PREPARING ROW
|
STA
|
12.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
$3,000.000
|
$15,000.000
|
$2,981.920
|
$8,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
421.000
|
$30.000
|
$15.000
|
$69.000
|
$35.000
|
$25.000
|
$40.820
|
$35.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
76.000
|
$100.000
|
$25.000
|
$500.000
|
$250.000
|
$35.000
|
$249.840
|
$125.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
70.000
|
$100.000
|
$100.000
|
$525.000
|
$150.000
|
$120.000
|
$183.590
|
$100.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
888.540
|
$10.000
|
$10.000
|
$30.690
|
$15.000
|
$20.000
|
$8.840
|
$25.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
20.140
|
$300.000
|
$500.000
|
$777.700
|
$400.000
|
$600.000
|
$901.320
|
$1,000.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
15.000
|
$800.000
|
$450.000
|
$3,800.000
|
$1,000.000
|
$400.000
|
$358.620
|
$485.000
|
|
|
APPROACH SLAB
|
CY
|
55.000
|
$1,000.000
|
$600.000
|
$1,500.000
|
$1,500.000
|
$1,100.000
|
$1,102.030
|
$975.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
4,702.000
|
$5.000
|
$23.000
|
$2.500
|
$10.000
|
$15.000
|
$28.900
|
$8.000
|
|
|
EPOXY WATERPROOF FINISH
|
SF
|
4,329.000
|
$5.000
|
$26.000
|
$3.500
|
$10.000
|
$25.000
|
$31.060
|
$8.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
50.000
|
$200.000
|
$100.000
|
$192.000
|
$400.000
|
$280.000
|
$300.920
|
$285.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
1,080.000
|
$125.000
|
$75.000
|
$60.000
|
$150.000
|
$130.000
|
$167.380
|
$550.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
199.000
|
$400.000
|
$250.000
|
$255.000
|
$200.000
|
$150.000
|
$279.050
|
$650.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
30.000
|
$600.000
|
$615.000
|
$4,000.000
|
$1,250.000
|
$1,100.000
|
$1,200.620
|
$675.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.000
|
$800.000
|
$600.000
|
$2,000.000
|
$1,500.000
|
$1,100.000
|
$1,568.490
|
$1,000.000
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
10.000
|
$400.000
|
$600.000
|
$500.000
|
$1,000.000
|
$1,100.000
|
$1,822.520
|
$1,000.000
|
|
|
RIPRAP (SPECIAL)
|
CY
|
0.400
|
$5,000.000
|
$600.000
|
$9,000.000
|
$8,000.000
|
$10,000.000
|
$18,460.460
|
$10,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
46.000
|
$600.000
|
$600.000
|
$1,300.000
|
$1,250.000
|
$800.000
|
$1,110.800
|
$585.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
2,418.000
|
$70.000
|
$70.000
|
$35.000
|
$50.000
|
$75.000
|
$63.310
|
$265.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
128.000
|
$150.000
|
$500.000
|
$130.000
|
$200.000
|
$600.000
|
$218.700
|
$185.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
70.000
|
$200.000
|
$400.000
|
$385.000
|
$300.000
|
$300.000
|
$187.990
|
$195.000
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
8.000
|
$400.000
|
$1,500.000
|
$1,155.000
|
$750.000
|
$650.000
|
$1,358.950
|
$458.000
|
|
|
PIPE (PVC) (SCH 40) (4 IN)
|
LF
|
38.100
|
$20.000
|
$100.000
|
$160.000
|
$300.000
|
$250.000
|
$31.720
|
$45.000
|
|
|
SHOT BLASTING
|
SY
|
2,418.000
|
$20.000
|
$34.000
|
$5.250
|
$15.000
|
$5.000
|
$17.170
|
$45.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$119,000.000
|
$150,000.000
|
$160,000.000
|
$160,000.000
|
$180,000.000
|
$513,572.000
|
$280,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$8,000.000
|
$8,000.000
|
$19,000.000
|
$30,000.000
|
$10,000.000
|
$1,890.040
|
$18,550.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
100.000
|
$30.000
|
$40.000
|
$60.500
|
$75.000
|
$55.000
|
$34.610
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$10.000
|
$10.000
|
$38.500
|
$25.000
|
$15.000
|
$12.610
|
$25.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
1,158.000
|
$5.000
|
$2.000
|
$16.500
|
$20.000
|
$14.000
|
$13.340
|
$22.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
680.000
|
$140.000
|
$50.000
|
$37.000
|
$30.000
|
$65.000
|
$33.900
|
$42.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$140.000
|
$100.000
|
$37.000
|
$30.000
|
$65.000
|
$77.660
|
$42.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
680.000
|
$25.000
|
$10.000
|
$12.000
|
$20.000
|
$20.000
|
$24.110
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$25.000
|
$50.000
|
$12.000
|
$20.000
|
$20.000
|
$54.480
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
680.000
|
$10.000
|
$10.000
|
$35.000
|
$30.000
|
$65.000
|
$32.900
|
$42.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$20.000
|
$35.000
|
$30.000
|
$65.000
|
$76.660
|
$42.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$25.000
|
$100.000
|
$35.750
|
$32.500
|
$45.000
|
$32.710
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
$258.500
|
$235.000
|
$2,200.000
|
$2,432.710
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$7.000
|
$10.000
|
$5.500
|
$5.000
|
$6.000
|
$4.860
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$350.000
|
$500.000
|
$935.000
|
$850.000
|
$500.000
|
$520.410
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$3,500.000
|
$781.000
|
$710.000
|
$500.000
|
$520.410
|
$3,600.000
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
4.000
|
$2,600.000
|
$200.000
|
$2,915.000
|
$2,650.000
|
$3,000.000
|
$3,340.210
|
$4,550.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$45.000
|
$55.000
|
$16.500
|
$15.000
|
$25.000
|
$33.490
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
15.000
|
$45.000
|
$50.000
|
$27.500
|
$25.000
|
$70.000
|
$32.720
|
$60.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$30.000
|
$272.000
|
$23.100
|
$21.000
|
$10.000
|
$27.080
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,100.000
|
$0.500
|
$1.000
|
$1.100
|
$1.000
|
$1.200
|
$1.180
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
272.000
|
$6.000
|
$2.000
|
$9.350
|
$8.500
|
$10.000
|
$9.940
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,100.000
|
$1.500
|
$1.500
|
$2.480
|
$2.250
|
$2.500
|
$2.550
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$10.000
|
$20.000
|
$11.000
|
$10.000
|
$14.000
|
$14.350
|
$12.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
130.000
|
$2.000
|
$15.000
|
$1.100
|
$2.000
|
$3.000
|
$1.900
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,020.000
|
$1.000
|
$1.250
|
$0.830
|
$0.750
|
$1.100
|
$0.900
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,720.000
|
$1.000
|
$1.250
|
$0.830
|
$0.750
|
$1.100
|
$0.880
|
$3.000
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
1,280.000
|
$8.000
|
$1.000
|
$11.550
|
$10.500
|
$11.500
|
$11.680
|
$3.000
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
1,280.000
|
$8.000
|
$1.000
|
$11.550
|
$10.500
|
$11.500
|
$11.680
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
147.000
|
$5.000
|
$8.000
|
$6.050
|
$5.500
|
$6.000
|
$7.140
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,790.000
|
$2.000
|
$0.800
|
$2.750
|
$2.500
|
$3.200
|
$2.840
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,560.000
|
$0.500
|
$1.000
|
$0.550
|
$0.500
|
$1.000
|
$0.610
|
$1.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$20,000.000
|
$10,000.000
|
$22,000.000
|
$20,000.000
|
$25,000.000
|
$45,638.610
|
$95,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,000.000
|
$5,000.000
|
$7,500.000
|
$700.000
|
$2,500.000
|
$12,850.360
|
$5,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$500.000
|
$5,000.000
|
$2,250.000
|
$700.000
|
$4,000.000
|
$3,697.800
|
$2,500.000
|
|
|
EMBEDDED GALVANIC ANODES
|
EA
|
400.000
|
$50.000
|
$50.000
|
$35.000
|
$20.000
|
$35.000
|
$82.900
|
$76.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$5,000.000
|
$20,000.000
|
$16,000.000
|
$15,000.000
|
$20,375.770
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
420.000
|
$250.000
|
$50.000
|
$100.000
|
$325.000
|
$250.000
|
$120.580
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$300.000
|
$200.000
|
$675.000
|
$950.000
|
$450.000
|
$420.760
|
$550.000
|
|
Totals: |
$1,306,086.400
|
$1,306,629.400
|
$1,457,435.121
|
$1,622,851.600
|
$1,762,267.800
|
$2,038,184.104
|
$2,913,741.000
|