PREPARING ROW
|
STA
|
200.000
|
$400.000
|
$488.250
|
$1,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
100.000
|
$35.000
|
$36.460
|
$33.740
|
|
|
BACKFILL (TY B)
|
STA
|
837.000
|
$190.000
|
$128.940
|
$102.720
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
9.000
|
$350.000
|
$272.940
|
$319.250
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
93,076.000
|
$0.350
|
$0.110
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
93,076.000
|
$0.350
|
$0.120
|
$0.110
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
186,149.000
|
$1.250
|
$0.400
|
$0.380
|
|
|
VEGETATIVE WATERING
|
MG
|
559.000
|
$40.000
|
$40.950
|
$114.000
|
|
|
FL BS (CMP IN PLC)(RAP) (6")
|
SY
|
400.000
|
$25.000
|
$14.750
|
$2.810
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,019.000
|
$85.000
|
$66.790
|
$121.110
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
411,696.000
|
$1.950
|
$2.080
|
$1.500
|
|
|
CUT & RESTORING PAV
|
SY
|
25.000
|
$120.000
|
$157.500
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
30.000
|
$295.000
|
$231.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
102.000
|
$10.000
|
$52.500
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
50.000
|
$300.000
|
$210.000
|
$50.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
154.000
|
$200.000
|
$152.250
|
$145.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
254.600
|
$415.000
|
$540.750
|
$515.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
225.000
|
$50.000
|
$51.450
|
$49.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
78.000
|
$125.000
|
$110.250
|
$105.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,395.000
|
$1,338.750
|
$1,275.000
|
|
|
REMOV & RE - LAY PIPE (48 IN)
|
LF
|
18.000
|
$110.000
|
$183.750
|
$175.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$275.000
|
$498.750
|
$475.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$950,917.380
|
$234,948.720
|
$951,190.180
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$4,000.000
|
$21,672.130
|
$50,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
148.000
|
$6.000
|
$5.250
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
148.000
|
$3.000
|
$1.580
|
$1.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
611.000
|
$120.000
|
$120.750
|
$124.570
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,482.000
|
$50.000
|
$37.210
|
$54.690
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
165,665.000
|
$0.180
|
$0.120
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
83,155.000
|
$0.180
|
$0.120
|
$0.100
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,950.000
|
$35.000
|
$28.090
|
$25.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$2,300.000
|
$2,834.710
|
$2,100.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
16.000
|
$1,050.000
|
$1,023.750
|
$875.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,800.000
|
$2.900
|
$2.100
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$220.000
|
$262.500
|
$185.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,200.000
|
$3,097.500
|
$2,775.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$55.000
|
$78.750
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
90.000
|
$30.000
|
$23.100
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
14,730.000
|
$0.240
|
$0.210
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
87,476.000
|
$0.280
|
$0.170
|
$0.160
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,721.000
|
$1.700
|
$1.730
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,758.000
|
$2.000
|
$1.050
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
591.000
|
$5.900
|
$7.880
|
$7.500
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
8.000
|
$130.000
|
$136.500
|
$130.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
8.000
|
$160.000
|
$210.000
|
$200.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
18.000
|
$55.000
|
$52.500
|
$50.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
242.000
|
$5.500
|
$8.930
|
$8.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
150.000
|
$2.000
|
$1.050
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
170,618.000
|
$0.400
|
$0.470
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
14,730.000
|
$0.370
|
$0.490
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
87,476.000
|
$0.370
|
$0.470
|
$0.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
171.000
|
$3.500
|
$5.250
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,918.000
|
$3.500
|
$4.200
|
$4.000
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
7,032.000
|
$115.000
|
$97.000
|
$148.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
45,288.000
|
$130.000
|
$96.850
|
$107.500
|
|
|
BONDING COURSE
|
GAL
|
20,507.000
|
$4.750
|
$5.980
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$13,504.750
|
$6,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$225.000
|
$425.900
|
$292.400
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$150.000
|
$967.240
|
$20.000
|
|
Totals: |
$10,196,403.880
|
$7,831,624.150
|
$9,511,901.800
|