REMOVING CONC (CURB)
|
LF
|
1,348.000
|
$25.000
|
$21.350
|
$20.000
|
$20.000
|
$16.000
|
$15.000
|
$44.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
21.000
|
$60.000
|
$163.400
|
$50.000
|
$225.000
|
$55.000
|
$60.000
|
$165.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
5,789.000
|
$1.000
|
$2.900
|
$0.600
|
$3.500
|
$2.000
|
$2.000
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
116.000
|
$40.000
|
$80.000
|
$100.000
|
$45.000
|
$200.000
|
$10.000
|
$220.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
|
SY
|
33.000
|
$400.000
|
$1,162.000
|
$200.000
|
$500.000
|
$200.000
|
$200.000
|
$1,250.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,778.000
|
$10.000
|
$25.000
|
$10.000
|
$39.000
|
$10.000
|
$10.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
2.000
|
$225.000
|
$1,300.000
|
$500.000
|
$1,250.000
|
$600.000
|
$250.000
|
$650.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$400.000
|
$1,200.000
|
$600.000
|
$750.000
|
$670.000
|
$250.000
|
$2,500.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
8.000
|
$25.000
|
$600.000
|
$100.000
|
$50.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
6.000
|
$200.000
|
$361.000
|
$500.000
|
$400.000
|
$350.000
|
$150.000
|
$685.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
19.000
|
$250.000
|
$539.000
|
$400.000
|
$300.000
|
$375.000
|
$300.000
|
$725.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
444.000
|
$275.000
|
$272.000
|
$150.000
|
$200.000
|
$250.000
|
$175.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
62.000
|
$225.000
|
$478.000
|
$250.000
|
$325.000
|
$250.000
|
$240.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
109.000
|
$700.000
|
$1,155.000
|
$600.000
|
$920.000
|
$500.000
|
$900.000
|
$1,250.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
478.000
|
$45.000
|
$57.000
|
$60.000
|
$50.000
|
$50.000
|
$60.000
|
$150.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
4,110.000
|
$75.000
|
$49.000
|
$120.000
|
$45.000
|
$126.000
|
$75.000
|
$225.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM I-A)
|
LS
|
1.000
|
$675,000.000
|
$165,000.000
|
$250,000.000
|
$186,000.000
|
$250,000.000
|
$199,800.000
|
$800,000.000
|
|
|
CLEAN & PAINT EXIST RAIL (SYSTEM I-A)
|
LS
|
1.000
|
$28,800.000
|
$15,000.000
|
$20,000.000
|
$16,000.000
|
$25,000.000
|
$9,600.000
|
$125,000.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,592.500
|
$250.000
|
$245.000
|
$200.000
|
$285.000
|
$300.000
|
$250.000
|
$675.000
|
|
|
SHOT BLASTING
|
SY
|
4,110.000
|
$7.000
|
$10.000
|
$5.000
|
$4.000
|
$7.000
|
$5.000
|
$33.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$255,310.000
|
$224,000.000
|
$250,000.000
|
$275,000.000
|
$283,000.000
|
$250,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$6,000.000
|
$5,000.000
|
$26,000.000
|
$5,000.000
|
$20,000.000
|
$9,850.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$30.000
|
$45.800
|
$5.000
|
$40.000
|
$40.000
|
$12.000
|
$101.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$8.000
|
$17.200
|
$5.000
|
$2.000
|
$10.000
|
$6.000
|
$85.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,288.000
|
$5.000
|
$5.750
|
$4.000
|
$2.000
|
$6.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,288.000
|
$1.000
|
$1.150
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
$4.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$5,000.000
|
$7,525.000
|
$6,000.000
|
$7,500.000
|
$5,600.000
|
$6,000.000
|
$15,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
120.000
|
$70.000
|
$5.000
|
$100.000
|
$0.010
|
$85.000
|
$100.000
|
$200.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
810.000
|
$70.000
|
$34.000
|
$100.000
|
$95.000
|
$60.000
|
$100.000
|
$125.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,300.000
|
$15.000
|
$39.000
|
$20.000
|
$14.000
|
$15.000
|
$20.000
|
$95.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
930.000
|
$20.000
|
$18.000
|
$25.000
|
$35.000
|
$20.000
|
$25.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,475.000
|
$30.000
|
$29.200
|
$40.000
|
$30.000
|
$32.000
|
$36.000
|
$33.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$2,289.000
|
$3,000.000
|
$2,500.000
|
$2,300.000
|
$2,100.000
|
$2,500.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
9.000
|
$20.000
|
$30.000
|
$100.000
|
$130.000
|
$1,100.000
|
$40.000
|
$200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,800.000
|
$1,832.000
|
$3,000.000
|
$2,000.000
|
$1,800.000
|
$1,700.000
|
$2,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,306.000
|
$7.000
|
$6.000
|
$5.000
|
$2.500
|
$4.000
|
$8.000
|
$9.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,210.000
|
$4,000.000
|
$3,800.000
|
$3,550.000
|
$3,300.000
|
$4,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$300.000
|
$300.000
|
$500.000
|
$335.000
|
$250.000
|
$800.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,500.000
|
$5,000.000
|
$1,000.000
|
$2,000.000
|
$3,000.000
|
$1,000.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,400.000
|
$5,000.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
$1,000.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$6,000.000
|
$10,000.000
|
$11,000.000
|
$11,000.000
|
$10,000.000
|
$12,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
11.000
|
$40.000
|
$30.000
|
$40.000
|
$33.000
|
$20.000
|
$30.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$35.000
|
$30.000
|
$40.000
|
$34.000
|
$20.000
|
$40.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
11.000
|
$45.000
|
$30.000
|
$40.000
|
$32.000
|
$20.000
|
$40.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$45.000
|
$57.000
|
$40.000
|
$46.000
|
$30.000
|
$30.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$45.000
|
$57.000
|
$40.000
|
$49.000
|
$30.000
|
$30.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
18.000
|
$45.000
|
$57.000
|
$40.000
|
$44.000
|
$30.000
|
$40.000
|
$65.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
10.000
|
$5.000
|
$11.450
|
$50.000
|
$13.000
|
$12.000
|
$7.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
190.000
|
$2.000
|
$2.600
|
$4.000
|
$3.000
|
$3.000
|
$7.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
12,056.000
|
$1.750
|
$1.500
|
$2.000
|
$1.750
|
$1.600
|
$3.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
12,056.000
|
$1.750
|
$1.500
|
$2.000
|
$1.750
|
$1.600
|
$3.000
|
$4.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
415.000
|
$2.000
|
$4.600
|
$2.000
|
$3.000
|
$1.600
|
$4.000
|
$10.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
301.000
|
$2.000
|
$4.600
|
$2.000
|
$3.000
|
$1.500
|
$4.000
|
$10.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
76.000
|
$5.000
|
$11.450
|
$10.000
|
$13.000
|
$12.000
|
$7.000
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,564.000
|
$1.000
|
$0.650
|
$1.000
|
$0.800
|
$1.000
|
$2.000
|
$3.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
50.000
|
$12.000
|
$40.000
|
$5.000
|
$20.000
|
$10.000
|
$10.000
|
$150.000
|
|
|
JT / CRCK SEAL (HOT - POURED RUBBER)
|
LF
|
2.000
|
$100.000
|
$400.000
|
$50.000
|
$500.000
|
$50.000
|
$75.000
|
$800.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
35.000
|
$19.000
|
$280.000
|
$100.000
|
$20.000
|
$50.000
|
$40.000
|
$250.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
55.000
|
$100.000
|
$65.000
|
$120.000
|
$60.000
|
$155.000
|
$125.000
|
$150.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
76.000
|
$150.000
|
$75.000
|
$500.000
|
$85.000
|
$150.000
|
$80.000
|
$250.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
1,960.000
|
$100.000
|
$60.000
|
$50.000
|
$65.000
|
$125.000
|
$150.000
|
$155.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
84.000
|
$120.000
|
$175.000
|
$10.000
|
$75.000
|
$50.000
|
$350.000
|
$265.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
6,028.000
|
$2.000
|
$2.500
|
$3.000
|
$3.000
|
$2.500
|
$3.000
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,508.000
|
$2.250
|
$2.600
|
$3.000
|
$3.000
|
$2.500
|
$3.000
|
$4.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
6,028.000
|
$2.000
|
$2.500
|
$3.000
|
$3.000
|
$2.500
|
$33.000
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
164.000
|
$300.000
|
$220.000
|
$300.000
|
$50.000
|
$165.000
|
$150.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$350.000
|
$1,100.000
|
$300.000
|
$300.000
|
$550.000
|
$300.000
|
$650.000
|
|
Totals: |
$2,808,333.000
|
$2,245,311.700
|
$2,362,875.400
|
$2,410,700.400
|
$2,673,989.700
|
$2,754,610.000
|
$6,010,427.500
|