PREPARING ROW
|
STA
|
3.200
|
$2,500.000
|
$5,000.000
|
$5,700.000
|
$2,500.000
|
$4,218.000
|
$9,510.000
|
$4,470.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,166.000
|
$15.000
|
$14.000
|
$8.000
|
$15.000
|
$21.000
|
$16.800
|
$27.870
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
548.000
|
$15.000
|
$25.000
|
$20.000
|
$10.000
|
$26.000
|
$21.700
|
$30.150
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
851.000
|
$20.000
|
$31.000
|
$8.000
|
$10.000
|
$12.000
|
$23.250
|
$25.590
|
|
|
BLADING
|
HR
|
110.000
|
$80.000
|
$80.000
|
$115.000
|
$55.000
|
$101.000
|
$67.200
|
$125.400
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
14,420.000
|
$0.500
|
$0.310
|
$0.320
|
$0.400
|
$0.350
|
$0.450
|
$0.410
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
3,605.000
|
$1.000
|
$0.360
|
$0.370
|
$0.490
|
$0.350
|
$0.500
|
$0.510
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
3,605.000
|
$1.000
|
$0.360
|
$0.370
|
$0.490
|
$0.350
|
$0.500
|
$0.510
|
|
|
VEGETATIVE WATERING
|
MG
|
121.500
|
$100.000
|
$30.000
|
$32.700
|
$45.000
|
$17.500
|
$37.450
|
$36.630
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
510.000
|
$2.500
|
$1.690
|
$1.750
|
$1.750
|
$1.750
|
$1.700
|
$1.640
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
3,071.000
|
$70.000
|
$55.000
|
$70.000
|
$82.000
|
$65.000
|
$66.700
|
$68.960
|
|
|
CEMENT
|
TON
|
139.000
|
$150.000
|
$155.000
|
$195.000
|
$152.000
|
$141.000
|
$164.500
|
$210.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
8,704.000
|
$3.000
|
$2.100
|
$1.850
|
$3.500
|
$2.600
|
$6.550
|
$4.560
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,416.000
|
$6.000
|
$4.500
|
$4.350
|
$4.000
|
$6.850
|
$4.000
|
$8.760
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
84.000
|
$300.000
|
$105.000
|
$104.000
|
$92.000
|
$200.000
|
$95.000
|
$204.270
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
55.000
|
$300.000
|
$105.000
|
$104.000
|
$92.000
|
$267.000
|
$95.000
|
$204.270
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
5,243.000
|
$4.000
|
$4.500
|
$4.350
|
$4.500
|
$4.750
|
$4.000
|
$8.760
|
|
|
CEM STABIL BKFL
|
CY
|
116.900
|
$150.000
|
$135.000
|
$227.000
|
$155.000
|
$193.000
|
$177.500
|
$200.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,209.000
|
$120.000
|
$150.000
|
$116.000
|
$183.000
|
$170.000
|
$131.000
|
$156.000
|
|
|
CL C CONC (ABUT)
|
CY
|
48.000
|
$800.000
|
$750.000
|
$1,000.000
|
$950.000
|
$1,090.000
|
$830.000
|
$900.000
|
|
|
CL C CONC (CAP)
|
CY
|
32.000
|
$1,000.000
|
$905.000
|
$1,500.000
|
$1,200.000
|
$1,290.000
|
$1,065.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
13.000
|
$1,200.000
|
$900.000
|
$1,200.000
|
$1,400.000
|
$1,635.000
|
$1,555.000
|
$1,100.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
7,228.000
|
$15.000
|
$12.750
|
$14.500
|
$13.500
|
$19.000
|
$15.250
|
$30.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
1,776.000
|
$125.000
|
$139.500
|
$178.000
|
$134.190
|
$154.000
|
$144.950
|
$145.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
11.000
|
$500.000
|
$600.000
|
$500.000
|
$450.000
|
$751.000
|
$600.000
|
$850.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
453.000
|
$90.000
|
$140.000
|
$150.000
|
$100.000
|
$118.000
|
$152.000
|
$170.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
55.000
|
$90.000
|
$190.000
|
$170.000
|
$140.000
|
$127.000
|
$163.500
|
$210.000
|
|
|
RAIL (TY T223)
|
LF
|
498.000
|
$110.000
|
$75.000
|
$73.700
|
$93.000
|
$109.500
|
$96.600
|
$150.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
114.000
|
$80.000
|
$75.000
|
$108.000
|
$65.000
|
$79.000
|
$59.000
|
$85.000
|
|
|
CONC BOX CULV (9 FT X 3 FT)
|
LF
|
30.000
|
$850.000
|
$900.000
|
$1,170.000
|
$850.000
|
$822.000
|
$539.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
24.000
|
$90.000
|
$65.000
|
$72.700
|
$70.000
|
$104.000
|
$52.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
95.000
|
$125.000
|
$80.000
|
$72.800
|
$80.000
|
$83.300
|
$53.000
|
$85.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$10,000.000
|
$7,500.000
|
$18,100.000
|
$16,000.000
|
$8,830.000
|
$8,880.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$9,500.000
|
$20,400.000
|
$18,000.000
|
$10,890.000
|
$10,870.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$1,920.000
|
$900.000
|
$1,770.000
|
$1,595.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,110.000
|
$1,100.000
|
$1,950.000
|
$1,795.000
|
$1,700.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$42,000.000
|
$29,300.000
|
$13,000.000
|
$15,000.000
|
$22,460.000
|
$17,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$56,000.000
|
$23,800.000
|
$15,000.000
|
$15,000.000
|
$23,820.000
|
$18,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,000.000
|
$250,000.000
|
$137,000.000
|
$158,000.000
|
$150,000.000
|
$167,250.000
|
$164,140.730
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$3,000.000
|
$800.000
|
$487.000
|
$2,500.000
|
$494.000
|
$3,000.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
150.000
|
$35.000
|
$23.950
|
$24.700
|
$40.000
|
$25.000
|
$23.850
|
$26.180
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$10.000
|
$7.180
|
$7.400
|
$17.500
|
$7.500
|
$8.900
|
$6.560
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,400.000
|
$3.000
|
$2.510
|
$2.600
|
$3.500
|
$2.600
|
$2.600
|
$2.410
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,400.000
|
$1.000
|
$0.360
|
$0.370
|
$1.000
|
$0.350
|
$0.650
|
$0.360
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
750.000
|
$30.000
|
$30.000
|
$25.200
|
$15.000
|
$27.500
|
$22.900
|
$26.280
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$25.000
|
$22.150
|
$22.800
|
$26.600
|
$23.200
|
$22.800
|
$21.520
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,600.000
|
$1,497.440
|
$1,540.000
|
$1,999.000
|
$1,890.000
|
$2,130.000
|
$1,537.470
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$5.000
|
$1.540
|
$1.600
|
$5.000
|
$1.600
|
$1.060
|
$3.070
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$250.000
|
$128.210
|
$132.000
|
$150.000
|
$134.000
|
$89.700
|
$51.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,400.000
|
$2,815.390
|
$2,900.000
|
$2,845.000
|
$2,950.000
|
$2,850.000
|
$2,459.940
|
|
|
WIRE FENCE (TY A)
|
LF
|
200.000
|
$15.000
|
$25.000
|
$14.800
|
$12.000
|
$16.000
|
$31.650
|
$30.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$400.000
|
$517.100
|
$533.000
|
$500.000
|
$375.000
|
$500.000
|
$256.240
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$150.000
|
$102.570
|
$106.000
|
$200.000
|
$54.000
|
$240.000
|
$102.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$25.000
|
$12.310
|
$12.700
|
$15.000
|
$10.500
|
$26.400
|
$2.560
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
2.000
|
$65.000
|
$46.710
|
$48.200
|
$51.000
|
$53.000
|
$80.000
|
$19.880
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$50.000
|
$16.150
|
$16.700
|
$20.000
|
$22.000
|
$26.400
|
$4.870
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,660.000
|
$1.000
|
$0.760
|
$0.850
|
$0.750
|
$0.800
|
$0.840
|
$0.820
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,800.000
|
$2.000
|
$1.010
|
$0.850
|
$1.000
|
$0.800
|
$0.840
|
$0.820
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,760.000
|
$1.000
|
$0.760
|
$0.850
|
$0.750
|
$0.800
|
$0.840
|
$0.820
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
147.000
|
$1.500
|
$1.010
|
$1.450
|
$2.000
|
$1.000
|
$6.450
|
$1.800
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,660.000
|
$1.000
|
$1.010
|
$0.850
|
$1.000
|
$0.900
|
$0.840
|
$0.820
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,800.000
|
$2.000
|
$1.520
|
$0.850
|
$1.500
|
$0.850
|
$0.840
|
$0.820
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,760.000
|
$1.000
|
$1.260
|
$0.850
|
$1.250
|
$0.900
|
$0.840
|
$0.820
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
58.000
|
$5.000
|
$50.510
|
$5.300
|
$50.000
|
$5.000
|
$5.300
|
$5.120
|
|
|
NO. OF WORKING DAYS
|
$/D
|
5,000.000
|
$240.000
|
$176.000
|
$185.000
|
$205.000
|
$210.000
|
$220.000
|
$220.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$8,697.590
|
$8,990.000
|
$17,000.000
|
$8,600.000
|
$15,230.000
|
$6,662.350
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$500.000
|
$500.000
|
$458.000
|
$300.000
|
$350.000
|
$913.000
|
$256.240
|
|
Totals: |
$2,768,895.500
|
$2,535,859.930
|
$2,547,023.950
|
$2,684,448.340
|
$2,738,304.300
|
$2,782,867.625
|
$2,993,985.115
|