|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
4.000
|
$2,500.000
|
$3,275.400
|
$2,060.000
|
$2,500.000
|
$2,109.000
|
$2,470.000
|
$1,000.000
|
$2,137.100
|
$2,000.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
15.000
|
$600.000
|
$2,225.400
|
$1,169.050
|
$750.000
|
$604.950
|
$642.000
|
$800.000
|
$1,212.800
|
$1,200.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
600.000
|
$20.000
|
$15.600
|
$10.900
|
$15.000
|
$9.060
|
$16.920
|
$20.000
|
$12.000
|
$30.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
380.160
|
$300.000
|
$513.000
|
$537.965
|
$500.000
|
$270.010
|
$591.860
|
$450.000
|
$500.000
|
$180.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
10,392.000
|
$10.000
|
$8.760
|
$12.571
|
$12.000
|
$15.110
|
$10.220
|
$26.000
|
$6.450
|
$22.680
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$85.500
|
$79.890
|
$100.000
|
$61.050
|
$125.000
|
$100.000
|
$123.000
|
$6.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
106,816.000
|
$0.300
|
$0.250
|
$0.258
|
$0.270
|
$0.390
|
$0.230
|
$0.250
|
$0.250
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
26,703.000
|
$0.200
|
$0.220
|
$0.227
|
$0.250
|
$0.110
|
$0.180
|
$0.220
|
$0.250
|
$0.100
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
26,703.000
|
$0.200
|
$0.220
|
$0.227
|
$0.250
|
$0.110
|
$0.180
|
$0.220
|
$0.250
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
2,436.000
|
$15.000
|
$19.980
|
$14.728
|
$12.000
|
$19.980
|
$36.000
|
$5.000
|
$71.200
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
28,864.000
|
$65.000
|
$43.110
|
$42.698
|
$49.250
|
$47.580
|
$52.760
|
$52.500
|
$61.000
|
$48.000
|
|
|
CEMENT
|
TON
|
1,289.000
|
$140.000
|
$126.000
|
$135.939
|
$138.000
|
$148.350
|
$129.340
|
$135.000
|
$140.000
|
$132.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
141,504.000
|
$1.200
|
$1.370
|
$1.485
|
$1.000
|
$1.490
|
$1.280
|
$3.000
|
$1.250
|
$1.530
|
|
|
ASPH (RC-250)
|
GAL
|
24,023.000
|
$3.500
|
$3.520
|
$3.474
|
$4.150
|
$3.400
|
$3.480
|
$4.850
|
$3.350
|
$3.500
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
862.000
|
$85.000
|
$45.090
|
$84.802
|
$90.000
|
$152.250
|
$67.780
|
$72.000
|
$59.700
|
$85.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
1,416.000
|
$90.000
|
$56.950
|
$91.037
|
$95.000
|
$82.490
|
$95.280
|
$93.650
|
$72.150
|
$85.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
929.600
|
$100.000
|
$56.980
|
$73.017
|
$95.000
|
$93.810
|
$95.280
|
$82.500
|
$72.150
|
$100.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
88,885.000
|
$2.250
|
$2.680
|
$2.816
|
$3.280
|
$2.320
|
$2.730
|
$2.400
|
$2.900
|
$2.950
|
|
|
CEM STABIL BKFL
|
CY
|
139.000
|
$150.000
|
$141.740
|
$103.980
|
$135.000
|
$111.000
|
$205.000
|
$180.000
|
$111.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
114.000
|
$125.000
|
$106.490
|
$73.193
|
$142.000
|
$72.150
|
$105.550
|
$75.000
|
$15.950
|
$75.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
90.000
|
$20.000
|
$21.000
|
$15.400
|
$11.000
|
$10.550
|
$25.000
|
$10.000
|
$3.150
|
$60.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,564.000
|
$15.000
|
$58.800
|
$41.820
|
$21.000
|
$33.300
|
$10.000
|
$30.000
|
$6.000
|
$10.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
91.000
|
$450.000
|
$393.720
|
$401.200
|
$421.000
|
$449.550
|
$515.000
|
$575.000
|
$546.450
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
4.400
|
$200.000
|
$392.730
|
$240.400
|
$155.000
|
$159.010
|
$392.730
|
$500.000
|
$241.600
|
$600.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
144.000
|
$200.000
|
$213.820
|
$136.215
|
$230.000
|
$199.800
|
$213.820
|
$200.000
|
$228.500
|
$180.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
180.000
|
$50.000
|
$27.300
|
$27.750
|
$52.000
|
$55.500
|
$60.000
|
$40.000
|
$88.500
|
$48.250
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
66.000
|
$50.000
|
$31.500
|
$30.840
|
$55.000
|
$58.280
|
$72.000
|
$45.000
|
$87.950
|
$54.240
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
56.000
|
$80.000
|
$35.700
|
$34.960
|
$62.500
|
$66.320
|
$83.000
|
$60.000
|
$94.750
|
$53.350
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
82.000
|
$300.000
|
$288.730
|
$246.625
|
$225.000
|
$224.220
|
$380.000
|
$290.000
|
$215.600
|
$250.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
20.000
|
$550.000
|
$414.720
|
$585.700
|
$550.000
|
$601.620
|
$435.000
|
$310.000
|
$793.700
|
$850.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
44.000
|
$600.000
|
$426.270
|
$394.290
|
$570.000
|
$613.830
|
$490.000
|
$440.000
|
$794.900
|
$950.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
60.000
|
$600.000
|
$377.970
|
$441.525
|
$705.000
|
$774.230
|
$520.000
|
$440.000
|
$619.350
|
$790.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$700.000
|
$677.200
|
$575.550
|
$705.000
|
$769.450
|
$550.000
|
$480.000
|
$1,328.500
|
$1,500.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
14.000
|
$750.000
|
$647.810
|
$618.560
|
$720.000
|
$787.700
|
$565.000
|
$590.000
|
$1,020.800
|
$1,200.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
45.000
|
$1,200.000
|
$573.260
|
$558.960
|
$725.000
|
$790.800
|
$825.000
|
$700.000
|
$1,014.000
|
$1,300.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
80.000
|
$1,200.000
|
$726.550
|
$646.170
|
$1,300.000
|
$1,382.310
|
$1,015.000
|
$1,050.000
|
$1,057.850
|
$1,000.000
|
|
|
CONC BOX CULV (9FT X 2FT)(EXTEND)
|
LF
|
14.000
|
$850.000
|
$646.760
|
$596.075
|
$925.000
|
$997.600
|
$780.000
|
$575.000
|
$1,027.400
|
$1,600.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
96.000
|
$65.000
|
$39.900
|
$39.070
|
$55.000
|
$58.250
|
$68.000
|
$45.000
|
$56.900
|
$58.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
319.000
|
$60.000
|
$67.200
|
$63.780
|
$50.000
|
$54.000
|
$90.000
|
$50.000
|
$73.150
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
38.000
|
$100.000
|
$70.350
|
$76.140
|
$70.000
|
$76.170
|
$115.000
|
$66.000
|
$107.850
|
$70.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
53.000
|
$150.000
|
$154.340
|
$208.440
|
$90.000
|
$97.400
|
$125.000
|
$79.000
|
$111.650
|
$90.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,000.000
|
$5,144.650
|
$4,144.650
|
$6,000.000
|
$6,382.500
|
$7,450.000
|
$5,000.000
|
$7,996.250
|
$6,500.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$25,000.000
|
$39,545.540
|
$30,301.500
|
$30,000.000
|
$33,023.000
|
$26,500.000
|
$41,250.000
|
$34,201.650
|
$28,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$35,000.000
|
$45,005.170
|
$34,285.500
|
$34,500.000
|
$36,713.250
|
$28,000.000
|
$50,250.000
|
$41,971.550
|
$30,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
4.000
|
$4,400.000
|
$3,359.770
|
$3,316.955
|
$4,500.000
|
$4,856.250
|
$5,900.000
|
$1,500.000
|
$3,054.150
|
$6,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$5,000.000
|
$7,690.720
|
$6,209.200
|
$8,250.000
|
$8,907.750
|
$6,300.000
|
$6,800.000
|
$8,417.950
|
$7,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
8.000
|
$6,500.000
|
$4,199.710
|
$3,626.155
|
$6,250.000
|
$6,687.010
|
$6,600.000
|
$2,000.000
|
$3,578.050
|
$3,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
10.000
|
$7,000.000
|
$4,304.710
|
$3,805.410
|
$4,250.000
|
$4,519.920
|
$6,100.000
|
$1,500.000
|
$2,703.550
|
$3,100.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$8,000.000
|
$5,564.620
|
$6,765.490
|
$6,000.000
|
$6,443.550
|
$7,900.000
|
$3,000.000
|
$6,098.700
|
$8,500.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$6,352.070
|
$6,597.040
|
$6,250.000
|
$6,687.750
|
$8,250.000
|
$4,000.000
|
$8,047.550
|
$9,800.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
10.000
|
$9,500.000
|
$6,824.530
|
$6,172.070
|
$9,250.000
|
$10,073.420
|
$11,200.000
|
$3,000.000
|
$6,550.700
|
$5,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$4,750.920
|
$5,134.020
|
$10,250.000
|
$11,238.750
|
$8,300.000
|
$2,500.000
|
$6,223.750
|
$7,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$5,380.880
|
$5,566.480
|
$11,250.000
|
$12,267.720
|
$8,300.000
|
$3,500.000
|
$8,014.900
|
$7,500.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$900.000
|
$1,574.890
|
$1,337.000
|
$725.000
|
$785.880
|
$1,100.000
|
$1,250.000
|
$968.450
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
55.000
|
$1,100.000
|
$981.680
|
$1,337.000
|
$825.000
|
$904.650
|
$1,200.000
|
$950.000
|
$974.650
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,021.110
|
$1,216.490
|
$825.000
|
$888.000
|
$1,200.000
|
$1,200.000
|
$954.350
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$1,622.140
|
$1,439.000
|
$1,000.000
|
$1,060.050
|
$1,200.000
|
$1,300.000
|
$1,062.300
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
45.000
|
$1,200.000
|
$1,622.140
|
$1,336.500
|
$825.000
|
$895.770
|
$1,200.000
|
$1,500.000
|
$1,062.250
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$2,000.000
|
$1,207.420
|
$1,748.000
|
$1,150.000
|
$1,179.430
|
$1,800.000
|
$1,200.000
|
$1,411.950
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,200.000
|
$1,784.880
|
$1,603.800
|
$1,150.000
|
$1,188.390
|
$1,900.000
|
$1,400.000
|
$1,021.700
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$2,231.100
|
$1,797.750
|
$1,150.000
|
$1,209.900
|
$1,900.000
|
$1,600.000
|
$1,445.850
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$2,519.830
|
$2,003.750
|
$2,000.000
|
$2,140.360
|
$2,400.000
|
$2,000.000
|
$2,176.900
|
$1,200.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,081.430
|
$1,094.980
|
$1,650.000
|
$1,763.500
|
$2,100.000
|
$1,200.000
|
$1,400.400
|
$1,600.000
|
|
|
REMOV STR (SMALL)
|
EA
|
5.000
|
$500.000
|
$1,312.410
|
$920.000
|
$1,250.000
|
$1,249.470
|
$750.000
|
$1,000.000
|
$348.450
|
$10,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$450,000.000
|
$255,360.260
|
$439,270.447
|
$400,000.000
|
$484,274.510
|
$183,800.000
|
$350,000.000
|
$400,987.100
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,500.000
|
$2,435.450
|
$5,279.146
|
$1,650.000
|
$721.500
|
$3,748.000
|
$5,000.000
|
$5,357.300
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
880.000
|
$30.000
|
$21.570
|
$22.217
|
$22.500
|
$25.530
|
$21.570
|
$21.600
|
$23.050
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
880.000
|
$10.000
|
$6.000
|
$6.180
|
$6.500
|
$7.770
|
$6.000
|
$6.000
|
$6.400
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,820.000
|
$2.500
|
$2.650
|
$2.730
|
$2.650
|
$2.780
|
$2.650
|
$2.650
|
$2.850
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,820.000
|
$0.750
|
$0.250
|
$0.258
|
$0.250
|
$0.670
|
$0.250
|
$0.250
|
$0.250
|
$0.600
|
|
|
DRIVEWAYS (CONC)
|
SY
|
41.000
|
$80.000
|
$57.750
|
$102.000
|
$100.000
|
$83.250
|
$76.250
|
$82.000
|
$115.100
|
$150.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,783.000
|
$20.000
|
$21.900
|
$28.713
|
$17.500
|
$8.880
|
$37.370
|
$28.000
|
$17.050
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
675.000
|
$20.000
|
$17.650
|
$18.180
|
$17.750
|
$23.250
|
$17.650
|
$17.650
|
$18.850
|
$20.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$50.000
|
$17.650
|
$18.180
|
$17.750
|
$23.870
|
$17.650
|
$17.650
|
$18.850
|
$20.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$50.000
|
$45.400
|
$46.762
|
$46.000
|
$43.350
|
$45.400
|
$45.400
|
$48.500
|
$48.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,400.000
|
$2,329.000
|
$2,398.870
|
$2,500.000
|
$2,495.280
|
$2,329.000
|
$2,329.000
|
$2,488.650
|
$2,500.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$400.000
|
$275.000
|
$360.500
|
$330.000
|
$316.350
|
$275.000
|
$327.000
|
$348.600
|
$350.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
37.000
|
$150.000
|
$110.000
|
$133.900
|
$132.000
|
$194.250
|
$110.000
|
$131.000
|
$139.550
|
$150.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
8.000
|
$200.000
|
$150.000
|
$180.250
|
$175.000
|
$205.350
|
$150.000
|
$173.000
|
$184.350
|
$180.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$425.000
|
$375.000
|
$448.050
|
$462.000
|
$532.800
|
$375.000
|
$460.000
|
$492.150
|
$460.580
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
29.000
|
$300.000
|
$245.000
|
$319.300
|
$315.000
|
$360.750
|
$245.000
|
$314.000
|
$335.300
|
$313.810
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$50.000
|
$50.000
|
$97.850
|
$70.000
|
$99.900
|
$50.000
|
$65.000
|
$65.650
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
34.000
|
$50.000
|
$52.000
|
$61.800
|
$45.000
|
$43.400
|
$52.000
|
$39.000
|
$41.650
|
$39.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$25.000
|
$28.000
|
$15.450
|
$15.000
|
$17.210
|
$28.000
|
$13.800
|
$14.750
|
$13.800
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
13,350.000
|
$0.200
|
$0.190
|
$0.268
|
$0.260
|
$0.120
|
$0.190
|
$0.110
|
$0.300
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
76,200.000
|
$0.200
|
$0.160
|
$0.268
|
$0.260
|
$0.120
|
$0.160
|
$0.110
|
$0.300
|
$0.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,850.000
|
$1.500
|
$1.550
|
$1.213
|
$1.000
|
$0.720
|
$1.500
|
$1.000
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
76,032.000
|
$0.750
|
$0.280
|
$0.350
|
$0.340
|
$0.310
|
$0.280
|
$0.280
|
$0.350
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,675.000
|
$0.300
|
$0.360
|
$0.350
|
$0.340
|
$0.310
|
$0.360
|
$0.280
|
$0.350
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
38,100.000
|
$0.250
|
$0.300
|
$0.350
|
$0.340
|
$0.310
|
$0.300
|
$0.280
|
$0.350
|
$0.340
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
15.000
|
$25.000
|
$14.400
|
$41.200
|
$40.000
|
$27.750
|
$14.400
|
$25.000
|
$42.750
|
$40.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
820.000
|
$4.000
|
$2.600
|
$4.120
|
$4.000
|
$8.880
|
$2.600
|
$8.000
|
$4.250
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$8,118.750
|
$12,936.000
|
$17,500.000
|
$13,320.000
|
$21,600.000
|
$15,000.000
|
$6,731.900
|
$7,500.000
|
|
Totals: |
$4,970,247.050
|
$4,044,139.160
|
$4,364,990.249
|
$4,502,313.700
|
$4,540,857.832
|
$4,559,629.798
|
$4,762,188.980
|
$4,821,087.580
|
$4,877,238.720
|