PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
72.000
|
$1,000.000
|
$583.000
|
$1,000.000
|
$1,100.000
|
$965.000
|
$850.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
10,490.000
|
$8.000
|
$7.060
|
$5.560
|
$4.800
|
$8.000
|
$31.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
1,931.000
|
$6.000
|
$13.870
|
$9.910
|
$8.450
|
$20.550
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,266.000
|
$9.000
|
$9.410
|
$13.170
|
$8.450
|
$15.300
|
$21.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
18,756.000
|
$9.490
|
$9.620
|
$9.630
|
$25.500
|
$15.800
|
$25.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
819.000
|
$37.080
|
$109.920
|
$28.250
|
$74.500
|
$105.000
|
$100.000
|
|
|
BLADING
|
STA
|
32.000
|
$150.000
|
$181.790
|
$600.000
|
$350.000
|
$310.000
|
$300.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
26.340
|
$624.310
|
$530.000
|
$578.870
|
$530.000
|
$525.000
|
$500.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
16.890
|
$623.070
|
$514.100
|
$561.500
|
$515.000
|
$510.000
|
$485.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
526.000
|
$1.400
|
$2.650
|
$2.890
|
$2.650
|
$2.650
|
$2.500
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
|
SY
|
81,091.000
|
$18.000
|
$23.900
|
$21.620
|
$16.500
|
$17.950
|
$27.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
|
SY
|
14,780.000
|
$50.000
|
$30.750
|
$28.080
|
$23.500
|
$28.500
|
$32.000
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
19,709.000
|
$16.500
|
$16.720
|
$5.690
|
$5.550
|
$2.900
|
$8.000
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
19,605.000
|
$15.000
|
$18.020
|
$7.020
|
$8.200
|
$13.550
|
$10.000
|
|
|
CEMENT
|
TON
|
1,036.000
|
$198.730
|
$195.960
|
$212.630
|
$195.000
|
$180.000
|
$200.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
95,871.000
|
$2.550
|
$2.750
|
$2.000
|
$4.550
|
$2.050
|
$7.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
23,970.000
|
$3.950
|
$4.170
|
$4.600
|
$4.000
|
$4.100
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
16,056.000
|
$4.500
|
$3.360
|
$5.060
|
$4.250
|
$3.900
|
$6.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
36,431.000
|
$3.000
|
$3.610
|
$3.520
|
$4.200
|
$3.900
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
869.000
|
$150.000
|
$172.350
|
$136.920
|
$170.000
|
$130.000
|
$177.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,174.000
|
$1.750
|
$7.920
|
$6.100
|
$4.800
|
$8.850
|
$25.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
13,444.000
|
$1.700
|
$1.530
|
$1.380
|
$2.100
|
$2.150
|
$13.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
14,048.000
|
$2.880
|
$2.800
|
$2.450
|
$3.700
|
$5.100
|
$13.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
224.000
|
$475.000
|
$658.890
|
$694.640
|
$640.000
|
$625.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$575.000
|
$686.340
|
$723.590
|
$665.000
|
$790.000
|
$750.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
86.000
|
$575.000
|
$658.890
|
$694.640
|
$640.000
|
$775.000
|
$800.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$600.000
|
$741.250
|
$781.470
|
$720.000
|
$875.000
|
$1,700.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
7.000
|
$1,300.000
|
$960.880
|
$1,013.020
|
$930.000
|
$1,060.000
|
$3,900.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
104.000
|
$80.000
|
$164.720
|
$160.000
|
$160.000
|
$102.000
|
$205.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$28,703.860
|
$18,668.470
|
$19,000.000
|
$18,000.000
|
$12,500.000
|
$37,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
|
EA
|
7.000
|
$7,000.000
|
$7,137.950
|
$7,525.290
|
$6,900.000
|
$8,600.000
|
$13,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$10,816.740
|
$11,403.700
|
$10,500.000
|
$8,700.000
|
$21,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,251.050
|
$2,196.300
|
$2,315.470
|
$2,100.000
|
$2,800.000
|
$3,400.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,200.000
|
$1,098.150
|
$1,157.740
|
$1,100.000
|
$665.000
|
$2,400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
306.000
|
$22.000
|
$16.470
|
$17.370
|
$16.000
|
$45.000
|
$16.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,200,000.000
|
$500,000.000
|
$1,757,024.000
|
$1,400,000.000
|
$1,763,000.000
|
$2,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$14,000.000
|
$8,372.530
|
$20,000.000
|
$17,000.000
|
$16,000.000
|
$20,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,380.000
|
$4.250
|
$2.760
|
$3.010
|
$2.750
|
$7.900
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,380.000
|
$1.500
|
$1.060
|
$1.160
|
$1.050
|
$3.350
|
$4.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
101.000
|
$100.000
|
$135.720
|
$150.000
|
$115.000
|
$143.000
|
$350.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,531.000
|
$45.000
|
$42.150
|
$100.000
|
$49.500
|
$91.000
|
$35.000
|
|
|
TURNOUTS (ACP)
|
SY
|
152.000
|
$150.000
|
$75.130
|
$175.000
|
$78.000
|
$55.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
131,616.000
|
$0.190
|
$0.150
|
$0.210
|
$0.110
|
$0.300
|
$0.400
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
66,276.000
|
$0.270
|
$0.150
|
$0.210
|
$0.130
|
$0.300
|
$0.400
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,150.000
|
$26.240
|
$30.210
|
$33.000
|
$30.500
|
$39.000
|
$38.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,970.000
|
$4.670
|
$2.120
|
$2.320
|
$2.150
|
$3.200
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$2,832.960
|
$3,047.500
|
$3,328.490
|
$3,100.000
|
$3,850.000
|
$3,650.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$431.900
|
$212.000
|
$231.550
|
$215.000
|
$320.000
|
$300.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
12.000
|
$265.000
|
$254.400
|
$277.860
|
$255.000
|
$350.000
|
$325.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
9.000
|
$300.000
|
$296.800
|
$324.170
|
$300.000
|
$395.000
|
$375.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
5.000
|
$525.000
|
$678.400
|
$740.950
|
$680.000
|
$320.000
|
$300.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
28.000
|
$700.000
|
$763.200
|
$833.570
|
$765.000
|
$860.000
|
$815.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
64.000
|
$890.000
|
$833.160
|
$909.980
|
$835.000
|
$1,000.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$950.000
|
$975.200
|
$1,065.120
|
$980.000
|
$1,100.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$1,200.000
|
$1,166.000
|
$1,273.510
|
$1,200.000
|
$1,260.000
|
$1,195.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$630.000
|
$614.800
|
$671.490
|
$615.000
|
$650.000
|
$615.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
91.000
|
$120.000
|
$106.000
|
$115.770
|
$105.000
|
$105.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
59.000
|
$18.000
|
$26.500
|
$28.940
|
$26.500
|
$11.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
65.000
|
$35.000
|
$36.040
|
$39.360
|
$36.000
|
$37.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND(BR)
|
EA
|
14.000
|
$100.000
|
$116.600
|
$127.350
|
$115.000
|
$130.000
|
$120.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$130.000
|
$116.600
|
$127.350
|
$115.000
|
$130.000
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
11,119.000
|
$0.300
|
$0.530
|
$0.150
|
$0.140
|
$0.530
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
95,308.000
|
$0.250
|
$0.530
|
$0.150
|
$0.140
|
$0.530
|
$0.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
2,088.000
|
$0.500
|
$1.060
|
$0.980
|
$0.900
|
$1.060
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,210.000
|
$0.800
|
$1.060
|
$0.980
|
$0.900
|
$1.060
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
160.000
|
$9.000
|
$10.600
|
$13.890
|
$13.000
|
$10.550
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$150.000
|
$212.000
|
$231.550
|
$215.000
|
$211.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
8.000
|
$475.000
|
$344.500
|
$445.730
|
$410.000
|
$345.000
|
$325.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$250.000
|
$265.000
|
$329.950
|
$305.000
|
$265.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
536.000
|
$3.000
|
$3.710
|
$3.590
|
$3.300
|
$3.700
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,086.000
|
$2.750
|
$3.710
|
$3.590
|
$3.300
|
$3.700
|
$3.500
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
15,819.000
|
$120.000
|
$95.770
|
$96.890
|
$110.000
|
$108.000
|
$125.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
72,701.000
|
$130.000
|
$105.470
|
$109.520
|
$115.250
|
$109.000
|
$135.000
|
|
|
TACK COAT
|
GAL
|
52,617.000
|
$4.000
|
$4.260
|
$4.090
|
$4.800
|
$4.300
|
$4.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
103,694.000
|
$3.100
|
$4.490
|
$2.500
|
$2.900
|
$2.600
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$14,788.570
|
$20,000.000
|
$10,500.000
|
$22,500.000
|
$15,000.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
8,911.090
|
$0.500
|
$0.420
|
$0.560
|
$0.490
|
$0.420
|
$0.400
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
158,072.000
|
$0.500
|
$0.390
|
$0.520
|
$0.470
|
$0.390
|
$0.370
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
9,563.000
|
$0.550
|
$0.420
|
$0.560
|
$0.470
|
$0.420
|
$0.400
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
115,837.000
|
$0.550
|
$0.390
|
$0.520
|
$0.470
|
$0.390
|
$0.370
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$200.000
|
$414.070
|
$336.850
|
$215.000
|
$500.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$100.000
|
$85.410
|
$89.240
|
$96.000
|
$75.000
|
$95.000
|
|
Totals: |
$18,919,048.233
|
$16,536,378.967
|
$17,638,977.141
|
$17,669,922.944
|
$17,836,167.718
|
$23,042,384.916
|