PREPARING ROW
|
STA
|
261.000
|
$1,500.000
|
$575.000
|
$600.000
|
$690.000
|
$1,000.000
|
$1,216.780
|
$815.910
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
387.000
|
$21.000
|
$13.500
|
$13.000
|
$22.000
|
$35.000
|
$31.500
|
$49.390
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
7,257.000
|
$5.000
|
$5.400
|
$16.000
|
$7.000
|
$8.000
|
$7.500
|
$14.840
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
21,751.000
|
$12.660
|
$17.500
|
$13.000
|
$17.000
|
$12.000
|
$13.400
|
$5.570
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
25,029.000
|
$18.000
|
$5.000
|
$15.000
|
$20.000
|
$17.000
|
$15.200
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
12,892.000
|
$22.000
|
$5.000
|
$15.000
|
$14.000
|
$17.000
|
$9.800
|
$19.930
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
107,464.000
|
$1.500
|
$0.550
|
$1.000
|
$2.000
|
$1.250
|
$1.100
|
$5.920
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
107,464.000
|
$0.500
|
$0.480
|
$0.480
|
$0.500
|
$0.500
|
$0.600
|
$0.570
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
53,741.000
|
$0.500
|
$0.460
|
$0.460
|
$0.500
|
$0.480
|
$0.580
|
$0.540
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
53,741.000
|
$0.400
|
$0.460
|
$0.460
|
$0.500
|
$0.480
|
$0.580
|
$0.540
|
|
|
VEGETATIVE WATERING
|
MG
|
1,074.700
|
$15.000
|
$37.000
|
$13.000
|
$53.000
|
$15.000
|
$14.000
|
$137.820
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
63,966.000
|
$25.710
|
$25.500
|
$32.000
|
$31.000
|
$28.000
|
$30.100
|
$42.120
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
226.000
|
$335.000
|
$337.000
|
$338.000
|
$430.000
|
$375.000
|
$420.000
|
$442.340
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
22,754.000
|
$7.000
|
$3.600
|
$2.400
|
$3.750
|
$3.500
|
$6.600
|
$3.510
|
|
|
CEMENT
|
TON
|
676.000
|
$270.000
|
$248.000
|
$230.000
|
$270.000
|
$275.000
|
$285.000
|
$249.560
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
68,269.000
|
$4.460
|
$1.300
|
$2.100
|
$2.500
|
$3.500
|
$4.100
|
$2.680
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
15,992.000
|
$6.810
|
$5.250
|
$6.800
|
$6.000
|
$5.000
|
$5.100
|
$7.050
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
365.000
|
$55.000
|
$136.000
|
$95.000
|
$82.000
|
$80.000
|
$36.800
|
$125.840
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
1,085.000
|
$180.000
|
$245.000
|
$200.000
|
$110.000
|
$160.000
|
$91.250
|
$173.800
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,410.000
|
$2.500
|
$5.100
|
$4.400
|
$3.000
|
$5.000
|
$3.100
|
$6.440
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
114,029.000
|
$2.500
|
$2.200
|
$2.000
|
$1.750
|
$2.500
|
$3.300
|
$2.370
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
4,879.000
|
$4.080
|
$6.150
|
$3.000
|
$6.500
|
$9.000
|
$9.400
|
$15.490
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
53.000
|
$575.000
|
$1,250.000
|
$950.000
|
$620.000
|
$850.000
|
$728.000
|
$1,124.180
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
3.000
|
$420.000
|
$4,900.000
|
$2,000.000
|
$1,800.000
|
$2,000.000
|
$3,360.000
|
$2,366.680
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,686.000
|
$80.000
|
$65.000
|
$70.000
|
$70.000
|
$115.000
|
$101.100
|
$80.460
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
124.000
|
$125.000
|
$85.000
|
$170.000
|
$91.000
|
$135.000
|
$128.000
|
$189.330
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$5,900.000
|
$5,500.000
|
$6,700.000
|
$8,100.000
|
$7,000.000
|
$6,020.000
|
$7,691.710
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
109.000
|
$1,300.000
|
$1,500.000
|
$1,000.000
|
$1,200.000
|
$1,500.000
|
$2,270.000
|
$1,183.340
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,300.000
|
$2,200.000
|
$2,500.000
|
$1,800.000
|
$1,850.000
|
$2,950.000
|
$2,958.350
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,200.000
|
$750.000
|
$1,200.000
|
$1,000.000
|
$2,500.000
|
$793.000
|
$1,420.000
|
|
|
REMOV STR (SET)
|
EA
|
24.000
|
$600.000
|
$400.000
|
$1,000.000
|
$360.000
|
$500.000
|
$495.500
|
$1,183.340
|
|
|
REMOV STR (PIPE)
|
LF
|
1,538.000
|
$35.000
|
$35.000
|
$40.000
|
$23.000
|
$17.000
|
$39.170
|
$47.330
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
3.000
|
$75.000
|
$1,500.000
|
$500.000
|
$430.000
|
$600.000
|
$1,244.300
|
$591.670
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,179,000.000
|
$721,000.000
|
$670,000.000
|
$1,095,000.000
|
$1,100,000.000
|
$398,455.000
|
$190,710.470
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$9,000.000
|
$21,000.000
|
$10,500.000
|
$5,600.000
|
$5,000.000
|
$5,040.000
|
$15,999.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
990.000
|
$40.000
|
$36.000
|
$36.000
|
$46.000
|
$37.000
|
$45.000
|
$42.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
105.000
|
$70.000
|
$70.000
|
$70.000
|
$89.000
|
$75.000
|
$87.500
|
$82.830
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,095.000
|
$12.000
|
$10.000
|
$10.000
|
$13.000
|
$10.000
|
$12.500
|
$11.830
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,658.000
|
$4.000
|
$3.500
|
$5.000
|
$4.500
|
$4.000
|
$4.400
|
$4.140
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,658.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
$1.000
|
$1.250
|
$1.180
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,409.000
|
$8.000
|
$4.000
|
$4.000
|
$5.000
|
$5.000
|
$5.000
|
$4.730
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,409.000
|
$1.500
|
$1.000
|
$1.000
|
$1.250
|
$2.000
|
$1.250
|
$1.180
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,556.000
|
$65.000
|
$61.000
|
$62.000
|
$50.000
|
$52.000
|
$50.300
|
$70.310
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
431.000
|
$110.000
|
$132.000
|
$280.000
|
$130.000
|
$145.000
|
$87.900
|
$266.250
|
|
|
DRIVEWAYS (CONC)(TYPE 2)
|
SY
|
74.000
|
$150.000
|
$250.000
|
$460.000
|
$240.000
|
$200.000
|
$155.000
|
$473.340
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
47,600.000
|
$0.200
|
$0.120
|
$0.330
|
$0.250
|
$0.350
|
$0.180
|
$0.070
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
2,830.000
|
$0.350
|
$0.330
|
$3.500
|
$0.750
|
$3.500
|
$0.180
|
$0.390
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
562.500
|
$30.000
|
$23.500
|
$27.000
|
$34.000
|
$35.000
|
$18.150
|
$28.400
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$2,300.000
|
$1,250.000
|
$1,500.000
|
$1,900.000
|
$1,600.000
|
$1,050.000
|
$1,325.340
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$3,000.000
|
$3,000.000
|
$3,700.000
|
$3,700.000
|
$2,830.000
|
$3,425.760
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$260.000
|
$250.000
|
$310.000
|
$380.000
|
$300.000
|
$603.000
|
$384.580
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
11.000
|
$520.000
|
$425.000
|
$435.000
|
$540.000
|
$700.000
|
$532.000
|
$721.830
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
34.000
|
$180.000
|
$125.000
|
$130.000
|
$160.000
|
$300.000
|
$156.250
|
$213.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
6.000
|
$230.000
|
$145.000
|
$150.000
|
$190.000
|
$350.000
|
$181.300
|
$266.260
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
69.000
|
$700.000
|
$550.000
|
$570.000
|
$700.000
|
$450.000
|
$688.000
|
$698.170
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$800.000
|
$700.000
|
$720.000
|
$890.000
|
$600.000
|
$875.000
|
$923.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$1,000.000
|
$800.000
|
$820.000
|
$1,000.000
|
$750.000
|
$1,000.000
|
$1,165.590
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$900.000
|
$950.000
|
$1,000.000
|
$1,200.000
|
$2,400.000
|
$1,188.000
|
$2,159.600
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$700.000
|
$450.000
|
$480.000
|
$570.000
|
$400.000
|
$562.500
|
$846.090
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$110.000
|
$100.000
|
$100.000
|
$130.000
|
$100.000
|
$125.000
|
$118.340
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$85.000
|
$25.000
|
$26.000
|
$32.000
|
$26.000
|
$31.250
|
$27.220
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
34.000
|
$80.000
|
$30.000
|
$52.000
|
$64.000
|
$35.000
|
$37.500
|
$33.720
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
16.000
|
$150.000
|
$95.000
|
$100.000
|
$120.000
|
$175.000
|
$118.750
|
$88.760
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
1,018.000
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.500
|
$0.560
|
$0.530
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
46,868.000
|
$0.450
|
$0.400
|
$0.450
|
$0.500
|
$0.450
|
$0.500
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,827.000
|
$0.700
|
$1.150
|
$0.130
|
$1.500
|
$1.250
|
$1.450
|
$1.360
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
54,950.000
|
$0.450
|
$0.400
|
$0.450
|
$0.500
|
$0.450
|
$0.500
|
$0.470
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
52,329.000
|
$1.910
|
$0.250
|
$0.280
|
$0.250
|
$0.250
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
59,892.000
|
$1.440
|
$0.250
|
$0.280
|
$0.250
|
$0.250
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
60,982.000
|
$1.660
|
$0.700
|
$0.780
|
$1.000
|
$0.750
|
$0.880
|
$0.830
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
69,810.000
|
$1.230
|
$0.700
|
$0.780
|
$1.000
|
$0.750
|
$0.880
|
$0.830
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,440.000
|
$1.900
|
$1.050
|
$1.180
|
$1.500
|
$1.100
|
$1.310
|
$1.240
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
350.000
|
$2.100
|
$1.800
|
$2.000
|
$2.500
|
$2.000
|
$2.250
|
$2.130
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,588.000
|
$1.800
|
$1.200
|
$1.350
|
$1.750
|
$1.250
|
$1.500
|
$1.420
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
226.000
|
$3.600
|
$13.000
|
$14.000
|
$18.000
|
$15.000
|
$62.400
|
$15.380
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
70.000
|
$0.200
|
$1.100
|
$1.200
|
$1.500
|
$1.200
|
$1.380
|
$1.300
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
1,569.000
|
$0.200
|
$1.050
|
$1.150
|
$1.500
|
$1.100
|
$1.310
|
$1.240
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
838.000
|
$0.600
|
$2.200
|
$2.500
|
$3.000
|
$2.500
|
$2.750
|
$2.600
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
27.000
|
$1.500
|
$4.200
|
$4.600
|
$5.750
|
$4.500
|
$5.250
|
$4.970
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
2.000
|
$130.000
|
$100.000
|
$110.000
|
$140.000
|
$100.000
|
$125.000
|
$118.340
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
1.000
|
$140.000
|
$100.000
|
$112.000
|
$140.000
|
$100.000
|
$125.000
|
$118.340
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
290.000
|
$0.200
|
$1.100
|
$1.200
|
$1.500
|
$1.200
|
$1.380
|
$1.300
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
1,576.000
|
$0.200
|
$1.050
|
$1.150
|
$1.500
|
$1.100
|
$1.310
|
$1.240
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,290.000
|
$1.000
|
$0.660
|
$0.730
|
$1.000
|
$0.670
|
$0.850
|
$0.780
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
53,604.000
|
$0.550
|
$0.620
|
$0.700
|
$0.750
|
$0.670
|
$0.800
|
$0.730
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
9,590.000
|
$0.750
|
$0.660
|
$0.730
|
$1.000
|
$0.670
|
$0.850
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
57,831.000
|
$0.550
|
$0.620
|
$0.700
|
$0.750
|
$0.670
|
$0.800
|
$0.730
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
50.000
|
$240.000
|
$250.000
|
$280.000
|
$340.000
|
$300.000
|
$312.500
|
$295.840
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$600.000
|
$650.000
|
$710.000
|
$890.000
|
$700.000
|
$812.600
|
$769.170
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$300.000
|
$300.000
|
$340.000
|
$410.000
|
$300.000
|
$375.000
|
$355.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
251.000
|
$1.000
|
$9.750
|
$11.000
|
$13.000
|
$10.000
|
$12.200
|
$11.540
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,208.000
|
$4.500
|
$6.000
|
$6.700
|
$8.250
|
$6.000
|
$7.500
|
$7.100
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,319.000
|
$0.350
|
$6.000
|
$6.700
|
$8.250
|
$6.000
|
$7.500
|
$7.100
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
100.000
|
$0.450
|
$9.000
|
$10.000
|
$12.000
|
$10.000
|
$11.250
|
$10.650
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$60.000
|
$190.000
|
$210.000
|
$260.000
|
$200.000
|
$237.500
|
$224.830
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$60.000
|
$190.000
|
$215.000
|
$260.000
|
$200.000
|
$237.500
|
$224.830
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,373.000
|
$0.150
|
$0.350
|
$0.380
|
$0.500
|
$0.350
|
$0.450
|
$0.410
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
838.000
|
$0.150
|
$0.650
|
$0.720
|
$1.000
|
$0.650
|
$0.800
|
$0.770
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
27.000
|
$0.150
|
$2.450
|
$2.700
|
$3.250
|
$2.500
|
$3.100
|
$2.900
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
17,613.000
|
$120.090
|
$109.000
|
$107.000
|
$110.000
|
$120.000
|
$130.250
|
$142.360
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
18,518.000
|
$155.000
|
$125.000
|
$128.000
|
$130.000
|
$130.000
|
$136.450
|
$155.140
|
|
|
TACK COAT
|
GAL
|
30,155.000
|
$6.000
|
$4.050
|
$4.400
|
$4.500
|
$3.500
|
$6.150
|
$5.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$2,000.000
|
$6,000.000
|
$9,600.000
|
$12,500.000
|
$22,330.000
|
$5,916.690
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$250.000
|
$600.000
|
$330.000
|
$200.000
|
$290.000
|
$200.000
|
$381.150
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$375.000
|
$1,000.000
|
$2,500.000
|
$300.000
|
$500.000
|
$2,850.000
|
$2,703.930
|
|
Totals: |
$13,115,067.960
|
$10,784,375.490
|
$11,447,522.140
|
$11,938,490.850
|
$11,983,648.760
|
$12,016,752.025
|
$13,881,772.034
|