EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
40.000
|
$75.000
|
$78.500
|
$200.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
393.470
|
$250.000
|
$110.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
8,067.000
|
$36.400
|
$62.700
|
$56.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
181,960.000
|
$2.000
|
$1.590
|
$1.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
209.000
|
$600.000
|
$757.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$282,113.940
|
$135,300.000
|
$140,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$5,700.000
|
$21,600.000
|
$10,400.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$3.500
|
$7.500
|
$5.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.500
|
$3.300
|
$2.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
804.000
|
$90.000
|
$48.200
|
$50.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
995.000
|
$90.000
|
$87.750
|
$41.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
832.000
|
$50.000
|
$55.250
|
$35.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
78,254.000
|
$0.250
|
$0.070
|
$0.190
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
44,997.000
|
$0.250
|
$0.070
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,225.000
|
$27.000
|
$22.550
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,220.000
|
$2,103.000
|
$2,500.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$70.000
|
$89.000
|
$90.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
4.000
|
$600.000
|
$1,060.000
|
$900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,425.000
|
$3.000
|
$2.170
|
$2.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$200.000
|
$217.000
|
$600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,200.000
|
$2,989.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$250.000
|
$217.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
38.000
|
$30.000
|
$27.200
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
46.000
|
$35.000
|
$29.350
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
792.000
|
$0.600
|
$0.490
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
54.000
|
$1.000
|
$0.490
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
20,209.500
|
$0.500
|
$0.490
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,379.000
|
$1.750
|
$2.000
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
20,374.000
|
$1.750
|
$2.000
|
$0.900
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,294.000
|
$1.500
|
$1.900
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,072.000
|
$9.000
|
$6.520
|
$7.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,000.000
|
$0.400
|
$0.220
|
$0.300
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,860.000
|
$0.850
|
$0.710
|
$0.780
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
83,159.000
|
$0.850
|
$0.710
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
450.000
|
$0.850
|
$0.710
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
89,838.000
|
$0.850
|
$0.710
|
$0.770
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$270.000
|
$272.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$500.000
|
$527.000
|
$500.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
686.000
|
$7.000
|
$6.520
|
$6.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,131.000
|
$8.000
|
$6.520
|
$6.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,000.000
|
$2.000
|
$1.090
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,000.000
|
$0.250
|
$1.090
|
$0.020
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
26,338.000
|
$150.000
|
$142.200
|
$155.000
|
|
|
TACK COAT
|
GAL
|
23,944.000
|
$4.500
|
$4.200
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$2,700.000
|
$7,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$15.000
|
$18.000
|
$7.000
|
|
|
TMA (STATIONARY)
|
DAY
|
67.000
|
$200.000
|
$530.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
23.000
|
$100.000
|
$900.000
|
$250.000
|
|
Totals: |
$5,924,392.640
|
$5,669,015.765
|
$5,837,661.025
|