REMOVING CONC (RIPRAP)
|
SY
|
121.000
|
$25.000
|
$18.000
|
$49.500
|
$10.000
|
$31.500
|
$23.820
|
$20.000
|
$47.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
85.000
|
$55.000
|
$20.000
|
$22.500
|
$20.000
|
$31.500
|
$29.780
|
$20.000
|
$75.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
25.000
|
$40.000
|
$275.000
|
$32.550
|
$20.000
|
$315.000
|
$178.670
|
$80.000
|
$179.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
550.000
|
$22.000
|
$20.000
|
$13.250
|
$10.000
|
$15.750
|
$13.170
|
$40.000
|
$29.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
795.000
|
$55.000
|
$25.000
|
$46.500
|
$65.000
|
$52.500
|
$69.280
|
$50.000
|
$122.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
7,170.000
|
$0.180
|
$0.200
|
$0.100
|
$0.120
|
$0.840
|
$0.160
|
$1.500
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
7,170.000
|
$0.150
|
$0.200
|
$0.100
|
$0.130
|
$0.800
|
$0.180
|
$1.500
|
$0.150
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
14,340.000
|
$2.250
|
$0.550
|
$0.100
|
$0.480
|
$1.250
|
$0.490
|
$1.500
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
23.000
|
$130.000
|
$5.000
|
$60.000
|
$200.000
|
$157.500
|
$178.670
|
$250.000
|
$135.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
19.000
|
$290.000
|
$275.000
|
$395.000
|
$300.000
|
$630.000
|
$238.230
|
$350.000
|
$420.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,073.000
|
$350.000
|
$660.000
|
$482.000
|
$540.000
|
$735.000
|
$490.630
|
$950.000
|
$500.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$2,000.000
|
$1,000.000
|
$2,450.000
|
$2,000.000
|
$1,365.000
|
$5,955.730
|
$1,500.000
|
$2,100.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
9.000
|
$60.000
|
$1,000.000
|
$271.000
|
$300.000
|
$1,575.000
|
$833.800
|
$500.000
|
$1,000.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
9.000
|
$100.000
|
$400.000
|
$217.000
|
$120.000
|
$1,155.000
|
$1,786.720
|
$1,000.000
|
$1,005.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
2.000
|
$250.000
|
$800.000
|
$211.000
|
$500.000
|
$4,725.000
|
$3,573.440
|
$1,000.000
|
$2,211.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
34.000
|
$250.000
|
$350.000
|
$333.000
|
$200.000
|
$1,155.000
|
$1,191.150
|
$500.000
|
$2,300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
40.000
|
$235.000
|
$400.000
|
$231.000
|
$300.000
|
$945.000
|
$1,250.700
|
$500.000
|
$2,200.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
12.000
|
$175.000
|
$400.000
|
$266.000
|
$200.000
|
$525.000
|
$893.360
|
$500.000
|
$1,435.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$700.000
|
$1,500.000
|
$614.500
|
$750.000
|
$1,575.000
|
$893.360
|
$650.000
|
$1,100.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
33.000
|
$550.000
|
$1,000.000
|
$702.020
|
$750.000
|
$735.000
|
$638.410
|
$850.000
|
$1,200.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
39.250
|
$210.000
|
$200.000
|
$195.500
|
$150.000
|
$525.000
|
$297.790
|
$185.000
|
$220.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
14.000
|
$210.000
|
$250.000
|
$196.500
|
$200.000
|
$525.000
|
$357.340
|
$200.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
974.000
|
$650.000
|
$600.000
|
$500.000
|
$500.000
|
$735.000
|
$438.510
|
$500.000
|
$600.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
3,674.000
|
$22.000
|
$45.000
|
$23.520
|
$33.000
|
$6.000
|
$57.020
|
$50.000
|
$69.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
2,776.000
|
$18.750
|
$25.000
|
$38.000
|
$35.000
|
$25.000
|
$64.090
|
$60.000
|
$95.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
713.000
|
$75.000
|
$80.000
|
$132.000
|
$60.000
|
$95.000
|
$95.230
|
$50.000
|
$120.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
8,208.000
|
$220.000
|
$130.000
|
$186.000
|
$180.000
|
$136.500
|
$168.880
|
$135.000
|
$276.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
49.000
|
$100.000
|
$100.000
|
$132.000
|
$150.000
|
$157.500
|
$182.990
|
$125.000
|
$180.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
22.000
|
$150.000
|
$200.000
|
$186.000
|
$300.000
|
$252.000
|
$349.120
|
$150.000
|
$225.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
9.000
|
$1,600.000
|
$1,200.000
|
$1,946.000
|
$3,500.000
|
$2,100.000
|
$2,271.120
|
$3,500.000
|
$3,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$5,000.000
|
$1,200.000
|
$3,144.000
|
$5,500.000
|
$3,150.000
|
$4,714.960
|
$4,500.000
|
$5,000.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
3.000
|
$600.000
|
$1,000.000
|
$1,223.000
|
$1,000.000
|
$1,155.000
|
$3,573.440
|
$1,500.000
|
$5,115.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$1,800.000
|
$1,000.000
|
$3,320.000
|
$1,500.000
|
$945.000
|
$1,606.860
|
$1,500.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
11.000
|
$375.000
|
$500.000
|
$1,549.000
|
$700.000
|
$630.000
|
$595.570
|
$500.000
|
$12,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
71.000
|
$29.000
|
$125.000
|
$35.500
|
$30.000
|
$73.500
|
$35.730
|
$50.000
|
$65.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$576,943.160
|
$500,000.000
|
$217,500.000
|
$610,000.000
|
$675,000.000
|
$696,820.900
|
$700,000.000
|
$736,574.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$6,500.000
|
$2,750.000
|
$6,450.000
|
$15,000.000
|
$21,000.000
|
$14,293.760
|
$8,500.000
|
$17,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,370.000
|
$6.000
|
$3.250
|
$1.000
|
$4.000
|
$4.200
|
$3.100
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,370.000
|
$2.500
|
$1.000
|
$1.000
|
$1.000
|
$0.550
|
$1.190
|
$2.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,845.000
|
$65.000
|
$80.000
|
$95.000
|
$70.000
|
$100.000
|
$76.620
|
$95.000
|
$115.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
21,940.000
|
$7.500
|
$16.750
|
$11.500
|
$13.000
|
$2.000
|
$17.590
|
$30.000
|
$14.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,845.000
|
$10.000
|
$8.000
|
$13.000
|
$25.000
|
$20.000
|
$22.970
|
$30.000
|
$18.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
7,330.000
|
$95.000
|
$105.000
|
$111.000
|
$75.000
|
$105.000
|
$88.810
|
$155.000
|
$175.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
180.000
|
$250.000
|
$175.000
|
$241.000
|
$350.000
|
$420.000
|
$225.220
|
$185.000
|
$320.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
85.000
|
$140.000
|
$140.000
|
$104.000
|
$130.000
|
$210.000
|
$197.610
|
$85.000
|
$285.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
30.000
|
$135.000
|
$400.000
|
$78.000
|
$100.000
|
$210.000
|
$578.060
|
$45.000
|
$210.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
14,625.000
|
$33.000
|
$29.000
|
$26.000
|
$30.000
|
$28.000
|
$35.180
|
$30.000
|
$36.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
80.000
|
$2,200.000
|
$2,325.000
|
$2,100.000
|
$2,100.000
|
$3,500.000
|
$3,370.680
|
$2,500.000
|
$3,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
43.000
|
$1,750.000
|
$1,600.000
|
$1,350.000
|
$1,350.000
|
$1,600.000
|
$2,453.700
|
$1,850.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
13,275.000
|
$3.000
|
$1.500
|
$1.000
|
$2.000
|
$2.000
|
$2.240
|
$3.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
48.000
|
$250.000
|
$200.000
|
$1.000
|
$125.000
|
$240.000
|
$256.360
|
$500.000
|
$167.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
52.000
|
$3,500.000
|
$3,200.000
|
$2,900.000
|
$3,000.000
|
$3,100.000
|
$4,102.070
|
$3,000.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
43.000
|
$300.000
|
$500.000
|
$250.000
|
$250.000
|
$240.000
|
$335.790
|
$1,500.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
44.000
|
$1,250.000
|
$1,000.000
|
$1,665.000
|
$1,500.000
|
$1,155.000
|
$1,411.240
|
$5,000.000
|
$2,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,000.000
|
$1,300.000
|
$1,500.000
|
$840.000
|
$1,195.510
|
$2,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$27,000.000
|
$30,000.000
|
$40,000.000
|
$31,000.000
|
$31,500.000
|
$37,783.180
|
$30,000.000
|
$35,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$12,500.000
|
$9,956.000
|
$11,000.000
|
$13,650.000
|
$4,613.680
|
$17,500.000
|
$12,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
576.000
|
$35.000
|
$10.000
|
$12.000
|
$22.000
|
$20.000
|
$29.780
|
$50.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
328.000
|
$81.000
|
$12.500
|
$12.000
|
$22.000
|
$25.000
|
$35.730
|
$50.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
576.000
|
$6.000
|
$10.000
|
$12.000
|
$22.000
|
$20.000
|
$29.780
|
$50.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
46.000
|
$85.000
|
$75.000
|
$35.000
|
$100.000
|
$75.000
|
$83.380
|
$50.000
|
$130.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
4,432.000
|
$4.000
|
$4.250
|
$3.350
|
$8.000
|
$5.250
|
$3.870
|
$6.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
4,432.000
|
$5.000
|
$4.250
|
$3.350
|
$8.000
|
$5.250
|
$3.870
|
$6.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
864.000
|
$4.250
|
$4.500
|
$3.650
|
$8.000
|
$6.300
|
$4.170
|
$6.000
|
$5.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
13,240.000
|
$0.200
|
$1.000
|
$0.850
|
$1.000
|
$0.630
|
$0.890
|
$1.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,240.000
|
$0.850
|
$0.900
|
$0.500
|
$1.000
|
$1.050
|
$0.600
|
$1.500
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,500.000
|
$8,000.000
|
$9,000.000
|
$15,000.000
|
$21,000.000
|
$12,658.340
|
$16,500.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
42.000
|
$225.000
|
$200.000
|
$2,955.000
|
$400.000
|
$250.000
|
$187.560
|
$250.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$130.000
|
$200.000
|
$1,955.000
|
$750.000
|
$750.000
|
$336.660
|
$850.000
|
$525.000
|
|
Totals: |
$6,383,894.760
|
$5,981,039.000
|
$6,021,544.765
|
$6,374,309.200
|
$6,767,447.450
|
$6,994,991.028
|
$7,929,899.250
|
$9,377,954.500
|