REMOVING CONC (DRIVEWAYS)
|
SY
|
418.000
|
$30.000
|
$30.000
|
$14.500
|
$23.440
|
$45.000
|
$44.320
|
$19.000
|
$19.990
|
$68.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
100,000.000
|
$10.000
|
$7.000
|
$12.000
|
$11.650
|
$8.000
|
$10.950
|
$9.000
|
$8.930
|
$19.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
4,380.000
|
$15.000
|
$9.000
|
$18.500
|
$13.980
|
$15.000
|
$20.750
|
$10.000
|
$13.990
|
$22.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
274,927.780
|
$4.000
|
$4.600
|
$9.650
|
$10.090
|
$4.200
|
$7.100
|
$3.350
|
$8.960
|
$11.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,982.500
|
$150.000
|
$330.000
|
$140.000
|
$191.000
|
$200.000
|
$119.380
|
$133.000
|
$170.120
|
$48.000
|
|
|
BLADING
|
STA
|
1,982.500
|
$150.000
|
$330.000
|
$50.500
|
$80.940
|
$95.000
|
$59.910
|
$19.000
|
$53.860
|
$66.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
285.260
|
$500.000
|
$330.000
|
$320.000
|
$394.490
|
$320.000
|
$329.400
|
$350.000
|
$346.890
|
$420.000
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$100.000
|
$100.000
|
$155.000
|
$101.740
|
$95.000
|
$132.940
|
$175.000
|
$199.210
|
$103.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
54,985.550
|
$4.000
|
$3.300
|
$3.900
|
$3.590
|
$3.700
|
$7.390
|
$4.350
|
$4.150
|
$5.500
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
179,481.040
|
$4.000
|
$2.400
|
$3.050
|
$3.370
|
$2.500
|
$3.110
|
$4.000
|
$3.260
|
$3.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
71,869.500
|
$4.000
|
$2.400
|
$3.300
|
$3.330
|
$3.500
|
$3.200
|
$3.500
|
$3.030
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
11,244.800
|
$4.000
|
$2.600
|
$3.300
|
$3.240
|
$3.500
|
$3.150
|
$2.900
|
$3.400
|
$3.500
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
254.980
|
$150.000
|
$120.000
|
$205.000
|
$433.280
|
$160.000
|
$223.280
|
$175.000
|
$300.800
|
$193.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
109,106.830
|
$130.000
|
$109.000
|
$122.000
|
$129.450
|
$129.000
|
$129.500
|
$121.000
|
$125.240
|
$110.000
|
|
|
TACK COAT
|
GAL
|
1,351.930
|
$4.000
|
$2.600
|
$2.650
|
$2.820
|
$3.000
|
$73.480
|
$2.950
|
$3.010
|
$40.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
28,636.120
|
$40.000
|
$33.000
|
$49.500
|
$44.530
|
$56.000
|
$56.170
|
$53.000
|
$58.670
|
$59.000
|
|
|
CEM STABIL BKFL
|
CY
|
150.600
|
$400.000
|
$185.000
|
$265.000
|
$214.150
|
$260.000
|
$270.000
|
$133.000
|
$300.740
|
$232.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
136.000
|
$100.000
|
$300.000
|
$58.000
|
$491.160
|
$58.000
|
$580.630
|
$280.000
|
$414.970
|
$393.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
75.000
|
$20.000
|
$100.000
|
$26.500
|
$429.880
|
$27.000
|
$27.000
|
$1.000
|
$30.070
|
$150.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
688.000
|
$60.000
|
$25.000
|
$58.000
|
$18.080
|
$58.000
|
$59.400
|
$23.000
|
$66.160
|
$10.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
10.000
|
$500.000
|
$225.000
|
$210.000
|
$357.370
|
$220.000
|
$216.000
|
$165.000
|
$240.590
|
$350.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
34.350
|
$500.000
|
$1,200.000
|
$605.000
|
$820.930
|
$600.000
|
$621.000
|
$560.000
|
$779.160
|
$760.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
16.400
|
$600.000
|
$1,200.000
|
$605.000
|
$1,014.480
|
$600.000
|
$621.000
|
$560.000
|
$761.690
|
$650.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
4.000
|
$200.000
|
$300.000
|
$79.000
|
$1,283.660
|
$79.000
|
$81.000
|
$790.000
|
$90.220
|
$630.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
94.000
|
$250.000
|
$215.000
|
$89.500
|
$274.760
|
$90.000
|
$91.800
|
$162.000
|
$102.250
|
$320.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
22.000
|
$300.000
|
$195.000
|
$105.000
|
$414.140
|
$110.000
|
$108.000
|
$315.000
|
$120.300
|
$400.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
48.000
|
$350.000
|
$142.000
|
$140.000
|
$375.190
|
$140.000
|
$145.800
|
$125.000
|
$162.400
|
$285.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
9.000
|
$200.000
|
$258.000
|
$100.000
|
$573.480
|
$100.000
|
$102.600
|
$365.000
|
$114.280
|
$330.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
9.000
|
$250.000
|
$313.000
|
$120.000
|
$458.370
|
$120.000
|
$124.200
|
$370.000
|
$138.340
|
$353.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
225.000
|
$500.000
|
$734.000
|
$685.000
|
$447.420
|
$690.000
|
$702.000
|
$465.000
|
$781.920
|
$633.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$1,000.000
|
$930.000
|
$685.000
|
$1,428.510
|
$690.000
|
$702.000
|
$950.000
|
$781.920
|
$1,350.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
200.000
|
$250.000
|
$142.000
|
$145.000
|
$112.950
|
$150.000
|
$151.200
|
$155.000
|
$168.410
|
$166.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
32.000
|
$300.000
|
$158.000
|
$190.000
|
$150.120
|
$190.000
|
$194.400
|
$178.000
|
$216.530
|
$187.000
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
1.000
|
$5,000.000
|
$1,020.000
|
$2,100.000
|
$1,221.300
|
$2,200.000
|
$2,160.000
|
$1,895.000
|
$2,405.920
|
$1,670.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$4,000.000
|
$17,500.000
|
$10,000.000
|
$16,025.760
|
$10,000.000
|
$10,260.000
|
$18,170.000
|
$11,428.120
|
$15,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$5,000.000
|
$9,750.000
|
$7,400.000
|
$9,897.790
|
$8,000.000
|
$7,560.000
|
$8,040.000
|
$8,420.720
|
$8,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,375.000
|
$1,100.000
|
$3,247.100
|
$1,100.000
|
$1,080.000
|
$1,720.000
|
$1,202.960
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$2,000.000
|
$1,540.000
|
$1,300.000
|
$2,416.330
|
$1,300.000
|
$1,350.000
|
$2,440.000
|
$1,503.700
|
$2,600.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
17.000
|
$2,000.000
|
$1,860.000
|
$2,600.000
|
$3,664.300
|
$2,700.000
|
$2,700.000
|
$1,665.000
|
$3,007.400
|
$3,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$2,250.000
|
$3,400.000
|
$4,824.320
|
$3,400.000
|
$3,456.000
|
$4,390.000
|
$3,849.470
|
$3,400.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$3,500.000
|
$3,400.000
|
$5,422.070
|
$3,400.000
|
$3,456.000
|
$2,595.000
|
$3,849.470
|
$4,600.000
|
|
|
SET (TY II) (48 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$4,000.000
|
$7,000.000
|
$4,000.000
|
$4,934.990
|
$4,000.000
|
$4,104.000
|
$3,555.000
|
$4,571.250
|
$9,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,660.000
|
$2,600.000
|
$4,577.690
|
$2,700.000
|
$2,700.000
|
$3,170.000
|
$3,007.400
|
$2,800.000
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$2,480.000
|
$3,200.000
|
$2,984.590
|
$3,200.000
|
$3,240.000
|
$3,465.000
|
$3,608.880
|
$3,600.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
30.000
|
$2,000.000
|
$1,200.000
|
$2,100.000
|
$3,020.730
|
$2,200.000
|
$3,896.540
|
$2,790.000
|
$2,405.920
|
$3,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
5.000
|
$1,500.000
|
$1,040.000
|
$210.000
|
$1,407.210
|
$220.000
|
$6,078.820
|
$3,330.000
|
$240.590
|
$3,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,108,000.000
|
$4,000,000.000
|
$2,950,000.000
|
$4,120,095.790
|
$4,300,000.000
|
$2,012,094.380
|
$5,100,000.000
|
$4,719,211.850
|
$5,900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
37.000
|
$10,000.000
|
$5,000.000
|
$20,000.000
|
$10,645.890
|
$25,000.000
|
$10,000.000
|
$16,000.000
|
$30,000.000
|
$27,050.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,200.000
|
$30.000
|
$20.000
|
$24.000
|
$20.540
|
$15.000
|
$80.000
|
$25.000
|
$26.160
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,200.000
|
$10.000
|
$6.000
|
$10.500
|
$8.830
|
$3.000
|
$15.470
|
$10.000
|
$11.370
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
36,840.000
|
$3.000
|
$3.000
|
$1.600
|
$2.230
|
$2.300
|
$4.850
|
$2.890
|
$1.710
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
36,840.000
|
$1.000
|
$0.500
|
$0.530
|
$1.130
|
$0.500
|
$3.760
|
$0.500
|
$0.570
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
26,394.000
|
$5.000
|
$5.000
|
$5.550
|
$3.270
|
$4.300
|
$6.170
|
$4.750
|
$5.970
|
$6.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
7,266.000
|
$50.000
|
$30.000
|
$29.000
|
$57.990
|
$55.000
|
$33.370
|
$25.500
|
$42.440
|
$41.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
472.000
|
$120.000
|
$104.000
|
$110.000
|
$95.250
|
$110.000
|
$165.740
|
$86.000
|
$152.020
|
$120.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
22,638.000
|
$50.000
|
$45.000
|
$61.000
|
$49.040
|
$45.000
|
$58.350
|
$37.000
|
$88.190
|
$65.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,727.000
|
$50.000
|
$39.000
|
$52.000
|
$50.490
|
$50.000
|
$62.260
|
$64.000
|
$79.490
|
$59.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
415,140.000
|
$0.150
|
$0.080
|
$0.150
|
$0.150
|
$0.140
|
$0.130
|
$0.160
|
$0.170
|
$0.110
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
207,570.000
|
$0.150
|
$0.080
|
$0.210
|
$0.170
|
$0.140
|
$0.180
|
$0.220
|
$0.170
|
$0.110
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
42.000
|
$250.000
|
$275.000
|
$265.000
|
$440.330
|
$260.000
|
$270.000
|
$250.000
|
$284.340
|
$260.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
11.000
|
$300.000
|
$310.000
|
$295.000
|
$521.010
|
$300.000
|
$302.400
|
$280.000
|
$318.460
|
$290.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
63.000
|
$400.000
|
$680.000
|
$655.000
|
$857.370
|
$650.000
|
$669.600
|
$620.000
|
$705.150
|
$630.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
118.000
|
$800.000
|
$580.000
|
$570.000
|
$608.650
|
$570.000
|
$583.200
|
$540.000
|
$614.170
|
$560.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
71.000
|
$850.000
|
$610.000
|
$610.000
|
$653.730
|
$610.000
|
$626.400
|
$580.000
|
$659.660
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
14.000
|
$900.000
|
$980.000
|
$970.000
|
$1,036.960
|
$970.000
|
$993.600
|
$920.000
|
$1,046.360
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$900.000
|
$890.000
|
$885.000
|
$946.780
|
$880.000
|
$907.200
|
$840.000
|
$955.370
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
3.000
|
$1,200.000
|
$1,160.000
|
$1,200.000
|
$1,239.840
|
$1,200.000
|
$1,188.000
|
$1,100.000
|
$1,251.080
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
150.000
|
$90.000
|
$95.000
|
$95.000
|
$101.440
|
$95.000
|
$135.290
|
$90.000
|
$102.360
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
38.000
|
$80.000
|
$95.000
|
$95.000
|
$101.440
|
$95.000
|
$97.200
|
$90.000
|
$102.360
|
$95.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
62.000
|
$80.000
|
$95.000
|
$96.000
|
$102.570
|
$95.000
|
$98.280
|
$91.000
|
$103.500
|
$95.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
129.000
|
$30.000
|
$50.000
|
$47.500
|
$50.720
|
$48.000
|
$135.280
|
$45.000
|
$51.180
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,763,166.000
|
$0.200
|
$0.110
|
$0.110
|
$0.140
|
$0.130
|
$0.130
|
$0.120
|
$0.110
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
433,624.000
|
$0.300
|
$0.170
|
$0.160
|
$0.200
|
$0.190
|
$0.230
|
$0.180
|
$0.170
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
|
LF
|
575.000
|
$0.500
|
$0.220
|
$0.210
|
$0.270
|
$0.250
|
$0.590
|
$0.240
|
$0.230
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
13,030.000
|
$0.500
|
$0.220
|
$0.210
|
$0.270
|
$0.250
|
$0.260
|
$0.240
|
$0.230
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,336.000
|
$5.000
|
$2.500
|
$2.500
|
$1.690
|
$1.600
|
$2.160
|
$1.500
|
$2.710
|
$2.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,158.000
|
$0.200
|
$0.110
|
$0.110
|
$0.150
|
$0.140
|
$0.220
|
$0.130
|
$0.110
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
890,276.000
|
$0.200
|
$0.110
|
$0.110
|
$0.140
|
$0.130
|
$0.130
|
$0.120
|
$0.110
|
$0.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
34,557.000
|
$2.000
|
$0.800
|
$1.050
|
$0.970
|
$0.650
|
$3.110
|
$0.500
|
$2.270
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
24,758.000
|
$2.000
|
$1.000
|
$1.050
|
$0.990
|
$0.650
|
$3.120
|
$0.500
|
$2.270
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
575.000
|
$0.400
|
$1.100
|
$1.050
|
$0.920
|
$0.860
|
$0.920
|
$0.820
|
$1.140
|
$0.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
13,030.000
|
$0.800
|
$1.100
|
$1.050
|
$0.920
|
$0.860
|
$0.720
|
$0.820
|
$1.140
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
410,840.000
|
$0.400
|
$0.350
|
$0.350
|
$0.460
|
$0.430
|
$0.350
|
$0.410
|
$0.380
|
$0.350
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,161.000
|
$0.500
|
$0.700
|
$0.680
|
$0.610
|
$0.570
|
$0.510
|
$0.540
|
$0.740
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,158.000
|
$0.400
|
$0.450
|
$0.450
|
$0.460
|
$0.430
|
$0.380
|
$0.410
|
$0.490
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
328,940.000
|
$0.400
|
$0.350
|
$0.350
|
$0.460
|
$0.430
|
$0.350
|
$0.410
|
$0.380
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,365.000
|
$20.000
|
$20.000
|
$20.000
|
$19.720
|
$19.000
|
$14.040
|
$17.500
|
$21.610
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$250.000
|
$220.000
|
$215.000
|
$309.960
|
$290.000
|
$237.600
|
$275.000
|
$233.160
|
$230.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
22.000
|
$300.000
|
$500.000
|
$500.000
|
$760.810
|
$710.000
|
$432.000
|
$675.000
|
$540.240
|
$410.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
20.000
|
$300.000
|
$300.000
|
$290.000
|
$417.040
|
$390.000
|
$270.000
|
$370.000
|
$312.770
|
$260.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,803.000
|
$2.000
|
$3.300
|
$3.150
|
$3.380
|
$3.200
|
$3.240
|
$3.000
|
$3.410
|
$3.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,333.000
|
$2.000
|
$3.300
|
$3.150
|
$3.380
|
$3.200
|
$3.240
|
$3.000
|
$3.410
|
$3.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
534,600.000
|
$0.600
|
$0.090
|
$0.420
|
$0.490
|
$0.200
|
$0.810
|
$0.810
|
$0.910
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
469,150.000
|
$0.800
|
$0.090
|
$0.420
|
$0.480
|
$0.300
|
$0.870
|
$0.810
|
$0.910
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$1.000
|
$25.000
|
$3.150
|
$11.270
|
$0.500
|
$37.270
|
$5.000
|
$167.510
|
$5.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$10,000.000
|
$7,000.000
|
$4,700.000
|
$5,072.070
|
$7,000.000
|
$9,864.280
|
$866.000
|
$6,014.800
|
$50,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$60,000.000
|
$8,000.000
|
$10,500.000
|
$16,061.540
|
$8,600.000
|
$12,628.110
|
$14,220.000
|
$18,197.500
|
$5,600.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$45,000.000
|
$4,800.000
|
$10,500.000
|
$6,424.610
|
$7,400.000
|
$28,776.680
|
$9,090.000
|
$10,938.540
|
$5,500.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
790,305.560
|
$6.000
|
$5.850
|
$5.900
|
$6.200
|
$6.000
|
$6.320
|
$5.800
|
$6.650
|
$5.900
|
|
|
ASPH FOR REINF FAB (AC-20-5TR)
|
GAL
|
158,061.110
|
$5.000
|
$2.600
|
$2.750
|
$3.960
|
$3.600
|
$3.560
|
$3.120
|
$3.690
|
$3.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
122,747.160
|
$100.000
|
$85.000
|
$93.000
|
$88.320
|
$111.000
|
$114.000
|
$121.000
|
$97.620
|
$106.000
|
|
|
D-GR HMA TY-C SAC-B PG70-28
|
TON
|
27,297.390
|
$95.000
|
$98.000
|
$99.000
|
$99.660
|
$111.000
|
$115.620
|
$121.000
|
$101.000
|
$100.000
|
|
|
D-GR HMA TY-D PG70-28
|
TON
|
45,281.630
|
$95.000
|
$104.000
|
$100.000
|
$94.470
|
$114.000
|
$111.330
|
$123.000
|
$109.290
|
$107.000
|
|
|
TACK COAT
|
GAL
|
220,596.500
|
$4.000
|
$2.600
|
$2.650
|
$3.460
|
$3.000
|
$3.170
|
$2.500
|
$3.010
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$22,000.000
|
$13,000.000
|
$21,351.980
|
$20,000.000
|
$17,110.940
|
$15,000.000
|
$20,450.320
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,648.000
|
$150.000
|
$250.000
|
$160.000
|
$104.450
|
$100.000
|
$122.610
|
$91.000
|
$337.270
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
135.000
|
$250.000
|
$850.000
|
$735.000
|
$586.570
|
$100.000
|
$474.870
|
$578.000
|
$842.250
|
$600.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$15,000.000
|
$10,000.000
|
$9,500.000
|
$10,675.990
|
$15,000.000
|
$9,323.270
|
$5,090.000
|
$17,232.400
|
$15,000.000
|
|
Totals: |
$56,190,976.810
|
$48,813,789.559
|
$52,890,798.140
|
$54,799,377.718
|
$56,567,917.617
|
$57,345,200.708
|
$57,752,000.140
|
$59,076,291.464
|
$59,268,714.929
|