PREPARING ROW
|
STA
|
33.310
|
$3,000.000
|
$500.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$3,500.000
|
$6,320.000
|
$4,000.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
2.000
|
$3,100.000
|
$1,500.000
|
$3,000.000
|
$3,785.000
|
$3,300.000
|
$8,500.000
|
$5,000.000
|
$4,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
453.000
|
$25.000
|
$40.000
|
$40.000
|
$17.000
|
$28.000
|
$50.000
|
$40.000
|
$30.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
50.000
|
$15.000
|
$40.000
|
$50.000
|
$10.000
|
$51.000
|
$100.000
|
$40.000
|
$35.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
14.000
|
$20.000
|
$40.000
|
$40.000
|
$12.000
|
$49.000
|
$100.000
|
$50.000
|
$100.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
43.000
|
$35.000
|
$30.000
|
$40.000
|
$13.000
|
$55.000
|
$100.000
|
$50.000
|
$75.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
366.000
|
$30.000
|
$40.000
|
$100.000
|
$15.000
|
$75.000
|
$30.000
|
$30.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
294.000
|
$70.000
|
$60.000
|
$100.000
|
$10.000
|
$96.000
|
$60.000
|
$30.000
|
$125.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,771.000
|
$5.000
|
$30.000
|
$6.000
|
$10.000
|
$12.000
|
$10.000
|
$8.320
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
3,771.000
|
$7.000
|
$4.000
|
$10.000
|
$8.000
|
$7.000
|
$10.000
|
$6.840
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
582.000
|
$50.000
|
$4.000
|
$50.000
|
$70.000
|
$23.000
|
$20.000
|
$30.000
|
$5.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
731.000
|
$38.000
|
$60.000
|
$50.000
|
$50.000
|
$49.000
|
$25.000
|
$100.000
|
$60.000
|
|
|
ASPH (RC-250)
|
GAL
|
150.000
|
$10.000
|
$20.000
|
$15.000
|
$25.000
|
$73.000
|
$20.000
|
$135.680
|
$72.820
|
|
|
AGGR(TY-PB GR-1 SAC-A)
|
CY
|
6.000
|
$120.000
|
$300.000
|
$200.000
|
$2,500.000
|
$3,060.000
|
$1,500.000
|
$3,666.680
|
$3,036.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
|
SY
|
96.000
|
$200.000
|
$200.000
|
$200.000
|
$210.000
|
$214.000
|
$300.000
|
$600.000
|
$250.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$2,000.000
|
$1,600.000
|
$2,000.000
|
$2,000.000
|
$2,135.000
|
$2,000.000
|
$2,000.000
|
$5,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
3.800
|
$1,900.000
|
$2,500.000
|
$1,000.000
|
$1,200.000
|
$1,078.000
|
$2,000.000
|
$2,500.000
|
$4,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1.300
|
$750.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
$2,147.000
|
$850.000
|
$3,000.000
|
$4,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
8.600
|
$300.000
|
$350.000
|
$300.000
|
$300.000
|
$873.000
|
$185.000
|
$580.000
|
$750.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
109.000
|
$260.000
|
$250.000
|
$200.000
|
$300.000
|
$162.000
|
$200.000
|
$250.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
80.000
|
$105.000
|
$100.000
|
$60.000
|
$110.000
|
$266.000
|
$150.000
|
$80.000
|
$275.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
101.000
|
$120.000
|
$140.000
|
$150.000
|
$150.000
|
$279.000
|
$185.000
|
$115.000
|
$285.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
13.000
|
$270.000
|
$300.000
|
$300.000
|
$350.000
|
$520.000
|
$500.000
|
$250.000
|
$550.000
|
|
|
INLET (COMPL)(PAZD)(SL)(5FTX5FT)
|
EA
|
1.000
|
$6,700.000
|
$6,500.000
|
$10,000.000
|
$9,000.000
|
$14,300.000
|
$12,500.000
|
$10,000.000
|
$12,600.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$6,000.000
|
$8,000.000
|
$5,000.000
|
$12,500.000
|
$6,200.000
|
$3,200.000
|
$8,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,675.000
|
$2,000.000
|
$1,000.000
|
$2,800.000
|
$4,634.000
|
$1,850.000
|
$1,200.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,675.000
|
$2,000.000
|
$1,000.000
|
$2,800.000
|
$4,655.000
|
$1,850.000
|
$1,200.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$2,500.000
|
$3,000.000
|
$3,000.000
|
$4,784.000
|
$2,200.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$2,500.000
|
$3,000.000
|
$3,200.000
|
$5,309.000
|
$2,200.000
|
$2,000.000
|
$1,800.000
|
|
|
GRATE & FRAME
|
EA
|
10.000
|
$1,800.000
|
$3,000.000
|
$2,500.000
|
$4,000.000
|
$1,573.000
|
$12,500.000
|
$2,500.000
|
$3,000.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
3.000
|
$850.000
|
$500.000
|
$500.000
|
$1,000.000
|
$1,170.000
|
$2,500.000
|
$1,000.000
|
$3,150.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$2,300.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$3,062.000
|
$1,500.000
|
$1,000.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
121.000
|
$50.000
|
$10.000
|
$10.000
|
$30.000
|
$51.000
|
$50.000
|
$50.000
|
$75.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
18.000
|
$9.000
|
$10.000
|
$10.000
|
$5.000
|
$55.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$120,000.000
|
$110,000.000
|
$120,000.000
|
$130,000.000
|
$75,000.000
|
$150,000.000
|
$150,000.000
|
$183,300.400
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$3,000.000
|
$10,000.000
|
$2,500.000
|
$5,000.000
|
$8,500.000
|
$990.810
|
$21,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
77.000
|
$50.000
|
$50.000
|
$10.000
|
$90.000
|
$48.000
|
$30.000
|
$77.280
|
$92.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
77.000
|
$15.000
|
$10.000
|
$1.000
|
$10.000
|
$17.000
|
$15.000
|
$58.000
|
$46.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,409.000
|
$6.000
|
$10.000
|
$6.000
|
$5.000
|
$3.000
|
$4.000
|
$3.570
|
$3.450
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,409.000
|
$2.000
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
$2.000
|
$2.030
|
$1.730
|
|
|
CONC CURB (TY II)
|
LF
|
335.000
|
$30.000
|
$30.000
|
$50.000
|
$50.000
|
$49.000
|
$85.000
|
$50.000
|
$25.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
434.000
|
$110.000
|
$100.000
|
$140.000
|
$130.000
|
$121.000
|
$125.000
|
$130.000
|
$125.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
2,308.000
|
$130.000
|
$100.000
|
$120.000
|
$95.000
|
$136.000
|
$75.000
|
$130.000
|
$150.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
29.000
|
$200.000
|
$200.000
|
$120.000
|
$225.000
|
$127.000
|
$250.000
|
$150.000
|
$300.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
72.000
|
$200.000
|
$200.000
|
$120.000
|
$195.000
|
$180.000
|
$250.000
|
$150.000
|
$300.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
77.000
|
$200.000
|
$200.000
|
$120.000
|
$195.000
|
$199.000
|
$250.000
|
$150.000
|
$300.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
93.000
|
$200.000
|
$300.000
|
$120.000
|
$300.000
|
$125.000
|
$250.000
|
$150.000
|
$300.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
324.000
|
$250.000
|
$200.000
|
$120.000
|
$200.000
|
$590.000
|
$100.000
|
$220.000
|
$550.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
2.000
|
$400.000
|
$200.000
|
$500.000
|
$400.000
|
$604.000
|
$8,500.000
|
$324.500
|
$600.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
80.000
|
$80.000
|
$40.000
|
$50.000
|
$30.000
|
$30.000
|
$50.000
|
$121.100
|
$98.040
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
31.000
|
$800.000
|
$500.000
|
$800.000
|
$820.000
|
$654.000
|
$1,500.000
|
$976.740
|
$713.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
6.000
|
$650.000
|
$300.000
|
$100.000
|
$687.000
|
$571.000
|
$850.000
|
$1,785.130
|
$603.750
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$150.000
|
$200.000
|
$100.000
|
$145.000
|
$111.000
|
$250.000
|
$126.500
|
$172.500
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1.000
|
$400.000
|
$50.000
|
$500.000
|
$435.000
|
$277.000
|
$100.000
|
$379.500
|
$454.250
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$50.000
|
$20.000
|
$10.000
|
$19.000
|
$26.000
|
$100.000
|
$16.500
|
$28.750
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
377.000
|
$6.000
|
$8.000
|
$18.000
|
$7.000
|
$15.000
|
$10.000
|
$4.950
|
$16.040
|
|
|
PAVEMENT SEALER 24"
|
LF
|
377.000
|
$3.000
|
$8.000
|
$5.000
|
$3.000
|
$4.000
|
$10.000
|
$2.420
|
$4.030
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
8.000
|
$35.000
|
$60.000
|
$100.000
|
$51.000
|
$89.000
|
$250.000
|
$70.680
|
$92.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
8.000
|
$35.000
|
$60.000
|
$100.000
|
$53.000
|
$89.000
|
$250.000
|
$71.780
|
$92.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$350.000
|
$100.000
|
$400.000
|
$628.000
|
$349.000
|
$500.000
|
$407.280
|
$362.250
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
8.000
|
$350.000
|
$100.000
|
$400.000
|
$407.000
|
$327.000
|
$500.000
|
$291.760
|
$339.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
70.000
|
$2.000
|
$4.000
|
$2.000
|
$2.500
|
$1.000
|
$6.000
|
$6.030
|
$12.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$5.000
|
$10.000
|
$5.000
|
$3.500
|
$4.000
|
$10.000
|
$15.130
|
$37.800
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
377.000
|
$3.000
|
$6.000
|
$2.000
|
$1.000
|
$1.000
|
$10.000
|
$1.430
|
$1.150
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$50.000
|
$60.000
|
$100.000
|
$27.000
|
$55.000
|
$250.000
|
$55.280
|
$57.500
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
8.000
|
$50.000
|
$60.000
|
$100.000
|
$27.000
|
$55.000
|
$250.000
|
$55.280
|
$57.500
|
|
|
VEH SIG SEC (12")(LED)(YEL)(SOLAR)
|
EA
|
16.000
|
$300.000
|
$400.000
|
$400.000
|
$765.000
|
$188.000
|
$1,000.000
|
$562.100
|
$354.780
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$10,000.000
|
$8,500.000
|
$6,000.000
|
$14,705.000
|
$9,868.000
|
$12,500.000
|
$10,835.000
|
$11,356.250
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
4.000
|
$700.000
|
$600.000
|
$2,000.000
|
$1,405.000
|
$721.000
|
$1,250.000
|
$1,034.000
|
$1,281.100
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$4,200.000
|
$4,500.000
|
$5,000.000
|
$6,400.000
|
$3,437.000
|
$8,500.000
|
$4,700.360
|
$5,140.500
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
210.000
|
$30.000
|
$30.000
|
$40.000
|
$55.000
|
$51.000
|
$60.000
|
$60.800
|
$50.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
|
TON
|
56.000
|
$160.000
|
$200.000
|
$200.000
|
$300.000
|
$493.000
|
$500.000
|
$561.800
|
$500.000
|
|
|
FIXED BOLLARDS
|
EA
|
33.000
|
$1,400.000
|
$1,600.000
|
$300.000
|
$2,700.000
|
$746.000
|
$1,000.000
|
$1,265.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$10,000.000
|
$5,000.000
|
$11,000.000
|
$13,305.000
|
$16,500.000
|
$20,000.000
|
$9,450.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$200.000
|
$300.000
|
$300.000
|
$275.000
|
$250.000
|
$250.000
|
$350.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$250.000
|
$300.000
|
$400.000
|
$350.000
|
$850.000
|
$550.000
|
$300.000
|
$750.000
|
|
Totals: |
$1,323,468.000
|
$1,226,270.000
|
$1,244,580.000
|
$1,381,472.000
|
$1,518,008.300
|
$1,552,085.000
|
$1,638,238.440
|
$1,887,622.990
|