|
|
PREPARING ROW
|
STA
|
43.000
|
$5,000.000
|
$7,500.000
|
$4,500.000
|
$4,000.000
|
$5,050.000
|
$7,185.000
|
|
|
REMOVING CONC (MISC)
|
CY
|
7.000
|
$100.000
|
$250.000
|
$800.000
|
$325.000
|
$580.000
|
$49.950
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
8,896.600
|
$2.000
|
$0.500
|
$2.500
|
$2.500
|
$1.000
|
$7.800
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
13,664.000
|
$15.000
|
$9.000
|
$10.000
|
$13.000
|
$13.000
|
$13.320
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
32,952.000
|
$17.000
|
$16.000
|
$10.000
|
$19.500
|
$26.000
|
$17.520
|
|
|
BLADING
|
HR
|
20.000
|
$100.000
|
$150.000
|
$100.000
|
$55.000
|
$118.000
|
$102.600
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
37,356.000
|
$1.250
|
$1.750
|
$3.000
|
$1.500
|
$2.750
|
$1.540
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
37,356.000
|
$0.500
|
$0.290
|
$0.330
|
$0.400
|
$0.350
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
9,399.000
|
$0.500
|
$0.390
|
$0.330
|
$0.400
|
$0.300
|
$0.310
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
9,399.000
|
$0.500
|
$0.390
|
$0.330
|
$0.400
|
$0.300
|
$0.310
|
|
|
VEGETATIVE WATERING
|
MG
|
314.400
|
$40.000
|
$27.000
|
$20.000
|
$50.000
|
$24.200
|
$23.310
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,446.700
|
$75.000
|
$55.000
|
$58.000
|
$62.000
|
$67.800
|
$62.170
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
182.300
|
$175.000
|
$125.000
|
$160.000
|
$142.000
|
$150.000
|
$147.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
11,467.900
|
$5.000
|
$1.000
|
$3.500
|
$3.500
|
$3.000
|
$3.420
|
|
|
CEMENT
|
TON
|
215.000
|
$135.000
|
$125.000
|
$150.000
|
$135.000
|
$130.000
|
$147.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
11,467.900
|
$5.000
|
$1.000
|
$3.500
|
$4.500
|
$2.000
|
$3.420
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,752.600
|
$5.000
|
$4.250
|
$5.250
|
$5.000
|
$5.300
|
$5.340
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
198.900
|
$150.000
|
$200.000
|
$225.750
|
$210.000
|
$229.000
|
$210.750
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
6,763.000
|
$5.000
|
$4.500
|
$4.200
|
$5.000
|
$4.910
|
$8.760
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
1,453.500
|
$100.000
|
$95.000
|
$120.750
|
$88.000
|
$122.000
|
$87.390
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
3,396.000
|
$100.000
|
$105.000
|
$126.000
|
$95.000
|
$128.000
|
$92.640
|
|
|
CEM STABIL BKFL
|
CY
|
200.000
|
$150.000
|
$140.000
|
$120.000
|
$140.000
|
$218.000
|
$233.390
|
|
|
TEMPORARY SPL SHORING
|
SF
|
879.000
|
$25.000
|
$30.000
|
$30.000
|
$24.000
|
$24.410
|
$44.260
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
520.000
|
$350.000
|
$200.000
|
$175.000
|
$250.000
|
$300.000
|
$331.800
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,192.000
|
$450.000
|
$350.000
|
$295.000
|
$395.000
|
$420.000
|
$467.540
|
|
|
CL C CONC (ABUT)
|
CY
|
67.500
|
$1,000.000
|
$1,100.000
|
$800.000
|
$650.000
|
$970.000
|
$1,289.080
|
|
|
CL C CONC (CAP)
|
CY
|
242.500
|
$950.000
|
$850.000
|
$900.000
|
$1,100.000
|
$1,070.000
|
$1,171.280
|
|
|
CL C CONC (COLUMN)
|
CY
|
224.800
|
$950.000
|
$800.000
|
$800.000
|
$1,100.000
|
$1,130.000
|
$997.300
|
|
|
REINF CONC SLAB
|
SF
|
52,624.000
|
$18.000
|
$16.000
|
$16.500
|
$14.000
|
$17.500
|
$20.900
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,160.500
|
$200.000
|
$135.000
|
$165.000
|
$167.000
|
$153.000
|
$154.910
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$450.000
|
$550.000
|
$500.000
|
$470.000
|
$630.000
|
$1,004.720
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,462.000
|
$140.000
|
$160.000
|
$125.000
|
$135.000
|
$165.000
|
$158.230
|
|
|
ELASTOMERIC BEARING (E8)
|
EA
|
5.000
|
$2,700.000
|
$2,800.000
|
$2,500.000
|
$2,700.000
|
$4,050.000
|
$5,218.300
|
|
|
ELASTOMERIC BEARING (F8)
|
EA
|
5.000
|
$2,700.000
|
$2,800.000
|
$2,500.000
|
$2,700.000
|
$4,050.000
|
$5,218.300
|
|
|
SLIDING ELASTOMERIC BEARING (ES 4)
|
EA
|
5.000
|
$1,900.000
|
$2,400.000
|
$2,500.000
|
$2,800.000
|
$3,370.000
|
$4,195.660
|
|
|
ELASTOMERIC BEARING(EE4)
|
EA
|
5.000
|
$1,200.000
|
$1,300.000
|
$2,500.000
|
$1,200.000
|
$2,050.000
|
$3,471.450
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,239,000.000
|
$1.800
|
$1.600
|
$2.040
|
$1.830
|
$1.900
|
$2.400
|
|
|
RAIL (TY T223)
|
LF
|
2,336.000
|
$100.000
|
$80.000
|
$55.000
|
$95.000
|
$107.000
|
$127.400
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
91.000
|
$95.000
|
$100.000
|
$90.000
|
$70.000
|
$116.000
|
$99.770
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
91.000
|
$150.000
|
$120.000
|
$90.000
|
$90.000
|
$144.000
|
$125.490
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
84.000
|
$275.000
|
$350.000
|
$175.000
|
$375.000
|
$192.000
|
$471.940
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
11.000
|
$300.000
|
$800.000
|
$185.000
|
$475.000
|
$420.000
|
$943.880
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
162.000
|
$110.000
|
$100.000
|
$60.000
|
$85.000
|
$390.000
|
$196.490
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$6,500.000
|
$10,000.000
|
$5,750.000
|
$7,000.000
|
$7,800.000
|
$6,539.150
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$5,400.000
|
$7,000.000
|
$5,750.000
|
$7,000.000
|
$6,700.000
|
$6,185.410
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,400.000
|
$3,340.000
|
$5,094.380
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,400.000
|
$1,200.000
|
$1,800.000
|
$3,640.000
|
$2,198.590
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$450,000.000
|
$350,000.000
|
$650,000.000
|
$325,000.000
|
$626,000.000
|
$658,491.490
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,100.000
|
$750.000
|
$5,000.000
|
$2,500.000
|
$3,430.000
|
$2,949.620
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$850,000.000
|
$800,000.000
|
$685,000.000
|
$910,000.000
|
$950,000.000
|
$1,106,090.030
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$4,000.000
|
$3,000.000
|
$3,500.000
|
$1,800.000
|
$2,730.000
|
$3,467.410
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
20.000
|
$40.000
|
$47.000
|
$60.000
|
$95.000
|
$55.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$10.000
|
$25.000
|
$25.000
|
$75.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,385.000
|
$3.000
|
$2.710
|
$2.350
|
$4.250
|
$2.250
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,385.000
|
$1.000
|
$0.470
|
$0.350
|
$1.000
|
$0.250
|
$0.250
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$50.000
|
$25.000
|
$30.000
|
$30.000
|
$24.500
|
$40.100
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$10.000
|
$3.000
|
$15.000
|
$12.000
|
$20.750
|
$17.040
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$20.000
|
$9.000
|
$15.000
|
$12.000
|
$24.500
|
$22.720
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
598.500
|
$30.000
|
$40.000
|
$35.000
|
$27.000
|
$40.750
|
$45.720
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
8,510.000
|
$0.750
|
$0.480
|
$0.850
|
$0.350
|
$0.500
|
$0.440
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
4,240.000
|
$0.750
|
$0.960
|
$0.850
|
$0.380
|
$0.950
|
$0.480
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$25.000
|
$25.400
|
$21.450
|
$23.000
|
$25.400
|
$22.980
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$1,675.000
|
$1,628.000
|
$1,720.000
|
$1,680.000
|
$1,414.000
|
|
|
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
|
EA
|
1.000
|
$1,900.000
|
$1,675.000
|
$1,628.000
|
$1,720.000
|
$1,680.000
|
$827.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$2.000
|
$1.250
|
$1.920
|
$5.000
|
$1.250
|
$1.140
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$200.000
|
$150.000
|
$198.000
|
$200.000
|
$150.000
|
$56.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$400.000
|
$150.000
|
$220.000
|
$200.000
|
$150.000
|
$28.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$3,000.000
|
$2,695.000
|
$3,000.000
|
$2,910.000
|
$2,643.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$150.000
|
$242.000
|
$300.000
|
$150.000
|
$110.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,500.000
|
$1,250.000
|
$600.000
|
$2,000.000
|
$1,250.000
|
$985.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$750.000
|
$750.000
|
$600.000
|
$1,200.000
|
$750.000
|
$610.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$7,250.000
|
$7,500.000
|
$8,500.000
|
$7,300.000
|
$6,800.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
471.000
|
$25.000
|
$14.000
|
$15.400
|
$12.000
|
$25.000
|
$14.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$500.000
|
$450.000
|
$165.000
|
$550.000
|
$650.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$500.000
|
$165.000
|
$575.000
|
$670.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$150.000
|
$65.000
|
$100.000
|
$150.000
|
$100.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$20.000
|
$10.000
|
$24.200
|
$16.000
|
$16.750
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$30.000
|
$15.000
|
$26.400
|
$29.000
|
$21.900
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,510.000
|
$1.000
|
$0.550
|
$0.600
|
$0.750
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,480.000
|
$1.000
|
$0.550
|
$0.600
|
$0.750
|
$0.550
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
154.000
|
$2.000
|
$1.250
|
$4.400
|
$2.000
|
$1.000
|
$1.780
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
8,510.000
|
$1.000
|
$0.600
|
$0.660
|
$0.550
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
8,480.000
|
$1.000
|
$0.600
|
$0.660
|
$0.550
|
$0.600
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
30.000
|
$20.000
|
$25.000
|
$27.500
|
$30.000
|
$25.000
|
$25.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
108.000
|
$6.000
|
$8.000
|
$8.800
|
$14.000
|
$8.000
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,600.000
|
$0.500
|
$1.000
|
$1.100
|
$2.500
|
$1.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$200.000
|
$175.000
|
$300.000
|
$175.000
|
$270.000
|
$306.460
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$10,000.000
|
$7,500.000
|
$30,000.000
|
$550.000
|
$41,000.000
|
$7,661.550
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$500.000
|
$100.000
|
$300.000
|
$250.000
|
$380.000
|
$61.290
|
|
Totals: |
$9,260,522.700
|
$8,087,778.910
|
$8,688,943.770
|
$8,700,166.250
|
$9,994,009.715
|
$10,802,412.978
|