PREPARING ROW
|
STA
|
58.000
|
$2,016.890
|
$3,150.000
|
$1,540.000
|
$1,500.000
|
$1,000.000
|
$3,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
3,417.000
|
$4.770
|
$10.500
|
$11.000
|
$15.000
|
$12.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
1,666.000
|
$5.190
|
$10.500
|
$14.000
|
$22.000
|
$12.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,553.000
|
$7.030
|
$9.450
|
$10.000
|
$7.000
|
$8.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,042.000
|
$9.950
|
$17.850
|
$2.500
|
$6.000
|
$15.000
|
$25.000
|
|
|
BACKFILL (TY A)
|
STA
|
25.000
|
$134.590
|
$630.000
|
$2,800.000
|
$300.000
|
$500.000
|
$450.000
|
|
|
BLADING
|
HR
|
20.000
|
$129.600
|
$210.000
|
$130.000
|
$150.000
|
$300.000
|
$150.000
|
|
|
BLOCK SODDING
|
SY
|
49,708.000
|
$2.990
|
$1.650
|
$2.700
|
$2.020
|
$4.000
|
$5.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
49,708.000
|
$0.330
|
$0.040
|
$0.290
|
$0.200
|
$0.250
|
$0.500
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
49,708.000
|
$0.260
|
$0.030
|
$0.290
|
$0.310
|
$0.200
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
765.000
|
$10.460
|
$25.000
|
$34.000
|
$29.000
|
$15.000
|
$50.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
183.000
|
$153.390
|
$183.000
|
$170.000
|
$200.000
|
$250.000
|
$195.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
13,975.000
|
$2.450
|
$3.150
|
$2.800
|
$4.000
|
$4.000
|
$4.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
4,547.000
|
$83.220
|
$84.000
|
$81.750
|
$95.000
|
$90.000
|
$105.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG64-22
|
TON
|
1,939.000
|
$105.340
|
$99.000
|
$88.000
|
$99.000
|
$90.000
|
$140.000
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
188.000
|
$65.000
|
$110.000
|
$110.000
|
$109.000
|
$180.000
|
$210.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
2,687.000
|
$2.110
|
$6.600
|
$4.000
|
$7.000
|
$4.000
|
$8.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
6,443.000
|
$55.890
|
$73.500
|
$88.000
|
$93.000
|
$95.000
|
$80.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
84.000
|
$157.350
|
$132.000
|
$125.000
|
$125.000
|
$230.000
|
$200.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
78.000
|
$178.690
|
$168.000
|
$160.000
|
$180.000
|
$250.000
|
$285.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
21.050
|
$400.000
|
$420.000
|
$350.000
|
$550.000
|
$400.000
|
$650.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
48.000
|
$364.390
|
$263.000
|
$400.000
|
$450.000
|
$700.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
458.000
|
$48.080
|
$50.000
|
$45.000
|
$69.000
|
$45.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
32.000
|
$68.000
|
$100.000
|
$82.000
|
$210.000
|
$55.000
|
$105.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,000.000
|
$4,800.000
|
$2,600.000
|
$5,900.000
|
$5,000.000
|
$500.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
3.000
|
$4,000.000
|
$3,750.000
|
$3,700.000
|
$4,500.000
|
$5,000.000
|
$6,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$5,333.900
|
$10,550.000
|
$4,350.000
|
$13,000.000
|
$5,000.000
|
$12,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$6,565.000
|
$9,450.000
|
$5,400.000
|
$17,000.000
|
$7,000.000
|
$14,000.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$1,600.000
|
$1,500.000
|
$1,150.000
|
$1,500.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$400.030
|
$275.000
|
$800.000
|
$300.000
|
$1,000.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
156.000
|
$18.500
|
$15.000
|
$31.000
|
$25.000
|
$15.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$151,729.660
|
$216,000.000
|
$228,000.000
|
$240,000.000
|
$250,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$4,106.510
|
$9,450.000
|
$1,500.000
|
$5,500.000
|
$8,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
64.000
|
$26.400
|
$40.000
|
$29.000
|
$50.000
|
$55.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
765.000
|
$2.650
|
$2.000
|
$3.330
|
$2.300
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
765.000
|
$0.730
|
$0.250
|
$1.000
|
$0.600
|
$1.000
|
$2.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
2,310.000
|
$20.000
|
$5.250
|
$13.000
|
$5.000
|
$30.000
|
$25.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,530.000
|
$5.170
|
$3.150
|
$9.500
|
$4.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
2,310.000
|
$5.540
|
$5.250
|
$10.000
|
$5.000
|
$30.000
|
$20.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$5,000.000
|
$2,100.000
|
$5,000.000
|
$2,900.000
|
$5,000.000
|
$6,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,065.800
|
$1,575.000
|
$4,700.000
|
$2,900.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,279.710
|
$525.000
|
$800.000
|
$900.000
|
$2,000.000
|
$2,500.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
6.000
|
$3,296.000
|
$525.000
|
$500.000
|
$1,900.000
|
$2,500.000
|
$1,500.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
6.000
|
$854.940
|
$840.000
|
$800.000
|
$550.000
|
$700.000
|
$2,500.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
7.000
|
$3,309.600
|
$3,675.000
|
$3,500.000
|
$3,500.000
|
$4,000.000
|
$3,500.000
|
|
|
CONDT (RM) (3") (BORE)
|
LF
|
140.000
|
$32.840
|
$36.750
|
$35.000
|
$35.000
|
$50.000
|
$100.000
|
|
|
DCT CBL (3 NO.8) (2 INSULATED 1 BARE)
|
LF
|
4,385.000
|
$5.200
|
$3.680
|
$3.500
|
$13.000
|
$25.000
|
$5.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
6.000
|
$948.520
|
$997.500
|
$950.000
|
$950.000
|
$1,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$552.210
|
$446.250
|
$650.000
|
$500.000
|
$600.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$552.210
|
$551.250
|
$750.000
|
$600.000
|
$600.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$502.860
|
$761.250
|
$1,100.000
|
$800.000
|
$600.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$60.240
|
$52.500
|
$150.000
|
$55.000
|
$125.000
|
$250.000
|
|
|
RELOCATE LRSA
|
EA
|
4.000
|
$4,573.410
|
$1,150.000
|
$1,000.000
|
$2,500.000
|
$7,000.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
12.000
|
$93.440
|
$35.700
|
$125.000
|
$40.000
|
$125.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
5.000
|
$62.420
|
$36.750
|
$125.000
|
$40.000
|
$125.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,230.000
|
$0.640
|
$1.050
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,580.000
|
$0.480
|
$1.050
|
$0.850
|
$0.900
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,452.000
|
$0.730
|
$1.370
|
$2.000
|
$2.100
|
$1.400
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
300.000
|
$5.020
|
$5.250
|
$5.000
|
$5.500
|
$6.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
4.000
|
$56.320
|
$78.750
|
$125.000
|
$135.000
|
$100.000
|
$500.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,027.000
|
$0.600
|
$1.050
|
$0.850
|
$1.000
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
24.000
|
$0.950
|
$1.050
|
$3.000
|
$3.200
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,802.000
|
$0.470
|
$0.790
|
$1.200
|
$1.300
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
273.000
|
$3.080
|
$3.360
|
$2.850
|
$3.000
|
$4.000
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
953.000
|
$1.050
|
$3.360
|
$3.650
|
$4.000
|
$4.000
|
$6.000
|
|
REFL PAV MRK TY I (Y)4"(SLD)(090MIL)
|
LF
|
5,962.000
|
$2.000
|
$1.050
|
$0.610
|
$0.700
|
$1.100
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
26,502.000
|
$0.170
|
$0.160
|
$0.210
|
$0.220
|
$0.170
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,802.000
|
$0.160
|
$0.320
|
$0.340
|
$0.350
|
$0.330
|
$6.000
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,226.000
|
$0.520
|
$1.580
|
$1.000
|
$1.100
|
$1.700
|
$10.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
3,691.000
|
$1.270
|
$1.580
|
$1.350
|
$1.500
|
$1.700
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
6,033.000
|
$1.250
|
$1.580
|
$1.350
|
$1.500
|
$1.700
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
2,680.000
|
$1.250
|
$1.050
|
$0.670
|
$0.700
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
8,112.000
|
$0.500
|
$1.050
|
$0.610
|
$0.650
|
$1.100
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
380.000
|
$3.410
|
$5.250
|
$4.750
|
$5.000
|
$6.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,805.000
|
$0.660
|
$0.530
|
$0.750
|
$0.800
|
$0.550
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
579.000
|
$0.800
|
$0.790
|
$1.200
|
$1.300
|
$0.900
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
309.000
|
$1.890
|
$1.050
|
$1.500
|
$1.600
|
$1.100
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
26,502.000
|
$0.090
|
$0.110
|
$0.250
|
$0.280
|
$0.120
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,802.000
|
$0.110
|
$0.210
|
$0.500
|
$0.550
|
$0.220
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,226.000
|
$0.490
|
$0.320
|
$1.000
|
$1.100
|
$0.330
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,219.520
|
$6,300.000
|
$15,000.000
|
$7,500.000
|
$20,000.000
|
$11,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
149.000
|
$248.480
|
$315.000
|
$150.000
|
$140.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$39.230
|
$73.500
|
$110.000
|
$20.000
|
$30.000
|
$150.000
|
|
Totals: |
$2,059,519.970
|
$2,328,633.320
|
$2,343,605.580
|
$2,494,536.140
|
$2,864,878.910
|
$3,399,427.300
|