PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
1.000
|
$1,100.000
|
$2,500.000
|
$3,000.000
|
$5,000.000
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
321.000
|
$33.000
|
$70.000
|
$80.000
|
$50.000
|
$50.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
112.000
|
$22.000
|
$200.000
|
$100.000
|
$150.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
55.000
|
$55.000
|
$355.000
|
$200.000
|
$65.000
|
$100.000
|
|
|
BACKFILL (TY B)
|
STA
|
7.700
|
$1,100.000
|
$3,320.000
|
$3,000.000
|
$2,500.000
|
$4,500.000
|
|
|
BLADING
|
STA
|
7.700
|
$1,100.000
|
$300.000
|
$3,000.000
|
$400.000
|
$350.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
5,978.000
|
$0.550
|
$0.900
|
$2.000
|
$3.500
|
$2.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$275.000
|
$300.000
|
$300.000
|
$80.000
|
$150.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
837.000
|
$11.000
|
$10.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
380.000
|
$11.000
|
$15.000
|
$17.000
|
$20.000
|
$20.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
9,008.000
|
$7.700
|
$10.000
|
$10.000
|
$35.000
|
$7.500
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
204.000
|
$220.000
|
$210.000
|
$400.000
|
$1,000.000
|
$230.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
1,267.000
|
$11.000
|
$19.000
|
$12.000
|
$35.000
|
$25.000
|
|
|
CEM STABIL BKFL
|
CY
|
484.300
|
$330.000
|
$327.000
|
$400.000
|
$600.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
184.000
|
$55.000
|
$60.000
|
$1.000
|
$1.000
|
$350.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
948.000
|
$33.000
|
$8.000
|
$1.000
|
$10.000
|
$50.000
|
|
|
CL C CONC (CULV)
|
CY
|
183.800
|
$2,200.000
|
$1,350.000
|
$2,500.000
|
$3,200.000
|
$2,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
12.800
|
$1,100.000
|
$1,240.000
|
$3,000.000
|
$1,500.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
50.100
|
$880.000
|
$1,088.000
|
$1,000.000
|
$1,250.000
|
$1,700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.000
|
$1,100.000
|
$1,022.000
|
$1,200.000
|
$1,250.000
|
$1,700.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
22.500
|
$440.000
|
$927.000
|
$1,400.000
|
$1,250.000
|
$1,700.000
|
|
|
RAIL (TY T551)
|
LF
|
55.000
|
$275.000
|
$333.000
|
$250.000
|
$400.000
|
$300.000
|
|
|
INLET (COMPL) (DROP) (SPL)
|
EA
|
1.000
|
$16,500.000
|
$9,400.000
|
$20,000.000
|
$30,000.000
|
$40,000.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$22,000.000
|
$16,000.000
|
$50,000.000
|
$50,000.000
|
$40,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$4,400.000
|
$2,400.000
|
$10,000.000
|
$15,000.000
|
$7,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$27,500.000
|
$150,000.000
|
$80,000.000
|
$70,000.000
|
$425,350.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$204,000.000
|
$179,000.000
|
$756,000.000
|
$290,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$27,500.000
|
$1,800.000
|
$5,000.000
|
$4,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$55.000
|
$40.000
|
$50.000
|
$80.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$27.500
|
$10.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
900.000
|
$55.000
|
$40.000
|
$50.000
|
$65.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
900.000
|
$27.500
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
572.000
|
$4.400
|
$5.000
|
$5.000
|
$6.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
286.000
|
$2.200
|
$1.000
|
$1.000
|
$2.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,248.000
|
$8.800
|
$4.000
|
$7.000
|
$11.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
624.000
|
$4.400
|
$1.000
|
$1.000
|
$2.000
|
$5.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
600.000
|
$55.000
|
$90.000
|
$70.000
|
$65.000
|
$70.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
600.000
|
$22.000
|
$5.000
|
$13.000
|
$30.000
|
$45.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
600.000
|
$16.500
|
$13.000
|
$15.000
|
$30.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
600.000
|
$0.550
|
$12.000
|
$10.000
|
$15.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
450.000
|
$55.000
|
$35.000
|
$50.000
|
$45.000
|
$35.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$2,200.000
|
$1,780.000
|
$5,000.000
|
$2,000.000
|
$1,650.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,650.000
|
$1,185.000
|
$2,400.000
|
$1,200.000
|
$900.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
2.000
|
$2,200.000
|
$2,525.000
|
$1,000.000
|
$2,500.000
|
$2,365.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
675.000
|
$7.700
|
$2.000
|
$5.000
|
$3.000
|
$4.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$1,100.000
|
$237.000
|
$2,000.000
|
$400.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,400.000
|
$3,770.000
|
$5,000.000
|
$4,000.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$1,320.000
|
$235.000
|
$1,000.000
|
$300.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,300.000
|
$2,970.000
|
$2,000.000
|
$4,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,650.000
|
$1,188.000
|
$1,500.000
|
$2,000.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$11,000.000
|
$12,329.000
|
$15,000.000
|
$14,000.000
|
$11,100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$110.000
|
$17.000
|
$100.000
|
$25.000
|
$2,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
22.000
|
$110.000
|
$45.000
|
$100.000
|
$50.000
|
$55.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$110.000
|
$140.000
|
$160.000
|
$125.000
|
$140.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
5,080.000
|
$0.440
|
$0.750
|
$1.000
|
$0.800
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
1,280.000
|
$0.440
|
$1.000
|
$1.000
|
$1.100
|
$0.860
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,080.000
|
$0.440
|
$0.750
|
$1.000
|
$0.800
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
1,016.000
|
$4.400
|
$4.000
|
$10.000
|
$8.000
|
$3.650
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,016.000
|
$4.400
|
$4.000
|
$10.000
|
$8.000
|
$3.650
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
3,048.000
|
$4.400
|
$3.000
|
$9.000
|
$4.000
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
3,048.000
|
$4.400
|
$3.000
|
$9.000
|
$4.000
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
382.000
|
$3.300
|
$3.000
|
$15.000
|
$0.700
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,080.000
|
$1.100
|
$1.000
|
$1.000
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,280.000
|
$1.100
|
$1.000
|
$1.000
|
$0.800
|
$1.170
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,080.000
|
$1.100
|
$1.000
|
$1.000
|
$0.600
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
64.000
|
$5.500
|
$7.000
|
$24.000
|
$12.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,430.000
|
$2.200
|
$0.800
|
$1.000
|
$0.700
|
$0.750
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,500.000
|
$3,000.000
|
$2,000.000
|
$3,500.000
|
$540.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$3,300.000
|
$2,300.000
|
$2,000.000
|
$4,500.000
|
$540.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
1,267.000
|
$11.000
|
$10.000
|
$26.000
|
$20.000
|
$10.000
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
190.000
|
$11.000
|
$18.000
|
$22.000
|
$25.000
|
$20.000
|
|
|
TACK COAT
|
GAL
|
177.000
|
$11.000
|
$42.000
|
$20.000
|
$25.000
|
$10.000
|
|
|
D-GR HMA TY-C PG76-28 (EXEMPT)
|
TON
|
291.000
|
$275.000
|
$261.000
|
$400.000
|
$400.000
|
$400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
720.000
|
$99.000
|
$35.000
|
$1.000
|
$130.000
|
$110.000
|
|
|
TMA (STATIONARY)
|
DAY
|
350.000
|
$220.000
|
$360.000
|
$1.000
|
$250.000
|
$380.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$1,650.000
|
$475.000
|
$2,000.000
|
$700.000
|
$850.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$22,000.000
|
$20,000.000
|
$30,000.000
|
$5,000.000
|
$11,000.000
|
|
Totals: |
$2,242,931.400
|
$1,791,545.600
|
$2,790,830.000
|
$2,988,157.400
|
$3,053,623.200
|