PREPARING ROW
|
STA
|
84.470
|
$1,000.000
|
$1,500.000
|
$400.000
|
$800.000
|
$1,600.000
|
$2,500.000
|
$2,000.000
|
$1,000.000
|
$940.000
|
$2,600.000
|
$500.000
|
$2,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
402.000
|
$10.000
|
$9.000
|
$7.800
|
$15.000
|
$10.900
|
$20.000
|
$10.000
|
$10.000
|
$8.000
|
$45.000
|
$45.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
317.000
|
$10.000
|
$9.000
|
$7.800
|
$15.000
|
$8.300
|
$20.000
|
$10.000
|
$10.000
|
$12.000
|
$50.000
|
$12.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
142.000
|
$5.000
|
$9.000
|
$4.650
|
$3.550
|
$3.000
|
$20.000
|
$10.000
|
$3.000
|
$16.000
|
$75.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
276.000
|
$10.000
|
$9.000
|
$7.800
|
$15.000
|
$10.900
|
$20.000
|
$10.000
|
$10.000
|
$16.000
|
$50.000
|
$12.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
228.000
|
$8.000
|
$9.000
|
$7.800
|
$13.330
|
$9.700
|
$20.000
|
$10.000
|
$10.000
|
$10.000
|
$70.000
|
$9.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,982.000
|
$10.000
|
$10.000
|
$16.000
|
$25.490
|
$20.000
|
$20.000
|
$28.000
|
$15.000
|
$26.000
|
$40.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
50.000
|
$15.000
|
$18.000
|
$140.000
|
$105.190
|
$24.800
|
$20.000
|
$43.000
|
$15.000
|
$31.000
|
$40.000
|
$25.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
941.000
|
$12.000
|
$19.000
|
$32.250
|
$53.490
|
$3.200
|
$20.000
|
$20.000
|
$5.000
|
$7.000
|
$40.000
|
$15.000
|
$30.000
|
|
|
EROSION CONTROL COMPOST
|
CY
|
10.000
|
$25.000
|
$35.000
|
$73.750
|
$30.300
|
$87.400
|
$20.000
|
$185.000
|
$150.000
|
$185.630
|
$80.000
|
$100.000
|
$100.000
|
|
|
BLOCK SODDING
|
SY
|
12,145.000
|
$3.000
|
$3.500
|
$5.700
|
$4.000
|
$4.100
|
$4.000
|
$4.000
|
$5.000
|
$5.500
|
$4.000
|
$7.500
|
$6.000
|
|
|
FERTILIZER
|
AC
|
2.500
|
$650.000
|
$1,650.000
|
$510.000
|
$1,500.000
|
$1,001.300
|
$700.000
|
$2,000.000
|
$1,500.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
$3,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
301.220
|
$15.000
|
$35.000
|
$1.000
|
$15.000
|
$25.800
|
$10.000
|
$20.000
|
$40.000
|
$16.000
|
$30.000
|
$65.000
|
$50.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
11,237.000
|
$6.500
|
$10.000
|
$24.000
|
$15.000
|
$17.200
|
$10.000
|
$21.000
|
$18.000
|
$20.000
|
$22.950
|
$10.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
30.000
|
$65.000
|
$60.000
|
$47.500
|
$48.000
|
$449.600
|
$100.000
|
$100.000
|
$45.000
|
$100.000
|
$130.000
|
$150.000
|
$350.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,330.000
|
$12.000
|
$30.000
|
$39.000
|
$53.000
|
$23.300
|
$24.000
|
$15.000
|
$10.000
|
$38.500
|
$50.000
|
$55.000
|
$55.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
400.000
|
$90.000
|
$140.000
|
$200.000
|
$265.000
|
$226.000
|
$95.000
|
$220.000
|
$280.000
|
$180.000
|
$210.000
|
$150.000
|
$150.000
|
|
|
CL B CONC (FLUME)
|
CY
|
18.000
|
$400.000
|
$410.000
|
$1,415.000
|
$800.000
|
$799.600
|
$500.000
|
$600.000
|
$900.000
|
$900.000
|
$700.000
|
$650.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
25.000
|
$900.000
|
$970.000
|
$1,950.000
|
$950.000
|
$2,467.600
|
$800.000
|
$1,900.000
|
$1,800.000
|
$1,100.000
|
$2,000.000
|
$650.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
12.000
|
$900.000
|
$1,000.000
|
$2,500.000
|
$1,000.000
|
$2,195.400
|
$900.000
|
$2,000.000
|
$3,500.000
|
$2,750.000
|
$2,000.000
|
$750.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
2,004.000
|
$13.000
|
$14.250
|
$25.000
|
$30.000
|
$33.600
|
$20.000
|
$39.500
|
$50.000
|
$40.000
|
$35.000
|
$28.000
|
$20.000
|
|
|
APPROACH SLAB
|
CY
|
10.000
|
$500.000
|
$605.000
|
$2,100.000
|
$800.000
|
$1,047.100
|
$500.000
|
$1,000.000
|
$750.000
|
$700.000
|
$1,100.000
|
$655.000
|
$1,500.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
1,851.000
|
$40.000
|
$35.000
|
$25.500
|
$70.000
|
$44.400
|
$30.000
|
$44.000
|
$30.000
|
$24.000
|
$25.000
|
$38.000
|
$55.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
3,200.000
|
$70.000
|
$45.000
|
$31.000
|
$45.000
|
$70.000
|
$95.000
|
$52.000
|
$90.000
|
$80.000
|
$55.000
|
$45.000
|
$65.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
249.500
|
$110.000
|
$195.000
|
$265.000
|
$240.000
|
$186.000
|
$220.000
|
$190.000
|
$260.000
|
$500.000
|
$240.000
|
$120.000
|
$85.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
150.000
|
$375.000
|
$325.000
|
$510.000
|
$460.000
|
$398.400
|
$420.000
|
$550.000
|
$500.000
|
$500.000
|
$550.000
|
$650.000
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
60.000
|
$415.000
|
$330.000
|
$750.000
|
$525.000
|
$399.600
|
$500.000
|
$600.000
|
$500.000
|
$550.000
|
$650.000
|
$750.000
|
$650.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
12.000
|
$420.000
|
$365.000
|
$210.000
|
$780.000
|
$512.500
|
$500.000
|
$600.000
|
$400.000
|
$1,100.000
|
$580.000
|
$650.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
4.300
|
$440.000
|
$420.000
|
$1,175.000
|
$780.000
|
$805.100
|
$500.000
|
$600.000
|
$800.000
|
$750.000
|
$600.000
|
$655.000
|
$550.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,838.400
|
$7.000
|
$9.000
|
$7.000
|
$19.000
|
$6.200
|
$5.000
|
$12.000
|
$1.000
|
$7.000
|
$10.000
|
$35.000
|
$10.000
|
|
|
RAIL (TY C1W)
|
LF
|
630.500
|
$260.000
|
$220.000
|
$160.000
|
$240.000
|
$243.900
|
$150.000
|
$190.000
|
$200.000
|
$175.000
|
$200.000
|
$235.000
|
$185.000
|
|
|
RAIL (TY PR11)
|
LF
|
973.000
|
$90.000
|
$140.000
|
$62.500
|
$70.000
|
$123.700
|
$75.000
|
$130.000
|
$100.000
|
$60.000
|
$80.000
|
$175.000
|
$150.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
32.000
|
$100.000
|
$105.000
|
$125.000
|
$110.000
|
$90.000
|
$100.000
|
$150.000
|
$300.000
|
$85.000
|
$80.000
|
$125.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
88.000
|
$60.000
|
$70.000
|
$110.000
|
$90.000
|
$112.600
|
$90.000
|
$120.000
|
$150.000
|
$70.000
|
$200.000
|
$72.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
65.000
|
$80.000
|
$85.000
|
$90.000
|
$120.000
|
$118.500
|
$95.000
|
$150.000
|
$150.000
|
$105.000
|
$210.000
|
$122.000
|
$125.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
76.000
|
$100.000
|
$190.000
|
$190.000
|
$240.000
|
$135.500
|
$180.000
|
$210.000
|
$230.000
|
$140.000
|
$350.000
|
$388.000
|
$450.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$5,500.000
|
$8,250.000
|
$6,505.000
|
$8,000.000
|
$9,115.700
|
$6,500.000
|
$7,500.000
|
$23,000.000
|
$5,000.000
|
$9,000.000
|
$6,780.000
|
$8,500.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
3.000
|
$4,200.000
|
$2,950.000
|
$3,500.000
|
$4,500.000
|
$2,469.600
|
$5,000.000
|
$4,000.000
|
$6,000.000
|
$6,200.000
|
$2,700.000
|
$3,500.000
|
$6,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$8,450.000
|
$4,000.000
|
$3,400.000
|
$4,721.200
|
$5,500.000
|
$5,000.000
|
$15,000.000
|
$8,000.000
|
$4,500.000
|
$7,800.000
|
$4,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$650.000
|
$450.000
|
$1,415.000
|
$820.000
|
$1,432.100
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
$2,500.000
|
$2,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$440.000
|
$650.000
|
$345.000
|
$420.000
|
$352.800
|
$1,000.000
|
$500.000
|
$800.000
|
$2,000.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
|
|
ADJUSTING MANHOLES (ELECTRIC BOX)
|
EA
|
1.000
|
$250.000
|
$300.000
|
$335.000
|
$420.000
|
$1,120.000
|
$600.000
|
$500.000
|
$800.000
|
$1,500.000
|
$2,200.000
|
$1,500.000
|
$850.000
|
|
|
ADJUSTING MANHOLES (TELEPHONE BOX)
|
EA
|
1.000
|
$250.000
|
$350.000
|
$350.000
|
$420.000
|
$1,120.000
|
$1,000.000
|
$500.000
|
$800.000
|
$1,500.000
|
$2,200.000
|
$1,500.000
|
$850.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$650.000
|
$600.000
|
$560.000
|
$1,100.000
|
$1,232.000
|
$500.000
|
$750.000
|
$800.000
|
$600.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$500.000
|
$450.000
|
$445.000
|
$1,100.000
|
$187.600
|
$600.000
|
$600.000
|
$500.000
|
$500.000
|
$2,000.000
|
$500.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
57.000
|
$25.000
|
$10.000
|
$24.000
|
$23.000
|
$38.100
|
$20.000
|
$10.000
|
$10.000
|
$35.000
|
$40.000
|
$10.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$203,000.000
|
$220,000.000
|
$10,000.000
|
$191,000.000
|
$250,000.000
|
$200,000.000
|
$250,000.000
|
$90,000.000
|
$278,000.000
|
$280,000.000
|
$350,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$2,100.000
|
$850.000
|
$2,000.000
|
$3,360.000
|
$8,500.000
|
$4,400.000
|
$7,000.000
|
$9,000.000
|
$2,000.000
|
$3,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
360.000
|
$35.000
|
$25.000
|
$100.000
|
$90.000
|
$33.600
|
$30.000
|
$30.000
|
$57.100
|
$26.760
|
$30.000
|
$290.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
360.000
|
$10.000
|
$5.000
|
$32.000
|
$30.000
|
$12.300
|
$10.000
|
$11.000
|
$10.750
|
$7.840
|
$10.000
|
$35.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
468.000
|
$25.000
|
$25.000
|
$35.000
|
$30.000
|
$28.000
|
$30.000
|
$26.000
|
$49.070
|
$30.750
|
$25.000
|
$25.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$9.000
|
$10.000
|
$22.500
|
$10.000
|
$5.600
|
$10.000
|
$8.000
|
$2.780
|
$8.790
|
$8.000
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,843.000
|
$2.500
|
$3.000
|
$3.000
|
$3.500
|
$2.300
|
$2.000
|
$2.000
|
$3.500
|
$2.680
|
$2.500
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,843.000
|
$1.000
|
$2.000
|
$0.850
|
$1.000
|
$0.700
|
$0.700
|
$1.000
|
$1.360
|
$0.530
|
$0.750
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
280.000
|
$5.000
|
$6.000
|
$5.400
|
$6.000
|
$13.400
|
$5.000
|
$4.000
|
$7.410
|
$6.000
|
$3.500
|
$6.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
280.000
|
$1.000
|
$1.000
|
$1.000
|
$1.200
|
$2.200
|
$1.000
|
$1.600
|
$1.020
|
$3.000
|
$0.900
|
$2.000
|
$9.000
|
|
|
CONC CURB (TY II)
|
LF
|
101.000
|
$15.000
|
$7.000
|
$8.250
|
$6.000
|
$18.800
|
$20.000
|
$45.000
|
$25.000
|
$10.000
|
$31.000
|
$25.000
|
$50.000
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
15.000
|
$15.000
|
$15.000
|
$28.000
|
$7.300
|
$18.800
|
$20.000
|
$60.000
|
$100.000
|
$45.000
|
$85.000
|
$45.000
|
$50.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
266.000
|
$75.000
|
$65.000
|
$130.000
|
$100.000
|
$58.200
|
$80.000
|
$70.000
|
$65.000
|
$75.000
|
$100.000
|
$88.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
29.000
|
$45.000
|
$60.000
|
$110.000
|
$59.000
|
$57.100
|
$70.000
|
$60.000
|
$120.000
|
$100.000
|
$50.000
|
$72.000
|
$65.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
9,658.000
|
$68.000
|
$48.000
|
$65.000
|
$49.000
|
$52.500
|
$70.000
|
$50.000
|
$79.000
|
$65.000
|
$57.000
|
$78.000
|
$60.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
5.000
|
$2,000.000
|
$1,550.000
|
$1,425.000
|
$1,600.000
|
$1,691.200
|
$1,700.000
|
$1,300.000
|
$2,000.000
|
$1,300.000
|
$1,600.000
|
$2,500.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$2,600.000
|
$1,650.000
|
$1,700.000
|
$1,600.000
|
$1,747.200
|
$2,600.000
|
$2,500.000
|
$3,000.000
|
$1,000.000
|
$1,800.000
|
$5,100.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
5.000
|
$2,600.000
|
$1,700.000
|
$1,700.000
|
$1,600.000
|
$1,747.200
|
$1,700.000
|
$2,400.000
|
$2,000.000
|
$1,600.000
|
$1,700.000
|
$2,500.000
|
$3,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
2,587.000
|
$20.000
|
$18.000
|
$19.500
|
$32.000
|
$19.300
|
$25.000
|
$18.000
|
$15.000
|
$40.250
|
$20.000
|
$45.000
|
$40.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
1,186.000
|
$18.000
|
$3.000
|
$4.750
|
$8.000
|
$4.700
|
$8.000
|
$10.000
|
$3.500
|
$7.000
|
$7.000
|
$25.000
|
$10.000
|
|
|
GATE (INSTALL)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$1,000.000
|
$1,500.000
|
$1,350.000
|
$2,500.000
|
$1,341.800
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
$1,906.760
|
$1,500.000
|
$25,000.000
|
$2,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
11.000
|
$30.000
|
$25.000
|
$22.000
|
$200.000
|
$17.600
|
$25.000
|
$19.000
|
$250.000
|
$19.500
|
$19.000
|
$500.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
12.000
|
$440.000
|
$455.000
|
$370.000
|
$530.000
|
$431.200
|
$500.000
|
$325.000
|
$250.000
|
$325.000
|
$450.000
|
$465.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
11.000
|
$450.000
|
$355.000
|
$335.000
|
$450.000
|
$308.000
|
$500.000
|
$300.000
|
$250.000
|
$295.000
|
$300.000
|
$356.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$80.000
|
$150.000
|
$95.000
|
$95.000
|
$95.200
|
$100.000
|
$85.000
|
$250.000
|
$85.000
|
$65.000
|
$1,500.000
|
$450.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
300.000
|
$3.000
|
$8.000
|
$4.550
|
$4.000
|
$3.600
|
$4.000
|
$4.000
|
$3.750
|
$3.800
|
$6.200
|
$5.000
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
65.000
|
$5.000
|
$27.000
|
$11.400
|
$9.000
|
$7.200
|
$8.000
|
$10.000
|
$7.000
|
$7.340
|
$10.500
|
$15.000
|
$15.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,096.000
|
$0.050
|
$0.500
|
$0.250
|
$0.350
|
$0.200
|
$0.300
|
$0.200
|
$0.250
|
$0.300
|
$1.050
|
$0.500
|
$2.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
300.000
|
$0.050
|
$1.150
|
$0.500
|
$1.200
|
$0.600
|
$1.000
|
$0.500
|
$2.000
|
$1.000
|
$2.100
|
$12.000
|
$3.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
65.000
|
$1.000
|
$2.500
|
$1.150
|
$2.400
|
$1.300
|
$2.000
|
$1.000
|
$4.000
|
$2.000
|
$4.200
|
$15.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,639.000
|
$0.400
|
$1.150
|
$1.150
|
$0.800
|
$1.300
|
$0.640
|
$1.000
|
$0.800
|
$0.640
|
$1.600
|
$0.500
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,457.000
|
$0.400
|
$1.500
|
$1.150
|
$0.800
|
$1.300
|
$0.640
|
$1.000
|
$0.800
|
$0.640
|
$1.600
|
$0.500
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,096.000
|
$0.050
|
$0.500
|
$0.100
|
$0.020
|
$0.300
|
$0.020
|
$0.100
|
$0.010
|
$0.020
|
$0.550
|
$0.250
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
300.000
|
$0.500
|
$1.350
|
$0.300
|
$0.250
|
$0.800
|
$0.200
|
$0.300
|
$0.010
|
$0.200
|
$1.050
|
$0.250
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
65.000
|
$0.500
|
$2.250
|
$0.650
|
$0.480
|
$1.700
|
$0.400
|
$0.600
|
$0.010
|
$0.400
|
$2.100
|
$2.000
|
$3.000
|
|
|
REMOVE RADAR VEHICLE DETECTION SYSTEM
|
EA
|
1.000
|
$450.000
|
$650.000
|
$905.000
|
$3,600.000
|
$1,120.000
|
$4,900.000
|
$700.000
|
$3,000.000
|
$2,500.000
|
$500.000
|
$1,500.000
|
$3,000.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
2,479.000
|
$1.000
|
$1.750
|
$1.000
|
$2.000
|
$1.100
|
$1.000
|
$0.900
|
$0.900
|
$1.990
|
$0.950
|
$5.000
|
$10.000
|
|
|
TREE PROTECTION
|
EA
|
2.000
|
$260.000
|
$500.000
|
$225.000
|
$200.000
|
$1,680.000
|
$500.000
|
$350.000
|
$1,000.000
|
$500.000
|
$350.000
|
$425.000
|
$1,000.000
|
|
|
FIXED BOLLARD
|
EA
|
2.000
|
$500.000
|
$1,350.000
|
$1,500.000
|
$1,000.000
|
$1,437.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
$650.000
|
$400.000
|
$2,000.000
|
$1,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
89.000
|
$250.000
|
$185.000
|
$400.000
|
$200.000
|
$166.900
|
$200.000
|
$220.000
|
$600.000
|
$210.000
|
$150.000
|
$500.000
|
$350.000
|
|
Totals: |
$2,236,121.600
|
$2,146,673.650
|
$2,326,433.770
|
$2,545,732.530
|
$2,587,093.486
|
$2,588,125.460
|
$2,634,584.100
|
$2,799,317.890
|
$2,844,787.650
|
$2,973,849.750
|
$3,153,213.800
|
$3,242,246.000
|