0.010
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,150.000
|
$4.000
|
$2.000
|
$1.130
|
$2.000
|
$2.550
|
$1.000
|
$0.010
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$8.000
|
$6.000
|
$109.430
|
$21.500
|
$82.900
|
$100.000
|
$110.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
123.000
|
$90.000
|
$135.000
|
$191.100
|
$106.500
|
$130.000
|
$140.000
|
$165.000
|
|
|
CONC CURB (TY I)
|
LF
|
296.000
|
$17.500
|
$22.000
|
$29.840
|
$49.000
|
$36.400
|
$30.000
|
$67.750
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
448.000
|
$50.000
|
$40.000
|
$45.500
|
$55.000
|
$37.400
|
$45.000
|
$67.750
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,188.000
|
$125.000
|
$110.000
|
$104.680
|
$106.500
|
$107.000
|
$120.000
|
$146.060
|
|
|
CONC SIDEWALKS (4")
|
SY
|
9,119.000
|
$70.000
|
$96.000
|
$63.530
|
$81.500
|
$94.500
|
$80.000
|
$133.600
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$3,500.000
|
$3,100.000
|
$3,036.270
|
$2,500.000
|
$2,030.000
|
$2,000.000
|
$2,363.450
|
|
|
CURB RAMPS (TY 10)
|
EA
|
10.000
|
$3,500.000
|
$3,500.000
|
$2,833.840
|
$2,500.000
|
$2,050.000
|
$2,000.000
|
$2,363.450
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,500.000
|
$3,500.000
|
$3,009.090
|
$2,500.000
|
$2,900.000
|
$3,000.000
|
$2,363.450
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$325.000
|
$325.000
|
$474.010
|
$482.000
|
$372.000
|
$400.000
|
$357.500
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
6.000
|
$450.000
|
$865.000
|
$970.920
|
$701.500
|
$991.000
|
$600.000
|
$951.500
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
20.000
|
$350.000
|
$350.000
|
$390.830
|
$390.000
|
$401.000
|
$300.000
|
$385.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
395.000
|
$22.970
|
$28.000
|
$49.790
|
$42.500
|
$34.400
|
$20.000
|
$33.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
110.000
|
$41.410
|
$27.000
|
$62.660
|
$92.000
|
$74.400
|
$40.000
|
$71.500
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
220.000
|
$35.890
|
$39.000
|
$62.130
|
$49.500
|
$40.100
|
$50.000
|
$38.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
420.000
|
$2.160
|
$3.000
|
$3.140
|
$2.000
|
$1.700
|
$3.000
|
$1.650
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,290.000
|
$2.230
|
$3.000
|
$3.060
|
$2.500
|
$1.900
|
$4.000
|
$1.820
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,070.000
|
$2.350
|
$3.000
|
$3.740
|
$4.000
|
$3.150
|
$5.000
|
$3.030
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
200.000
|
$5.000
|
$5.000
|
$8.830
|
$5.500
|
$4.350
|
$6.000
|
$4.180
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
200.000
|
$4.260
|
$5.000
|
$8.830
|
$6.000
|
$4.690
|
$8.000
|
$4.510
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$589.800
|
$485.000
|
$886.510
|
$793.500
|
$641.000
|
$8,000.000
|
$616.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$9,256.000
|
$11,970.000
|
$12,029.510
|
$10,204.500
|
$8,250.000
|
$8,000.000
|
$7,920.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
36.000
|
$32.150
|
$44.000
|
$57.140
|
$36.000
|
$48.050
|
$50.000
|
$71.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$850.000
|
$835.000
|
$927.460
|
$942.500
|
$956.000
|
$800.000
|
$495.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
22.000
|
$650.000
|
$650.000
|
$720.300
|
$786.500
|
$744.000
|
$800.000
|
$495.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$800.000
|
$895.000
|
$1,020.120
|
$857.500
|
$1,030.000
|
$800.000
|
$495.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$125.000
|
$115.000
|
$184.760
|
$163.000
|
$132.000
|
$200.000
|
$495.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
582.000
|
$12.000
|
$5.000
|
$20.000
|
$14.500
|
$11.800
|
$12.000
|
$5.890
|
|
|
PAVEMENT SEALER 24"
|
LF
|
582.000
|
$4.000
|
$2.000
|
$10.100
|
$5.500
|
$4.400
|
$4.000
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
410.000
|
$4.000
|
$2.000
|
$9.080
|
$5.000
|
$3.900
|
$8.000
|
$1.940
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
582.000
|
$2.000
|
$1.000
|
$5.700
|
$2.000
|
$1.450
|
$5.000
|
$0.720
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$269.650
|
$386.000
|
$482.710
|
$347.000
|
$281.000
|
$500.000
|
$269.500
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
6.000
|
$675.820
|
$854.000
|
$1,174.420
|
$850.500
|
$687.000
|
$1,000.000
|
$660.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
12.000
|
$109.310
|
$182.000
|
$174.710
|
$177.000
|
$143.000
|
$100.000
|
$137.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
3,090.000
|
$2.430
|
$3.000
|
$3.340
|
$3.500
|
$2.700
|
$3.000
|
$2.590
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
1,495.000
|
$1.980
|
$2.000
|
$2.280
|
$2.500
|
$2.000
|
$4.000
|
$1.930
|
|
|
PED POLE ASSEMBLY
|
EA
|
6.000
|
$2,451.980
|
$2,311.000
|
$4,859.420
|
$3,543.000
|
$2,860.000
|
$3,000.000
|
$2,750.000
|
|
|
REMOVE PED POLE ASSEMBLY
|
EA
|
1.000
|
$927.230
|
$643.000
|
$309.010
|
$560.000
|
$452.000
|
$1,000.000
|
$434.500
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
6.000
|
$1,426.010
|
$1,087.000
|
$1,251.420
|
$1,204.500
|
$973.000
|
$1,400.000
|
$935.000
|
|
|
REMOVAL OF CABLES
|
LF
|
3,485.000
|
$2.000
|
$1.000
|
$1.460
|
$1.500
|
$1.140
|
$3.000
|
$1.100
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
6.000
|
$121.820
|
$215.000
|
$87.620
|
$85.000
|
$68.700
|
$100.000
|
$275.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
9.000
|
$122.340
|
$143.000
|
$81.150
|
$49.500
|
$40.100
|
$100.000
|
$38.500
|
|
|
REPLACE OF LUMINAIRE HEAD
|
EA
|
2.000
|
$433.300
|
$1,154.000
|
$993.260
|
$1,197.500
|
$968.000
|
$800.000
|
$929.500
|
|
|
REMOVE VID IMAGE VEH DET SYS (VIVDS)
|
EA
|
2.000
|
$428.470
|
$268.000
|
$195.760
|
$793.500
|
$641.000
|
$800.000
|
$616.000
|
|
|
REMOV PED SIG LED TRAF SIG LAMP UNIT
|
EA
|
9.000
|
$420.000
|
$215.000
|
$81.150
|
$517.500
|
$418.000
|
$500.000
|
$401.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,250.000
|
$2,000.000
|
$2,744.650
|
$8,503.500
|
$3,440.000
|
$5,000.000
|
$1.100
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$1,750.000
|
$860.000
|
$3,067.540
|
$35.500
|
$1,810.000
|
$2,500.000
|
$1.100
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
6.000
|
$1,200.000
|
$1,000.000
|
$4,436.510
|
$1,700.500
|
$573.000
|
$3,500.000
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$200.000
|
$72.000
|
$380.700
|
$103.500
|
$158.000
|
$300.000
|
$1.100
|
|
|
CONDUIT (PREPARE)
|
LF
|
440.000
|
$5.090
|
$2.000
|
$2.960
|
$3.000
|
$2.300
|
$4.000
|
$2.200
|
|
|
GROUND BOX (PREPARE)
|
EA
|
6.000
|
$619.030
|
$270.000
|
$228.420
|
$354.500
|
$286.000
|
$600.000
|
$275.000
|
|
|
GROUND BOX (ADJUST)
|
EA
|
2.000
|
$460.000
|
$450.000
|
$1,004.260
|
$1,594.500
|
$1,290.000
|
$600.000
|
$1,237.500
|
|
|
TMA (STATIONARY)
|
DAY
|
141.000
|
$200.000
|
$250.000
|
$223.230
|
$343.000
|
$150.000
|
$300.000
|
$1.100
|
|
Totals: |
$2,330,443.310
|
$2,106,851.000
|
$2,326,525.880
|
$2,351,743.500
|
$2,460,212.470
|
$2,541,704.000
|
$2,696,332.320
|