REMOVING CONC (CURB AND GUTTER)
|
LF
|
720.000
|
$8.000
|
$12.000
|
$11.000
|
$10.000
|
$10.000
|
$27.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
233.000
|
$22.000
|
$40.000
|
$28.000
|
$65.000
|
$40.000
|
$55.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
2,545.000
|
$0.150
|
$0.200
|
$0.250
|
$0.220
|
$0.220
|
$0.300
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
2,545.000
|
$0.700
|
$0.800
|
$1.150
|
$1.020
|
$1.020
|
$1.350
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
1,273.000
|
$0.660
|
$0.800
|
$0.800
|
$0.730
|
$0.730
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
1,273.000
|
$0.660
|
$0.800
|
$0.800
|
$0.730
|
$0.730
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
84.000
|
$5.000
|
$10.000
|
$5.000
|
$75.000
|
$0.010
|
$50.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
112,765.000
|
$3.990
|
$4.750
|
$4.000
|
$4.000
|
$4.950
|
$5.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
2,685.000
|
$108.000
|
$185.000
|
$169.000
|
$170.000
|
$210.000
|
$212.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
700.000
|
$56.000
|
$65.000
|
$80.000
|
$80.000
|
$40.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
77,460.000
|
$2.650
|
$2.500
|
$4.500
|
$4.500
|
$3.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
208,761.000
|
$2.070
|
$4.000
|
$4.500
|
$4.500
|
$4.500
|
$4.000
|
|
|
FULL - DEPTH REPAIR CRCP (6")
|
SY
|
500.000
|
$250.000
|
$185.000
|
$300.000
|
$225.000
|
$290.000
|
$300.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
10.000
|
$220.000
|
$300.000
|
$350.000
|
$700.000
|
$300.000
|
$836.000
|
|
|
CL C CONC(PILE ENCASEMENT)
|
LF
|
48.000
|
$1,140.000
|
$600.000
|
$500.000
|
$1,450.000
|
$2,000.000
|
$1,050.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
15.000
|
$225.000
|
$400.000
|
$1,150.000
|
$325.000
|
$275.000
|
$475.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
8.000
|
$750.000
|
$1,400.000
|
$1,400.000
|
$2,200.000
|
$300.000
|
$1,645.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
132.000
|
$300.000
|
$300.000
|
$300.000
|
$165.000
|
$325.000
|
$367.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
60.000
|
$140.000
|
$200.000
|
$375.000
|
$425.000
|
$150.000
|
$485.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
56.900
|
$550.000
|
$600.000
|
$785.000
|
$550.000
|
$700.000
|
$870.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
576.000
|
$27.000
|
$50.000
|
$34.000
|
$29.260
|
$55.000
|
$60.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
260.000
|
$150.000
|
$175.000
|
$285.000
|
$225.000
|
$250.000
|
$300.000
|
|
|
ADJUSTING INLETS
|
EA
|
11.000
|
$1,350.000
|
$2,500.000
|
$2,000.000
|
$6,000.000
|
$4,250.000
|
$6,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
11.000
|
$575.000
|
$1,200.000
|
$500.000
|
$2,000.000
|
$1,000.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,078,000.000
|
$550,000.000
|
$555,000.000
|
$869,000.000
|
$800,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$10,000.000
|
$5,300.000
|
$5,000.000
|
$5,500.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$5.000
|
$11.000
|
$12.000
|
$11.000
|
$11.000
|
$14.500
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
100.000
|
$15.000
|
$40.000
|
$20.000
|
$30.000
|
$40.000
|
$60.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$50.000
|
$125.000
|
$55.000
|
$160.000
|
$150.000
|
$136.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$3.000
|
$3.300
|
$3.000
|
$3.000
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$0.750
|
$0.800
|
$0.700
|
$0.700
|
$15.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$4.000
|
$7.000
|
$6.000
|
$6.000
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$1.500
|
$1.650
|
$1.500
|
$1.500
|
$1.000
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$50.000
|
$150.000
|
$90.000
|
$200.000
|
$150.000
|
$242.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
160.000
|
$60.000
|
$40.000
|
$42.000
|
$37.000
|
$44.000
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$45.000
|
$90.000
|
$165.000
|
$110.000
|
$100.000
|
$87.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$75.000
|
$120.000
|
$165.000
|
$110.000
|
$108.000
|
$87.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$7.000
|
$10.000
|
$23.000
|
$40.000
|
$100.000
|
$11.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$7.000
|
$10.000
|
$23.000
|
$40.000
|
$108.000
|
$12.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$10.000
|
$15.000
|
$35.000
|
$50.000
|
$100.000
|
$22.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$15.000
|
$35.000
|
$50.000
|
$108.000
|
$23.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
720.000
|
$32.000
|
$50.000
|
$40.000
|
$46.000
|
$70.000
|
$90.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
325.000
|
$30.000
|
$31.000
|
$32.000
|
$28.250
|
$32.000
|
$38.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
12.000
|
$1,900.000
|
$2,250.000
|
$2,200.000
|
$2,050.000
|
$2,500.000
|
$2,710.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
375.000
|
$2.000
|
$2.200
|
$2.250
|
$2.000
|
$7.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,509.000
|
$3,050.000
|
$3,000.000
|
$2,750.000
|
$3,000.000
|
$3,630.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$240.000
|
$220.000
|
$225.000
|
$200.000
|
$250.000
|
$264.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$650.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$33.000
|
$20.000
|
$17.000
|
$15.000
|
$50.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
44.000
|
$35.000
|
$30.000
|
$27.000
|
$25.000
|
$50.000
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
19,935.000
|
$0.260
|
$0.330
|
$0.350
|
$0.300
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
4,154.000
|
$0.590
|
$0.550
|
$0.550
|
$0.500
|
$0.600
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,895.000
|
$8.000
|
$3.300
|
$3.400
|
$3.000
|
$3.000
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
13,991.000
|
$0.330
|
$0.330
|
$0.330
|
$0.300
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
73,656.000
|
$0.240
|
$0.330
|
$0.330
|
$0.300
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,985.000
|
$2.200
|
$1.100
|
$1.150
|
$1.000
|
$1.250
|
$1.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,819.000
|
$1.450
|
$1.250
|
$1.150
|
$1.150
|
$1.000
|
$1.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,095.000
|
$1.500
|
$1.250
|
$1.150
|
$1.150
|
$1.000
|
$1.850
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
16,796.000
|
$1.550
|
$1.350
|
$1.430
|
$1.600
|
$2.500
|
$2.200
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
47,657.000
|
$1.550
|
$1.350
|
$1.430
|
$1.600
|
$2.500
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,154.000
|
$1.050
|
$1.100
|
$1.150
|
$1.000
|
$1.000
|
$1.320
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,966.000
|
$7.080
|
$6.500
|
$6.800
|
$6.000
|
$6.000
|
$8.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
50.000
|
$6.330
|
$6.500
|
$6.800
|
$6.000
|
$6.000
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
19,935.000
|
$0.350
|
$0.700
|
$0.700
|
$0.650
|
$0.650
|
$0.900
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
18,399.000
|
$0.640
|
$0.650
|
$0.650
|
$0.600
|
$0.600
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
13,991.000
|
$0.400
|
$0.650
|
$0.650
|
$0.600
|
$0.600
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
73,656.000
|
$0.450
|
$0.650
|
$0.650
|
$0.600
|
$0.600
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
106.000
|
$215.000
|
$220.000
|
$225.000
|
$200.000
|
$200.000
|
$265.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
39.000
|
$280.000
|
$250.000
|
$265.000
|
$230.000
|
$230.000
|
$305.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$35.000
|
$85.000
|
$85.000
|
$75.000
|
$75.000
|
$100.000
|
|
PREFAB PAV MRK TY C (Y) (4") (SLD)
|
LF
|
230.000
|
$3.500
|
$4.400
|
$4.500
|
$4.000
|
$4.000
|
$5.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,266.000
|
$3.950
|
$3.850
|
$4.000
|
$3.500
|
$3.500
|
$4.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,131.000
|
$3.800
|
$3.850
|
$4.000
|
$3.500
|
$3.500
|
$4.650
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
3.000
|
$40.000
|
$1,500.000
|
$1,050.000
|
$950.000
|
$1,000.000
|
$2,000.000
|
|
|
CAM (ASPHALT) PG(70-22)
|
TON
|
1,273.000
|
$175.550
|
$192.000
|
$193.000
|
$194.000
|
$225.000
|
$0.010
|
|
|
CAM (AGGREGATE)
|
TON
|
15,694.000
|
$175.550
|
$192.000
|
$193.000
|
$194.000
|
$225.000
|
$240.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
5,997.000
|
$145.000
|
$142.000
|
$158.000
|
$158.000
|
$150.000
|
$140.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
31,484.000
|
$145.000
|
$148.000
|
$147.000
|
$158.000
|
$150.000
|
$155.000
|
|
|
TACK COAT
|
GAL
|
22,649.000
|
$3.340
|
$5.000
|
$2.000
|
$3.500
|
$5.000
|
$5.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$100.000
|
$100.000
|
$115.000
|
$115.000
|
$150.000
|
$330.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,000.000
|
$15,000.000
|
$8,500.000
|
$20,000.000
|
$20,000.000
|
$24,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
71.000
|
$225.000
|
$200.000
|
$100.000
|
$150.000
|
$150.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
60.000
|
$130.000
|
$300.000
|
$150.000
|
$1.000
|
$300.000
|
$330.000
|
|
Totals: |
$11,898,352.560
|
$12,569,410.610
|
$12,755,319.950
|
$13,533,928.740
|
$13,997,990.170
|
$14,593,192.500
|