PREPARING ROW
|
STA
|
0.250
|
$2,000.000
|
$10,000.000
|
$10,000.000
|
$32,239.200
|
$77,715.100
|
$73,129.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
44.000
|
$23.500
|
$33.000
|
$13.500
|
$12.570
|
$39.620
|
$64.250
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
323.000
|
$23.500
|
$20.000
|
$17.000
|
$6.850
|
$58.400
|
$31.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,798.000
|
$15.000
|
$10.000
|
$11.000
|
$15.370
|
$28.460
|
$25.050
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,292.000
|
$20.000
|
$15.000
|
$5.700
|
$17.400
|
$4.900
|
$12.200
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
31,583.000
|
$1.500
|
$1.000
|
$1.000
|
$1.010
|
$0.700
|
$10.300
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
31,583.000
|
$0.550
|
$0.520
|
$0.570
|
$0.590
|
$0.700
|
$0.650
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
15,793.000
|
$0.500
|
$0.480
|
$0.520
|
$0.550
|
$0.700
|
$0.600
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
15,793.000
|
$0.500
|
$0.480
|
$0.520
|
$0.550
|
$0.700
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
315.800
|
$26.520
|
$9.000
|
$37.000
|
$33.490
|
$1.700
|
$14.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
18,934.000
|
$20.000
|
$23.000
|
$16.850
|
$25.000
|
$31.000
|
$22.350
|
|
|
CEMENT
|
TON
|
198.000
|
$250.000
|
$230.000
|
$235.000
|
$285.000
|
$255.000
|
$285.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
19,976.000
|
$3.240
|
$2.000
|
$2.000
|
$5.000
|
$3.700
|
$4.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
11,166.000
|
$5.750
|
$4.600
|
$5.740
|
$4.280
|
$6.600
|
$5.650
|
|
|
ASPH (RC-250)
|
GAL
|
4,994.000
|
$5.500
|
$5.700
|
$7.210
|
$5.770
|
$9.700
|
$8.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
148.000
|
$200.000
|
$240.000
|
$212.000
|
$185.790
|
$138.900
|
$205.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
235.000
|
$160.000
|
$220.000
|
$226.000
|
$181.770
|
$181.900
|
$245.000
|
|
|
PLANE ASPH CONC PAV(4" TO 6")
|
SY
|
11,504.000
|
$4.800
|
$4.000
|
$4.990
|
$2.520
|
$2.700
|
$4.750
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$730.000
|
$950.000
|
$1,087.000
|
$1,510.500
|
$3,342.700
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
192.000
|
$95.840
|
$93.000
|
$65.000
|
$120.560
|
$114.400
|
$86.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
136.000
|
$127.000
|
$105.000
|
$152.000
|
$135.860
|
$135.400
|
$118.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
40.000
|
$202.770
|
$249.000
|
$217.000
|
$199.500
|
$155.900
|
$200.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
90.000
|
$206.170
|
$164.000
|
$310.000
|
$214.450
|
$216.000
|
$264.100
|
|
|
RC PIPE (ARCH)(CL III)(DES 6)
|
LF
|
38.000
|
$450.000
|
$525.000
|
$490.000
|
$312.000
|
$469.100
|
$750.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,550.000
|
$1,250.000
|
$1,087.000
|
$1,683.210
|
$1,764.300
|
$2,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,000.000
|
$2,000.000
|
$1,630.000
|
$2,042.310
|
$2,167.700
|
$2,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,980.330
|
$2,700.000
|
$2,717.000
|
$3,040.380
|
$2,264.900
|
$2,650.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$2,900.000
|
$2,718.000
|
$3,057.480
|
$2,458.900
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,000.000
|
$6,200.000
|
$4,348.000
|
$4,712.760
|
$8,479.400
|
$7,400.000
|
|
|
SET (TY II) (DES 6) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,000.000
|
$7,500.000
|
$7,065.000
|
$5,714.820
|
$4,459.100
|
$10,660.000
|
|
|
REMOV STR (SET)
|
EA
|
15.000
|
$1,800.000
|
$400.000
|
$815.000
|
$796.100
|
$738.800
|
$642.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,365.000
|
$900.000
|
$2,174.000
|
$951.900
|
$753.600
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
13.000
|
$350.000
|
$1,200.000
|
$1,300.000
|
$1,167.180
|
$10.300
|
$39.200
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$224,000.000
|
$176,000.000
|
$237,250.000
|
$250,000.000
|
$200,000.000
|
$205,470.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$3,000.000
|
$2,000.000
|
$4,000.000
|
$5,000.000
|
$7,625.000
|
$6,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
100.000
|
$45.000
|
$35.000
|
$38.000
|
$39.900
|
$51.600
|
$43.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$27.500
|
$12.000
|
$13.000
|
$13.680
|
$16.600
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,669.000
|
$5.000
|
$4.500
|
$4.890
|
$5.130
|
$5.000
|
$5.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,669.000
|
$1.500
|
$1.000
|
$1.000
|
$1.140
|
$1.400
|
$1.250
|
|
|
CONC CURB (TY I)
|
LF
|
19.000
|
$30.000
|
$50.000
|
$109.000
|
$75.000
|
$69.500
|
$135.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
261.000
|
$125.000
|
$130.000
|
$163.000
|
$109.480
|
$170.000
|
$104.250
|
|
|
DRIVEWAYS (ACP)
|
SY
|
854.000
|
$50.000
|
$83.000
|
$91.000
|
$70.180
|
$48.400
|
$61.250
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
681.000
|
$30.000
|
$65.000
|
$90.000
|
$51.640
|
$47.600
|
$125.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$2,000.000
|
$3,500.000
|
$4,000.000
|
$3,874.180
|
$2,648.900
|
$3,170.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
9,188.000
|
$0.750
|
$0.430
|
$0.730
|
$0.810
|
$1.200
|
$0.350
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
9,158.000
|
$0.750
|
$0.430
|
$0.730
|
$0.810
|
$1.200
|
$0.200
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
6.000
|
$300.000
|
$340.000
|
$364.000
|
$285.000
|
$379.700
|
$420.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$660.000
|
$700.000
|
$740.000
|
$627.000
|
$771.800
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$800.000
|
$640.000
|
$678.000
|
$969.000
|
$707.200
|
$780.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$750.000
|
$809.000
|
$1,140.000
|
$843.200
|
$930.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$96.080
|
$100.000
|
$147.000
|
$285.000
|
$153.000
|
$168.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
2.000
|
$105.660
|
$85.000
|
$93.000
|
$285.000
|
$96.400
|
$106.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
15,438.000
|
$0.600
|
$0.250
|
$0.570
|
$0.570
|
$0.600
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,544.000
|
$0.600
|
$0.330
|
$0.570
|
$0.570
|
$1.200
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
11,682.000
|
$0.600
|
$0.250
|
$0.570
|
$0.570
|
$0.600
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
31,376.000
|
$1.040
|
$0.650
|
$1.000
|
$2.280
|
$1.200
|
$0.770
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
34,756.000
|
$1.100
|
$0.650
|
$1.000
|
$2.280
|
$1.200
|
$0.770
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
798.000
|
$1.800
|
$1.400
|
$1.000
|
$2.280
|
$0.500
|
$1.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
15,438.000
|
$0.870
|
$0.570
|
$0.960
|
$0.740
|
$0.700
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,544.000
|
$0.870
|
$0.520
|
$0.960
|
$0.740
|
$1.200
|
$0.620
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,682.000
|
$0.870
|
$0.570
|
$0.960
|
$0.740
|
$0.700
|
$0.690
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
31.000
|
$21.000
|
$50.000
|
$22.000
|
$22.800
|
$17.000
|
$62.400
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$240.000
|
$150.000
|
$326.000
|
$404.700
|
$255.000
|
$187.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
533.000
|
$6.000
|
$7.300
|
$6.850
|
$7.980
|
$4.600
|
$8.950
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
19,862.000
|
$1.000
|
$0.370
|
$0.350
|
$1.140
|
$0.800
|
$0.440
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,939.000
|
$120.000
|
$111.000
|
$104.000
|
$130.000
|
$148.500
|
$141.100
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
1,997.000
|
$145.000
|
$124.000
|
$121.500
|
$150.000
|
$151.900
|
$159.250
|
|
|
BONDING COURSE
|
GAL
|
1,828.000
|
$4.000
|
$4.400
|
$6.000
|
$6.550
|
$5.100
|
$6.450
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,000.000
|
$5,000.000
|
$10,700.000
|
$9,690.000
|
$19,946.100
|
$12,180.000
|
|
|
TMA (STATIONARY)
|
DAY
|
79.000
|
$250.000
|
$240.000
|
$570.000
|
$159.600
|
$209.700
|
$240.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$250.000
|
$240.000
|
$900.000
|
$798.000
|
$396.700
|
$475.000
|
|
Totals: |
$2,241,574.566
|
$2,060,026.160
|
$2,159,754.630
|
$2,520,856.232
|
$2,628,999.995
|
$2,825,938.240
|