|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
276.000
|
$35.000
|
$25.000
|
$35.000
|
|
|
BACKFILL (TY A)
|
STA
|
217.660
|
$330.000
|
$290.000
|
$375.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
34,341.000
|
$1.050
|
$0.850
|
$0.810
|
|
|
VEGETATIVE WATERING
|
MG
|
378.000
|
$15.000
|
$15.000
|
$8.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
7,475.000
|
$3.650
|
$2.200
|
$4.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
178.000
|
$110.000
|
$200.000
|
$172.000
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
4,928.000
|
$110.000
|
$100.500
|
$105.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
|
TON
|
2,546.000
|
$125.000
|
$110.250
|
$111.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
26,045.000
|
$2.400
|
$2.350
|
$3.000
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
361.000
|
$145.000
|
$130.000
|
$200.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
5,650.000
|
$145.000
|
$130.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,500.000
|
$65.000
|
$40.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,243.000
|
$3.000
|
$2.500
|
$3.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
16,456.000
|
$3.150
|
$2.500
|
$3.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
4,088.000
|
$2.750
|
$2.500
|
$4.000
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
35,840.000
|
$2.000
|
$2.000
|
$3.250
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
115.000
|
$450.000
|
$415.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$265,000.000
|
$155,000.000
|
$330,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$7,000.000
|
$3,000.000
|
$15,000.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
52,948.000
|
$0.400
|
$0.150
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$20.000
|
$19.750
|
$20.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$55.000
|
$84.000
|
$70.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,835.000
|
$1,500.000
|
$1,550.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,300.000
|
$1,025.000
|
$220.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,062.500
|
$3.400
|
$3.000
|
$5.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$300.000
|
$250.000
|
$220.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$165.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$2,300.000
|
$2,280.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$400.000
|
$250.000
|
$220.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$28.000
|
$24.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
41.000
|
$45.000
|
$39.000
|
$25.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
202.000
|
$1.200
|
$1.250
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
3,128.000
|
$1.400
|
$1.250
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,022.000
|
$0.850
|
$0.800
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,300.000
|
$0.450
|
$0.520
|
$0.360
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,950.000
|
$0.450
|
$0.650
|
$0.680
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
27,800.000
|
$0.500
|
$0.520
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,300.000
|
$0.450
|
$0.520
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
27,800.000
|
$0.500
|
$0.520
|
$0.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
450.000
|
$3.500
|
$3.500
|
$5.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
4,767.000
|
$2.400
|
$2.350
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
108.000
|
$110.000
|
$100.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$10,000.000
|
$1.000
|
$15,000.000
|
|
Totals: |
$2,937,496.300
|
$2,447,523.750
|
$3,359,067.660
|