|
|
|
PREPARING ROW
|
STA
|
22.000
|
$4,500.000
|
$1,478.520
|
$512.410
|
$2,081.198
|
$2,416.210
|
$250.000
|
$545.000
|
$1,242.150
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
68.000
|
$25.000
|
$21.390
|
$27.000
|
$28.686
|
$71.900
|
$20.000
|
$20.000
|
$17.600
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,372.000
|
$15.000
|
$11.790
|
$20.800
|
$14.890
|
$14.380
|
$13.250
|
$22.740
|
$16.000
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
6,318.000
|
$15.000
|
$12.360
|
$15.080
|
$18.082
|
$11.430
|
$17.750
|
$37.700
|
$19.270
|
|
|
|
BLADING
|
HR
|
100.000
|
$100.000
|
$79.800
|
$125.000
|
$91.917
|
$72.150
|
$145.000
|
$90.000
|
$88.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
200,696.000
|
$0.110
|
$0.120
|
$0.110
|
$0.125
|
$0.140
|
$0.130
|
$0.270
|
$0.130
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
50,174.000
|
$0.110
|
$0.080
|
$0.090
|
$0.083
|
$0.120
|
$0.120
|
$0.270
|
$0.110
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
50,174.000
|
$0.110
|
$0.080
|
$0.090
|
$0.083
|
$0.120
|
$0.120
|
$0.270
|
$0.110
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,699.000
|
$25.000
|
$8.850
|
$39.000
|
$23.766
|
$20.000
|
$25.000
|
$20.550
|
$14.400
|
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
18,756.000
|
$58.000
|
$49.730
|
$54.960
|
$49.895
|
$49.000
|
$61.000
|
$57.870
|
$58.600
|
|
|
|
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
|
CY
|
6,119.000
|
$58.000
|
$49.740
|
$56.370
|
$50.499
|
$44.610
|
$54.250
|
$49.950
|
$51.900
|
|
|
|
CEMENT
|
TON
|
593.000
|
$150.000
|
$151.200
|
$154.720
|
$164.892
|
$166.160
|
$169.000
|
$156.880
|
$141.180
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
94,784.000
|
$2.000
|
$2.280
|
$1.730
|
$1.739
|
$1.000
|
$1.000
|
$1.590
|
$2.160
|
|
|
|
ASPH (RC-250)
|
GAL
|
15,773.000
|
$4.100
|
$3.950
|
$3.900
|
$3.570
|
$3.900
|
$3.800
|
$3.380
|
$3.880
|
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
575.000
|
$85.000
|
$63.080
|
$80.110
|
$80.488
|
$130.050
|
$123.000
|
$145.260
|
$71.400
|
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
944.000
|
$90.000
|
$79.400
|
$91.060
|
$84.970
|
$94.940
|
$108.000
|
$118.060
|
$83.520
|
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
616.000
|
$90.000
|
$79.540
|
$89.840
|
$72.991
|
$101.920
|
$85.000
|
$149.660
|
$99.020
|
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
58,071.000
|
$4.000
|
$3.200
|
$3.590
|
$3.112
|
$3.170
|
$3.200
|
$2.880
|
$3.250
|
|
|
|
CEM STABIL BKFL
|
CY
|
24.600
|
$150.000
|
$158.410
|
$65.000
|
$130.000
|
$138.750
|
$155.000
|
$145.000
|
$125.000
|
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
25.000
|
$60.000
|
$184.180
|
$58.000
|
$104.000
|
$111.000
|
$12.000
|
$75.000
|
$100.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,030.000
|
$29.000
|
$22.170
|
$28.500
|
$62.400
|
$66.600
|
$40.000
|
$63.600
|
$60.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.400
|
$400.000
|
$1,023.310
|
$425.000
|
$624.000
|
$666.000
|
$1,000.000
|
$1,035.100
|
$600.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
62.500
|
$450.000
|
$396.970
|
$435.000
|
$676.000
|
$721.500
|
$545.000
|
$333.000
|
$650.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
128.200
|
$170.000
|
$134.340
|
$325.000
|
$130.000
|
$138.750
|
$180.000
|
$148.300
|
$125.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
4.800
|
$450.000
|
$755.290
|
$465.000
|
$780.000
|
$832.500
|
$825.000
|
$949.300
|
$750.000
|
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
72.000
|
$75.000
|
$113.370
|
$65.000
|
$49.920
|
$53.280
|
$55.000
|
$48.570
|
$48.000
|
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
50.000
|
$115.000
|
$127.240
|
$75.000
|
$91.520
|
$104.340
|
$60.000
|
$60.970
|
$88.000
|
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$650.000
|
$842.580
|
$435.000
|
$520.000
|
$610.500
|
$500.000
|
$989.090
|
$500.000
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$700.000
|
$829.340
|
$450.000
|
$572.000
|
$666.000
|
$550.000
|
$1,020.100
|
$550.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
186.000
|
$750.000
|
$600.000
|
$455.000
|
$676.000
|
$777.000
|
$600.000
|
$519.760
|
$650.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
18.000
|
$800.000
|
$900.000
|
$460.000
|
$728.000
|
$832.500
|
$700.000
|
$1,081.120
|
$700.000
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
27.500
|
$1,030.000
|
$1,100.000
|
$1,025.000
|
$988.000
|
$1,054.500
|
$1,100.000
|
$1,751.560
|
$950.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
300.000
|
$75.000
|
$100.000
|
$0.000
|
$58.240
|
$0.000
|
$0.000
|
$0.000
|
$56.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
142.000
|
$80.000
|
$120.000
|
$96.000
|
$109.200
|
$157.620
|
$95.000
|
$61.070
|
$105.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$110.000
|
$490.000
|
$115.000
|
$166.400
|
$177.600
|
$155.000
|
$101.850
|
$160.000
|
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$16,500.000
|
$5,800.000
|
$13,600.000
|
$10,400.000
|
$11,100.000
|
$20,000.000
|
$10,178.000
|
$10,000.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$5,500.000
|
$5,500.000
|
$5,200.000
|
$5,200.000
|
$6,105.000
|
$8,000.000
|
$4,406.320
|
$5,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$4,000.000
|
$6,200.000
|
$6,916.000
|
$7,770.000
|
$10,000.000
|
$7,834.240
|
$6,650.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
18.000
|
$6,650.000
|
$3,538.480
|
$6,500.000
|
$7,956.000
|
$8,880.000
|
$8,200.000
|
$3,724.920
|
$7,650.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$7,073.730
|
$6,700.000
|
$8,320.000
|
$9,435.000
|
$11,500.000
|
$8,066.580
|
$8,000.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
3.000
|
$8,000.000
|
$5,084.580
|
$7,100.000
|
$8,840.000
|
$9,435.000
|
$8,500.000
|
$6,135.140
|
$8,500.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
5.000
|
$8,500.000
|
$3,978.480
|
$7,300.000
|
$9,880.000
|
$10,545.000
|
$8,000.000
|
$6,360.320
|
$9,500.000
|
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,080.000
|
$1,198.540
|
$1,600.000
|
$832.000
|
$888.000
|
$1,900.000
|
$1,009.960
|
$800.000
|
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$1,200.000
|
$1,403.940
|
$1,600.000
|
$936.000
|
$1,054.500
|
$1,500.000
|
$1,062.960
|
$900.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,275.000
|
$1,137.980
|
$1,800.000
|
$884.000
|
$943.500
|
$2,300.000
|
$1,104.970
|
$850.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,300.000
|
$1,544.060
|
$0.000
|
$1,345.143
|
$0.000
|
$0.000
|
$0.000
|
$950.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,833.260
|
$2,100.000
|
$1,248.000
|
$1,975.800
|
$2,000.000
|
$1,233.360
|
$1,200.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$1,682.280
|
$2,300.000
|
$1,040.000
|
$3,113.550
|
$2,500.000
|
$1,539.760
|
$1,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,700.000
|
$2,031.980
|
$2,500.000
|
$1,352.000
|
$2,336.550
|
$2,400.000
|
$1,576.860
|
$1,300.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,200.000
|
$2,619.200
|
$3,200.000
|
$2,600.000
|
$3,718.500
|
$2,700.000
|
$2,558.120
|
$2,500.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$750.000
|
$1,041.160
|
$750.000
|
$3,080.000
|
$3,296.700
|
$1,350.000
|
$1,000.000
|
$2,000.000
|
|
|
|
REMOV STR (SMALL)
|
EA
|
4.000
|
$1,200.000
|
$496.440
|
$600.000
|
$2,810.000
|
$1,690.530
|
$600.000
|
$1,000.000
|
$1,500.000
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
200.000
|
$6.000
|
$2.410
|
$2.000
|
$10.400
|
$16.650
|
$8.000
|
$4.000
|
$12.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$300,000.000
|
$146,550.000
|
$368,228.566
|
$365,000.000
|
$200,000.000
|
$381,106.100
|
$442,681.150
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$3,800.000
|
$5,000.000
|
$6,912.000
|
$5,985.005
|
$6,454.760
|
$4,000.000
|
$1,113.000
|
$19,460.530
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
155.000
|
$35.000
|
$22.000
|
$42.250
|
$25.932
|
$46.620
|
$32.000
|
$37.100
|
$42.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
155.000
|
$10.000
|
$7.000
|
$25.650
|
$7.280
|
$11.100
|
$11.000
|
$21.200
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
780.000
|
$3.500
|
$3.500
|
$4.650
|
$3.640
|
$4.440
|
$4.000
|
$6.360
|
$4.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
780.000
|
$1.000
|
$1.500
|
$1.750
|
$1.560
|
$1.110
|
$3.000
|
$3.180
|
$1.000
|
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
947.000
|
$30.000
|
$30.660
|
$32.740
|
$22.331
|
$20.980
|
$33.000
|
$20.000
|
$40.280
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
68.000
|
$70.000
|
$100.370
|
$97.000
|
$156.000
|
$186.480
|
$185.000
|
$99.400
|
$156.600
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
205.000
|
$40.000
|
$41.520
|
$70.000
|
$35.706
|
$36.050
|
$48.000
|
$30.000
|
$61.750
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,068.000
|
$30.000
|
$30.660
|
$37.260
|
$22.919
|
$24.420
|
$33.000
|
$9.990
|
$37.000
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
293.000
|
$30.000
|
$30.660
|
$34.490
|
$23.893
|
$21.550
|
$35.000
|
$15.800
|
$51.600
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
376.000
|
$22.000
|
$19.000
|
$29.540
|
$23.452
|
$22.460
|
$34.000
|
$26.390
|
$22.550
|
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$30.000
|
$28.000
|
$32.020
|
$25.865
|
$35.540
|
$85.000
|
$31.540
|
$24.870
|
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$850.000
|
$8.500
|
$852.040
|
$994.240
|
$946.830
|
$1,900.000
|
$1,054.700
|
$956.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
87.000
|
$60.000
|
$60.000
|
$59.950
|
$73.788
|
$66.600
|
$100.000
|
$52.950
|
$70.950
|
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$950.000
|
$1,400.000
|
$1,587.130
|
$2,058.160
|
$1,762.680
|
$1,000.000
|
$1,926.020
|
$1,979.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,600.000
|
$2,450.000
|
$2,945.000
|
$3,017.040
|
$3,268.950
|
$3,000.000
|
$3,121.700
|
$2,901.000
|
|
|
|
WIRE FENCE (TY A)
|
LF
|
65.000
|
$16.000
|
$16.810
|
$15.000
|
$23.046
|
$27.750
|
$70.000
|
$42.400
|
$22.160
|
|
|
|
WIRE FENCE (TY B)
|
LF
|
200.000
|
$16.000
|
$16.810
|
$18.000
|
$23.899
|
$27.750
|
$40.000
|
$26.500
|
$22.980
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$350.000
|
$275.000
|
$350.000
|
$364.000
|
$381.840
|
$400.000
|
$469.790
|
$350.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
9.000
|
$150.000
|
$225.000
|
$115.000
|
$119.600
|
$162.060
|
$150.000
|
$206.700
|
$115.000
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$175.000
|
$275.000
|
$155.000
|
$161.200
|
$227.550
|
$175.000
|
$217.300
|
$155.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$450.000
|
$800.000
|
$575.000
|
$598.000
|
$614.940
|
$650.000
|
$908.420
|
$575.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
23.000
|
$350.000
|
$350.000
|
$310.000
|
$322.400
|
$437.340
|
$350.000
|
$551.200
|
$310.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$75.000
|
$70.000
|
$75.000
|
$78.000
|
$111.000
|
$100.000
|
$132.500
|
$75.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$26.000
|
$22.000
|
$28.000
|
$29.120
|
$26.640
|
$30.000
|
$39.170
|
$28.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
26.000
|
$65.000
|
$45.000
|
$55.000
|
$57.200
|
$76.590
|
$60.000
|
$59.150
|
$55.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
49,724.000
|
$0.250
|
$0.380
|
$0.280
|
$0.270
|
$0.290
|
$0.450
|
$0.400
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
4,873.000
|
$0.250
|
$0.400
|
$0.340
|
$0.270
|
$0.290
|
$0.450
|
$0.420
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
23,883.000
|
$0.250
|
$0.380
|
$0.280
|
$0.270
|
$0.290
|
$0.450
|
$0.400
|
$0.260
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,778.000
|
$2.000
|
$1.780
|
$1.500
|
$1.391
|
$0.780
|
$0.750
|
$3.120
|
$1.380
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
49,724.000
|
$0.350
|
$0.320
|
$0.360
|
$0.343
|
$0.370
|
$0.400
|
$0.340
|
$0.330
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,873.000
|
$0.350
|
$0.330
|
$0.450
|
$0.364
|
$0.390
|
$0.400
|
$0.350
|
$0.350
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
23,883.000
|
$0.350
|
$0.320
|
$0.450
|
$0.354
|
$0.380
|
$0.400
|
$0.340
|
$0.340
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
550.000
|
$5.000
|
$4.000
|
$4.800
|
$3.921
|
$4.180
|
$4.500
|
$4.240
|
$3.770
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$7,547.510
|
$11,750.000
|
$13,276.000
|
$8,325.000
|
$7,000.000
|
$11,554.000
|
$12,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
135.000
|
$245.000
|
$251.580
|
$150.000
|
$251.450
|
$111.000
|
$340.000
|
$239.700
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$350.000
|
$1,006.330
|
$200.000
|
$481.500
|
$1,332.000
|
$50.000
|
$400.000
|
$40.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
140.000
|
$75.000
|
$0.000
|
$84.000
|
$0.000
|
$133.200
|
$60.000
|
$52.450
|
$0.000
|
|
1
|
|
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
|
EA
|
8.000
|
$1,300.000
|
$0.000
|
$1,600.000
|
$0.000
|
$1,448.550
|
$1,200.000
|
$947.660
|
$0.000
|
|
1
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,300.000
|
$0.000
|
$1,800.000
|
$0.000
|
$2,086.800
|
$1,850.000
|
$1,263.840
|
$0.000
|
|
1
|
|
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
|
LF
|
160.000
|
$75.000
|
$0.000
|
$45.000
|
$0.000
|
$11.100
|
$40.000
|
$34.180
|
$0.000
|
|
Totals: |
$3,923,000.140
|
$3,364,665.425
|
$3,522,770.440
|
$3,642,421.759
|
$3,662,934.230
|
$3,702,957.090
|
$3,866,465.900
|
$4,024,374.050
|