PREPARING ROW
|
STA
|
251.000
|
$1,250.000
|
$997.000
|
$1,159.400
|
$1,504.000
|
$1,454.000
|
$1,850.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
193.000
|
$30.000
|
$29.310
|
$13.200
|
$12.000
|
$14.000
|
$50.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
31.000
|
$30.000
|
$28.600
|
$130.410
|
$175.000
|
$400.000
|
$100.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
251.000
|
$300.000
|
$700.000
|
$605.420
|
$420.000
|
$1,470.000
|
$550.000
|
|
|
EMBANK (VEH)(OC)(TY B)
|
CY
|
480.000
|
$40.000
|
$45.000
|
$51.720
|
$50.000
|
$68.000
|
$50.000
|
|
|
BACKFILL (TY A)
|
STA
|
251.000
|
$280.000
|
$270.000
|
$275.720
|
$501.090
|
$660.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
251.000
|
$300.000
|
$300.000
|
$145.300
|
$350.000
|
$320.000
|
$250.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
41,849.000
|
$0.120
|
$0.350
|
$0.140
|
$0.180
|
$0.100
|
$0.500
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
41,849.000
|
$0.120
|
$0.350
|
$0.140
|
$0.180
|
$0.150
|
$0.500
|
|
|
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
|
SY
|
83,697.000
|
$0.400
|
$0.790
|
$0.440
|
$0.470
|
$0.250
|
$1.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
502.000
|
$30.000
|
$40.000
|
$59.400
|
$5.000
|
$53.000
|
$20.000
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
|
SY
|
250.000
|
$7.000
|
$40.000
|
$4.400
|
$8.000
|
$3.000
|
$10.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
33,367.000
|
$5.000
|
$12.500
|
$5.010
|
$5.510
|
$6.620
|
$5.000
|
|
|
AGGR (TY-PB, GR-3)(SAC-A)
|
CY
|
690.000
|
$140.000
|
$159.000
|
$192.500
|
$263.260
|
$430.000
|
$250.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,932.000
|
$135.000
|
$147.000
|
$212.890
|
$191.400
|
$150.000
|
$165.000
|
|
|
TACK COAT
|
GAL
|
1,600.000
|
$5.000
|
$5.030
|
$9.790
|
$6.970
|
$9.000
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
5,000.000
|
$85.000
|
$70.000
|
$75.450
|
$127.800
|
$218.750
|
$80.000
|
|
|
CUT & RESTORING PAV
|
SY
|
318.000
|
$265.000
|
$200.000
|
$192.640
|
$100.000
|
$20.000
|
$200.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
24.000
|
$150.000
|
$175.500
|
$176.110
|
$100.000
|
$100.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
85.000
|
$250.000
|
$450.000
|
$275.000
|
$250.000
|
$295.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
81.000
|
$20.000
|
$10.000
|
$16.500
|
$15.000
|
$9.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,280.000
|
$30.000
|
$40.000
|
$110.000
|
$10.000
|
$75.000
|
$65.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
4.000
|
$175.000
|
$200.000
|
$220.000
|
$1,000.000
|
$4,000.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
169.000
|
$600.000
|
$700.000
|
$687.500
|
$625.000
|
$550.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
780.000
|
$250.000
|
$205.000
|
$212.300
|
$290.630
|
$250.000
|
$165.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
244.000
|
$125.000
|
$149.500
|
$100.100
|
$109.880
|
$142.920
|
$165.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
51.000
|
$300.000
|
$406.000
|
$357.500
|
$325.000
|
$400.000
|
$1,000.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
25.000
|
$800.000
|
$886.765
|
$687.500
|
$625.000
|
$450.000
|
$1,000.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
11.000
|
$1,000.000
|
$1,072.060
|
$797.500
|
$725.000
|
$500.000
|
$1,250.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
16.000
|
$1,400.000
|
$1,250.000
|
$1,237.500
|
$1,125.000
|
$600.000
|
$2,000.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
9.000
|
$1,600.000
|
$1,500.000
|
$1,292.500
|
$1,175.000
|
$800.000
|
$2,500.000
|
|
|
CONC BOX CULV (6 FT X 3.5 FT)(EXTEND)
|
LF
|
11.000
|
$1,100.000
|
$1,400.000
|
$1,210.000
|
$1,100.000
|
$625.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
435.000
|
$60.000
|
$100.000
|
$55.000
|
$50.000
|
$55.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
60.000
|
$85.000
|
$127.300
|
$99.000
|
$90.000
|
$75.000
|
$125.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
68.000
|
$100.000
|
$138.800
|
$121.000
|
$110.000
|
$95.000
|
$250.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
52.000
|
$140.000
|
$206.175
|
$181.500
|
$165.000
|
$250.000
|
$300.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$10,500.000
|
$25,000.000
|
$11,000.000
|
$10,000.000
|
$8,750.000
|
$8,500.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
3.000
|
$11,700.000
|
$11,666.670
|
$13,200.000
|
$12,000.000
|
$9,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$12,250.000
|
$14,785.000
|
$16,500.000
|
$15,000.000
|
$12,500.000
|
$16,500.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
6.000
|
$14,000.000
|
$17,125.000
|
$22,000.000
|
$20,000.000
|
$14,000.000
|
$18,500.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$22,000.000
|
$21,500.000
|
$35,200.000
|
$32,000.000
|
$18,950.000
|
$25,000.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$15,000.000
|
$15,890.095
|
$9,350.000
|
$8,500.000
|
$9,950.000
|
$15,000.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
2.000
|
$15,500.000
|
$15,500.000
|
$13,200.000
|
$12,000.000
|
$11,750.000
|
$16,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$800.000
|
$1,724.080
|
$907.500
|
$825.000
|
$1,100.000
|
$1,850.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$1,050.000
|
$1,743.975
|
$907.500
|
$825.000
|
$1,150.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$3,375.000
|
$1,650.000
|
$1,500.000
|
$1,500.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,600.000
|
$2,137.850
|
$1,650.000
|
$1,500.000
|
$1,550.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,600.000
|
$3,080.000
|
$2,800.000
|
$1,950.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$3,600.000
|
$1,980.000
|
$1,800.000
|
$1,750.000
|
$3,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,000.000
|
$3,946.350
|
$4,620.000
|
$4,200.000
|
$2,200.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$5,200.000
|
$7,678.300
|
$7,700.000
|
$7,000.000
|
$5,000.000
|
$5,000.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
8.000
|
$50.000
|
$69.995
|
$33.000
|
$30.000
|
$90.000
|
$200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$2,800.000
|
$5,000.000
|
$1,320.000
|
$1,200.000
|
$2,500.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
78.000
|
$350.000
|
$782.500
|
$275.000
|
$250.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
14.000
|
$1,500.000
|
$2,500.000
|
$1,100.000
|
$1,000.000
|
$1,100.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
297.000
|
$30.000
|
$31.400
|
$11.000
|
$10.000
|
$15.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
51.000
|
$330.000
|
$80.565
|
$82.500
|
$75.000
|
$275.000
|
$150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$430,416.000
|
$113,500.000
|
$279,006.650
|
$610,296.500
|
$131,313.000
|
$560,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,500.000
|
$5,000.000
|
$23,582.130
|
$8,600.000
|
$6,649.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$9,150.000
|
$9,465.610
|
$19,500.000
|
$22,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
176.000
|
$150.000
|
$205.000
|
$558.610
|
$275.000
|
$600.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$120.000
|
$73.950
|
$1,060.440
|
$275.000
|
$150.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
735.000
|
$65.000
|
$54.300
|
$58.300
|
$70.000
|
$53.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
735.000
|
$21.000
|
$17.030
|
$13.200
|
$15.000
|
$12.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
885.000
|
$4.500
|
$4.570
|
$5.500
|
$5.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
885.000
|
$1.500
|
$1.250
|
$1.100
|
$2.000
|
$1.000
|
$2.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
720.000
|
$75.000
|
$63.000
|
$111.530
|
$108.000
|
$95.000
|
$120.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,800.000
|
$11.000
|
$11.000
|
$19.500
|
$35.000
|
$35.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
720.000
|
$15.000
|
$15.650
|
$15.750
|
$35.000
|
$45.000
|
$30.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
212.000
|
$60.000
|
$91.155
|
$64.890
|
$82.010
|
$105.000
|
$55.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
952.000
|
$35.000
|
$90.000
|
$67.330
|
$39.780
|
$42.000
|
$45.000
|
|
|
TURNOUTS (ACP)
|
SY
|
600.000
|
$75.000
|
$100.000
|
$107.120
|
$102.010
|
$100.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,525.000
|
$30.000
|
$33.000
|
$29.700
|
$27.000
|
$27.750
|
$35.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
4.000
|
$1,500.000
|
$867.412
|
$1,540.000
|
$1,400.000
|
$1,200.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,350.000
|
$5.000
|
$3.000
|
$2.200
|
$2.000
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$255.000
|
$236.135
|
$330.000
|
$300.000
|
$200.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,000.000
|
$3,331.540
|
$3,190.000
|
$2,900.000
|
$2,925.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$300.000
|
$330.000
|
$300.000
|
$200.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,904.000
|
$1,645.000
|
$2,970.000
|
$2,700.000
|
$2,200.000
|
$8,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,250.000
|
$1,000.000
|
$1,320.000
|
$1,200.000
|
$800.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,000.000
|
$9,412.570
|
$9,900.000
|
$9,000.000
|
$8,650.000
|
$21,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
16.000
|
$200.000
|
$250.000
|
$198.000
|
$180.000
|
$160.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$250.000
|
$288.500
|
$220.000
|
$200.000
|
$300.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
114.000
|
$720.000
|
$721.260
|
$577.500
|
$525.000
|
$750.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$810.000
|
$850.000
|
$638.000
|
$580.000
|
$900.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$875.000
|
$825.000
|
$750.000
|
$1,200.000
|
$1,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
120.000
|
$120.000
|
$115.000
|
$110.000
|
$100.000
|
$150.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
48.000
|
$28.000
|
$35.000
|
$34.100
|
$31.000
|
$25.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
52.000
|
$66.000
|
$72.500
|
$88.000
|
$80.000
|
$55.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
50,062.000
|
$0.560
|
$0.735
|
$0.260
|
$0.240
|
$0.240
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,510.000
|
$0.500
|
$0.330
|
$0.390
|
$0.350
|
$0.350
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
37,897.000
|
$0.500
|
$0.410
|
$0.260
|
$0.240
|
$0.240
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
304.000
|
$6.000
|
$4.400
|
$5.500
|
$5.000
|
$5.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$16.000
|
$14.420
|
$11.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
12,000.000
|
$1.150
|
$1.560
|
$1.650
|
$1.500
|
$1.500
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,648.000
|
$2.000
|
$1.000
|
$2.180
|
$2.250
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
84.000
|
$7.250
|
$8.590
|
$8.800
|
$8.000
|
$8.000
|
$20.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
50,062.000
|
$1.000
|
$0.925
|
$1.100
|
$1.000
|
$1.000
|
$0.650
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
37,897.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$0.650
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
2,510.000
|
$0.900
|
$0.850
|
$1.100
|
$1.000
|
$1.000
|
$0.650
|
|
|
PAVEMENT SLER 6"
|
LF
|
128.000
|
$0.940
|
$0.375
|
$3.300
|
$3.000
|
$3.000
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
598.000
|
$5.000
|
$5.500
|
$5.500
|
$5.000
|
$5.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
19,350.000
|
$0.900
|
$0.650
|
$0.390
|
$0.350
|
$0.350
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
128.000
|
$0.340
|
$0.100
|
$2.200
|
$2.000
|
$2.000
|
$1.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$7,000.000
|
$41,436.700
|
$26,791.880
|
$7,500.000
|
$8,500.000
|
$65,000.000
|
|
|
DRIFTWOOD REMOVAL AREA (2)
|
LS
|
1.000
|
$500.000
|
$40,000.000
|
$1,818.000
|
$30,000.000
|
$7,500.000
|
$65,000.000
|
|
Totals: |
$4,539,091.620
|
$5,014,608.243
|
$5,580,133.100
|
$5,649,679.650
|
$5,895,832.430
|
$5,899,284.200
|