PREPARING ROW
|
STA
|
481.020
|
$300.000
|
$350.000
|
$232.000
|
$300.000
|
$500.000
|
$450.000
|
$475.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
4.000
|
$300.000
|
$650.000
|
$695.000
|
$650.000
|
$500.000
|
$800.000
|
$415.000
|
|
|
PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
7.000
|
$275.000
|
$400.000
|
$430.000
|
$400.000
|
$300.000
|
$500.000
|
$415.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
41.000
|
$14.000
|
$25.000
|
$40.700
|
$15.000
|
$50.000
|
$22.000
|
$100.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
9,514.000
|
$5.000
|
$3.000
|
$2.950
|
$4.000
|
$3.000
|
$5.000
|
$10.250
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
118,757.000
|
$6.000
|
$1.500
|
$3.190
|
$4.700
|
$3.000
|
$3.290
|
$11.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,308.000
|
$10.000
|
$5.000
|
$4.350
|
$7.000
|
$15.000
|
$7.000
|
$8.750
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
9,384.000
|
$20.000
|
$6.500
|
$4.950
|
$5.000
|
$15.000
|
$7.000
|
$13.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
64,122.000
|
$0.600
|
$0.500
|
$0.320
|
$0.400
|
$0.500
|
$0.500
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
193.000
|
$3.000
|
$5.000
|
$5.320
|
$5.000
|
$10.000
|
$6.000
|
$6.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
64,122.000
|
$0.120
|
$0.080
|
$0.090
|
$0.080
|
$0.090
|
$0.100
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
32,061.000
|
$0.100
|
$0.080
|
$0.090
|
$0.080
|
$0.090
|
$0.100
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
32,061.000
|
$0.100
|
$0.080
|
$0.090
|
$0.080
|
$0.090
|
$0.100
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
1,924.000
|
$15.000
|
$10.000
|
$15.000
|
$15.000
|
$5.000
|
$10.000
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
116,380.000
|
$12.000
|
$11.500
|
$14.700
|
$12.000
|
$12.000
|
$13.800
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
32,067.000
|
$18.000
|
$18.700
|
$21.050
|
$18.000
|
$20.000
|
$21.000
|
$22.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
34,204.000
|
$3.000
|
$2.700
|
$3.280
|
$2.300
|
$2.500
|
$3.700
|
$4.250
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
770.000
|
$155.000
|
$147.000
|
$151.050
|
$160.000
|
$150.000
|
$150.000
|
$145.000
|
|
|
CEMENT
|
TON
|
1,862.000
|
$140.000
|
$136.000
|
$145.550
|
$140.000
|
$140.000
|
$140.000
|
$135.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
124,139.000
|
$1.500
|
$1.250
|
$1.100
|
$1.400
|
$1.300
|
$2.670
|
$2.250
|
|
|
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(8")
|
SY
|
12,686.000
|
$35.000
|
$23.000
|
$22.200
|
$20.000
|
$25.000
|
$23.000
|
$29.000
|
|
|
ASPH (RC-250)
|
GAL
|
40,283.000
|
$4.000
|
$3.770
|
$3.500
|
$3.200
|
$3.000
|
$3.000
|
$3.050
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
1,194.000
|
$100.000
|
$90.000
|
$104.550
|
$128.000
|
$77.000
|
$120.000
|
$88.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
2,376.000
|
$130.000
|
$110.000
|
$115.700
|
$140.000
|
$120.000
|
$100.000
|
$108.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
112,818.000
|
$3.000
|
$3.000
|
$2.350
|
$2.400
|
$2.500
|
$2.700
|
$2.650
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG64-22
|
TON
|
1,352.000
|
$100.000
|
$125.000
|
$74.100
|
$93.000
|
$80.000
|
$100.000
|
$99.000
|
|
|
CUT & RESTORING PAV
|
SY
|
15.000
|
$100.000
|
$300.000
|
$436.000
|
$50.000
|
$300.000
|
$330.000
|
$305.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
8.660
|
$500.000
|
$550.000
|
$642.000
|
$800.000
|
$1,000.000
|
$600.000
|
$565.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
2.500
|
$200.000
|
$300.000
|
$299.400
|
$350.000
|
$500.000
|
$330.000
|
$305.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
110.000
|
$450.000
|
$650.000
|
$366.400
|
$450.000
|
$500.000
|
$660.000
|
$625.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
101.000
|
$60.000
|
$56.000
|
$74.300
|
$63.000
|
$40.000
|
$60.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10.000
|
$70.000
|
$100.000
|
$195.100
|
$440.000
|
$150.000
|
$110.000
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
54.000
|
$120.000
|
$250.000
|
$146.800
|
$200.000
|
$200.000
|
$270.000
|
$255.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$4,000.000
|
$4,500.000
|
$5,103.510
|
$3,400.000
|
$4,000.000
|
$5,000.000
|
$4,600.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$9,500.000
|
$7,553.000
|
$13,000.000
|
$15,000.000
|
$11,000.000
|
$6,750.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
20.000
|
$990.000
|
$1,000.000
|
$1,430.000
|
$1,300.000
|
$1,200.000
|
$1,200.000
|
$1,025.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,400.000
|
$1,500.000
|
$1,600.000
|
$1,400.000
|
$1,500.000
|
$1,600.000
|
$1,550.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$900.000
|
$1,200.000
|
$1,365.000
|
$1,400.000
|
$1,100.000
|
$1,400.000
|
$1,225.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
15.000
|
$800.000
|
$1,200.000
|
$1,645.000
|
$1,600.000
|
$1,300.000
|
$1,400.000
|
$1,225.000
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
3.000
|
$3,000.000
|
$2,500.000
|
$2,480.000
|
$2,000.000
|
$1,700.000
|
$2,800.000
|
$2,550.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
3.000
|
$3,250.000
|
$2,800.000
|
$2,530.000
|
$1,900.000
|
$2,600.000
|
$3,100.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$2,300.000
|
$2,800.000
|
$2,700.000
|
$2,800.000
|
$1,700.000
|
$3,100.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,200.000
|
$3,000.000
|
$3,500.000
|
$4,000.000
|
$2,600.000
|
$3,300.000
|
$3,100.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,900.000
|
$3,500.000
|
$4,780.000
|
$5,700.000
|
$3,800.000
|
$3,900.000
|
$3,575.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
16.000
|
$60.000
|
$80.000
|
$204.000
|
$150.000
|
$140.000
|
$90.000
|
$85.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
6.000
|
$100.000
|
$150.000
|
$204.000
|
$200.000
|
$190.000
|
$160.000
|
$155.000
|
|
|
REMOV STR (PIPE)
|
LF
|
341.000
|
$18.000
|
$35.000
|
$34.200
|
$25.000
|
$15.000
|
$38.000
|
$36.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$440,000.000
|
$550,000.000
|
$287,055.000
|
$400,000.000
|
$600,000.010
|
$350,000.000
|
$475,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$1,650.000
|
$1,425.000
|
$6,800.000
|
$3,000.000
|
$4,000.000
|
$1,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
460.000
|
$26.000
|
$21.000
|
$22.340
|
$21.000
|
$25.000
|
$25.000
|
$22.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
460.000
|
$8.000
|
$8.000
|
$8.510
|
$8.000
|
$3.000
|
$6.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$2.700
|
$2.250
|
$6.740
|
$3.500
|
$5.000
|
$6.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$0.640
|
$1.000
|
$1.060
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
867.000
|
$4.000
|
$6.000
|
$5.320
|
$6.000
|
$7.000
|
$7.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
867.000
|
$1.000
|
$1.000
|
$1.060
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$5,000.000
|
$7,000.000
|
$5,680.000
|
$6,000.000
|
$5,000.000
|
$2,400.000
|
$5,000.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
168.000
|
$35.000
|
$120.000
|
$37.650
|
$48.000
|
$30.000
|
$33.000
|
$50.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,919.000
|
$30.000
|
$11.500
|
$15.370
|
$35.000
|
$25.000
|
$19.000
|
$36.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
524.000
|
$30.000
|
$13.500
|
$15.920
|
$35.000
|
$20.000
|
$23.000
|
$36.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,050.000
|
$19.000
|
$23.100
|
$26.910
|
$24.000
|
$25.000
|
$18.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,200.000
|
$1,400.000
|
$3,297.780
|
$1,800.000
|
$1,700.000
|
$1,700.000
|
$357.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$2.700
|
$4.000
|
$5.320
|
$4.000
|
$2.000
|
$2.000
|
$5.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$160.000
|
$120.000
|
$372.330
|
$120.000
|
$150.000
|
$150.000
|
$357.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,250.000
|
$2,100.000
|
$2,319.080
|
$2,100.000
|
$2,200.000
|
$2,300.000
|
$2,225.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
34.000
|
$160.000
|
$102.000
|
$207.440
|
$105.000
|
$150.000
|
$115.000
|
$200.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
6.000
|
$206.000
|
$133.000
|
$271.270
|
$135.000
|
$200.000
|
$150.000
|
$265.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
5.000
|
$500.000
|
$595.000
|
$606.370
|
$600.000
|
$600.000
|
$600.000
|
$585.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
98.000
|
$320.000
|
$277.000
|
$313.820
|
$280.000
|
$300.000
|
$300.000
|
$333.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$400.000
|
$390.000
|
$494.670
|
$400.000
|
$400.000
|
$430.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$450.000
|
$555.000
|
$590.410
|
$560.000
|
$600.000
|
$610.000
|
$567.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
$800.000
|
$612.000
|
$813.810
|
$620.000
|
$700.000
|
$670.000
|
$789.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
63.000
|
$80.000
|
$50.000
|
$53.190
|
$50.000
|
$50.000
|
$85.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
24.000
|
$22.000
|
$14.500
|
$21.280
|
$15.000
|
$20.000
|
$20.000
|
$21.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
44.000
|
$40.000
|
$37.000
|
$44.680
|
$37.000
|
$40.000
|
$40.000
|
$43.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
95,299.000
|
$0.150
|
$0.100
|
$0.100
|
$0.090
|
$0.200
|
$0.090
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
37.000
|
$2.000
|
$1.000
|
$1.060
|
$1.100
|
$10.000
|
$1.100
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
10,156.000
|
$0.150
|
$0.100
|
$0.100
|
$0.090
|
$0.200
|
$0.090
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
32,002.000
|
$0.170
|
$0.100
|
$0.100
|
$0.090
|
$0.200
|
$0.090
|
$0.160
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,539.000
|
$1.000
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$0.800
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
250.000
|
$6.000
|
$12.500
|
$12.770
|
$12.000
|
$10.000
|
$13.000
|
$5.250
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$600.000
|
$660.000
|
$702.110
|
$660.000
|
$750.000
|
$700.000
|
$333.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
95,299.000
|
$0.300
|
$0.300
|
$0.310
|
$0.300
|
$0.400
|
$0.320
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
10,156.000
|
$0.300
|
$0.300
|
$0.310
|
$0.300
|
$0.400
|
$0.320
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
32,002.000
|
$0.350
|
$0.300
|
$0.310
|
$0.300
|
$0.400
|
$0.320
|
$0.410
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
907.000
|
$2.500
|
$2.750
|
$2.710
|
$2.600
|
$4.000
|
$3.000
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
270.000
|
$0.100
|
$0.050
|
$0.010
|
$0.010
|
$5.000
|
$0.020
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$3,500.000
|
$10,000.000
|
$9,050.000
|
$7,500.000
|
$15,000.000
|
$5,000.000
|
$20,000.000
|
|
Totals: |
$6,429,068.830
|
$5,527,215.430
|
$5,726,661.750
|
$5,865,306.650
|
$6,015,945.870
|
$6,128,544.130
|
$7,821,001.150
|