PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
1.000
|
$2,500.000
|
$2,500.000
|
$1,284.000
|
$3,000.000
|
$3,000.000
|
$2,200.000
|
$2,500.000
|
|
|
PREP ROW (TREE REMOVE) (24"-36" DIA)
|
EA
|
2.000
|
$3,000.000
|
$2,600.000
|
$1,398.050
|
$4,000.000
|
$3,000.000
|
$3,500.000
|
$3,100.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
270.000
|
$20.000
|
$25.000
|
$40.000
|
$20.000
|
$100.000
|
$100.000
|
$85.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
230.000
|
$25.000
|
$15.000
|
$26.050
|
$20.000
|
$40.000
|
$35.000
|
$35.000
|
|
|
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,097.000
|
$10.000
|
$4.750
|
$4.050
|
$25.000
|
$6.000
|
$9.000
|
$10.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
681.000
|
$50.000
|
$35.000
|
$34.800
|
$80.000
|
$42.000
|
$35.000
|
$30.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
144.000
|
$50.000
|
$55.000
|
$94.700
|
$80.000
|
$50.000
|
$40.000
|
$88.000
|
|
|
DRILL SEED (PERM_URBAN_CLAY)
|
SY
|
10,240.000
|
$1.000
|
$0.600
|
$1.000
|
$0.750
|
$1.000
|
$0.350
|
$0.650
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
10,240.000
|
$1.000
|
$0.600
|
$0.750
|
$0.750
|
$1.000
|
$0.350
|
$0.650
|
|
|
VEGETATIVE WATERING
|
TGL
|
689.000
|
$200.000
|
$30.000
|
$99.550
|
$35.000
|
$50.000
|
$30.000
|
$35.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$200.000
|
$140.000
|
$232.150
|
$200.000
|
$375.000
|
$150.000
|
$220.000
|
|
|
FL BS (CMP IN PLC) (TY A GR 4) (4"-21")
|
SY
|
3,774.000
|
$50.000
|
$98.000
|
$43.650
|
$75.000
|
$74.000
|
$130.000
|
$38.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
755.000
|
$10.000
|
$25.000
|
$9.200
|
$12.000
|
$15.000
|
$20.000
|
$11.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
2,662.000
|
$5.000
|
$25.000
|
$5.400
|
$10.000
|
$4.000
|
$18.000
|
$4.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
23,962.000
|
$5.000
|
$15.000
|
$4.850
|
$4.000
|
$14.000
|
$10.000
|
$3.500
|
|
|
AGGR (TY-B, GR-5)(SAC-B)
|
CY
|
285.000
|
$250.000
|
$130.000
|
$364.100
|
$150.000
|
$462.000
|
$850.000
|
$450.000
|
|
|
D-GR HMA TY-C SAC-B PG70-28
|
TON
|
867.000
|
$300.000
|
$250.000
|
$277.500
|
$250.000
|
$300.000
|
$320.000
|
$290.000
|
|
|
TACK COAT
|
GAL
|
529.000
|
$10.000
|
$25.000
|
$10.300
|
$10.000
|
$15.000
|
$25.000
|
$8.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
435.000
|
$400.000
|
$460.000
|
$291.450
|
$300.000
|
$300.000
|
$350.000
|
$360.000
|
|
|
TACK COAT
|
GAL
|
529.000
|
$10.000
|
$25.000
|
$10.300
|
$10.000
|
$15.000
|
$25.000
|
$8.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
500.000
|
$80.000
|
$250.000
|
$174.600
|
$90.000
|
$110.000
|
$150.000
|
$152.000
|
|
|
PLANE ASPH CONC PAV(6")
|
SY
|
4,097.000
|
$12.000
|
$4.750
|
$7.500
|
$20.000
|
$12.000
|
$15.000
|
$8.500
|
|
|
CEM STABIL BKFL
|
CY
|
288.000
|
$300.000
|
$400.000
|
$279.200
|
$800.020
|
$350.000
|
$500.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
5,760.000
|
$30.000
|
$35.000
|
$12.950
|
$50.000
|
$90.000
|
$10.000
|
$12.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
952.000
|
$450.000
|
$400.000
|
$484.300
|
$410.000
|
$365.000
|
$500.000
|
$560.000
|
|
|
CL C CONC (ABUT)
|
CY
|
99.600
|
$2,300.000
|
$1,400.000
|
$2,343.000
|
$2,000.000
|
$2,300.000
|
$3,000.000
|
$3,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
81.200
|
$2,600.000
|
$1,400.000
|
$1,893.500
|
$2,000.000
|
$2,800.000
|
$4,000.000
|
$3,400.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
23.600
|
$2,600.000
|
$2,000.000
|
$3,105.000
|
$2,000.000
|
$5,000.000
|
$4,000.000
|
$3,400.000
|
|
|
REINF CONC SLAB
|
SF
|
13,200.000
|
$45.000
|
$39.000
|
$57.900
|
$40.090
|
$55.000
|
$60.000
|
$60.000
|
|
|
APPROACH SLAB
|
CY
|
172.800
|
$1,400.000
|
$1,200.000
|
$1,042.800
|
$2,000.000
|
$1,200.000
|
$2,500.000
|
$1,100.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,484.800
|
$300.000
|
$282.000
|
$295.350
|
$350.000
|
$425.000
|
$450.000
|
$320.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
2,936.500
|
$20.000
|
$10.000
|
$10.850
|
$15.000
|
$15.000
|
$25.000
|
$15.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
378.000
|
$700.000
|
$500.000
|
$667.150
|
$1,000.000
|
$975.000
|
$1,000.000
|
$920.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
60.000
|
$750.000
|
$700.000
|
$559.350
|
$1,000.000
|
$1,200.000
|
$750.000
|
$920.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
112.000
|
$50.000
|
$35.000
|
$33.550
|
$20.000
|
$31.000
|
$25.000
|
$25.000
|
|
|
RAIL (TY T223)
|
LF
|
680.000
|
$250.000
|
$225.000
|
$274.200
|
$175.000
|
$340.000
|
$325.000
|
$270.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
168.000
|
$320.000
|
$200.000
|
$215.800
|
$150.000
|
$196.000
|
$200.000
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
120.000
|
$360.000
|
$425.000
|
$260.250
|
$200.000
|
$225.000
|
$200.000
|
$200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$6,000.000
|
$4,500.000
|
$8,142.550
|
$10,000.000
|
$4,200.000
|
$4,000.000
|
$8,000.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$1,500.000
|
$2,500.000
|
$2,053.100
|
$2,000.000
|
$1,600.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$400,000.000
|
$350,000.000
|
$589,371.800
|
$467,000.000
|
$1,075,000.000
|
$1,000,000.000
|
$1,950,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$689,000.000
|
$600,000.000
|
$762,626.800
|
$800,000.000
|
$950,000.000
|
$1,100,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$30,000.000
|
$15,000.000
|
$12,800.000
|
$42,550.000
|
$12,000.000
|
$4,000.000
|
$42,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
960.000
|
$150.000
|
$100.000
|
$84.850
|
$80.000
|
$60.000
|
$120.000
|
$75.000
|
|
|
TMA (STATIONARY)
|
DAY
|
482.000
|
$250.000
|
$275.000
|
$500.850
|
$450.000
|
$250.000
|
$300.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$1,000.000
|
$500.000
|
$961.200
|
$450.000
|
$1,000.000
|
$500.000
|
$100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
270.000
|
$90.000
|
$150.000
|
$138.900
|
$175.000
|
$70.000
|
$100.000
|
$160.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
135.000
|
$30.000
|
$35.000
|
$84.900
|
$50.000
|
$50.000
|
$20.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
900.000
|
$50.000
|
$45.000
|
$57.950
|
$50.000
|
$25.000
|
$75.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
450.000
|
$20.000
|
$25.000
|
$45.900
|
$30.000
|
$25.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
750.000
|
$8.000
|
$6.500
|
$3.550
|
$6.500
|
$5.000
|
$7.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
375.000
|
$4.000
|
$3.000
|
$1.350
|
$3.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,995.000
|
$10.000
|
$10.000
|
$12.100
|
$10.000
|
$8.000
|
$12.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
998.000
|
$5.000
|
$3.000
|
$0.650
|
$3.000
|
$3.000
|
$2.000
|
$3.000
|
|
|
CONSTRUCTING DETOURS (TY1)
|
SY
|
563.000
|
$150.000
|
$150.000
|
$129.400
|
$85.000
|
$300.000
|
$200.000
|
$142.000
|
|
|
CONSTRUCTING DETOURS (TY2)
|
SY
|
59.000
|
$500.000
|
$200.000
|
$377.650
|
$410.000
|
$800.000
|
$700.000
|
$1,000.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
175.000
|
$100.000
|
$50.000
|
$49.340
|
$50.000
|
$60.000
|
$40.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,300.000
|
$50.000
|
$29.000
|
$31.900
|
$35.000
|
$34.650
|
$42.000
|
$32.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$2,000.000
|
$1,450.000
|
$1,705.000
|
$1,550.000
|
$1,325.000
|
$2,000.000
|
$1,800.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,300.000
|
$1,025.000
|
$1,210.000
|
$1,100.000
|
$1,350.000
|
$1,600.000
|
$1,300.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
6.000
|
$3,000.000
|
$2,100.000
|
$2,447.500
|
$2,300.000
|
$2,625.000
|
$3,200.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$5.000
|
$3.000
|
$5.500
|
$5.000
|
$2.000
|
$5.000
|
$6.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$500.000
|
$150.000
|
$440.000
|
$400.000
|
$215.000
|
$350.000
|
$450.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$4,000.000
|
$3,275.000
|
$3,630.000
|
$3,300.000
|
$4,225.000
|
$4,000.000
|
$3,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$500.000
|
$200.000
|
$440.000
|
$400.000
|
$320.000
|
$300.000
|
$450.000
|
|
|
IN RD IL (U/P) (TY 1) (250W EQ) LED
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
$3,245.000
|
$2,500.000
|
$4,000.000
|
$4,000.000
|
$3,300.000
|
|
|
CONDT (HDPE) (2") BORE
|
LF
|
192.000
|
$40.000
|
$71.000
|
$32.450
|
$100.000
|
$55.000
|
$90.000
|
$33.000
|
|
|
CONDT (RM) (2")
|
LF
|
314.000
|
$100.000
|
$58.000
|
$67.320
|
$30.000
|
$60.000
|
$80.000
|
$70.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
526.000
|
$8.000
|
$8.000
|
$4.070
|
$2.500
|
$35.000
|
$8.000
|
$4.100
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,052.000
|
$8.500
|
$9.000
|
$4.400
|
$3.000
|
$15.000
|
$9.000
|
$4.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
$2,000.000
|
$2,500.000
|
$2,695.000
|
$1,800.000
|
$1,500.000
|
$2,300.000
|
$2,700.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$2,000.000
|
$2,400.000
|
$1,100.000
|
$500.000
|
$7,500.000
|
$2,200.000
|
$1,200.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$10,000.000
|
$9,000.000
|
$10,312.500
|
$10,000.000
|
$20,000.000
|
$10,000.000
|
$11,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
|
EA
|
4.000
|
$60.000
|
$45.000
|
$50.600
|
$46.000
|
$45.000
|
$55.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
6.000
|
$100.000
|
$45.000
|
$46.200
|
$42.000
|
$45.000
|
$55.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
|
EA
|
4.000
|
$60.000
|
$45.000
|
$50.600
|
$46.000
|
$45.000
|
$55.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
5.000
|
$100.000
|
$45.000
|
$46.200
|
$42.000
|
$44.000
|
$55.000
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$30.000
|
$15.000
|
$24.150
|
$10.000
|
$18.000
|
$25.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
17,520.000
|
$2.000
|
$1.200
|
$1.320
|
$1.200
|
$1.500
|
$1.800
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
28,365.000
|
$2.000
|
$1.200
|
$1.320
|
$1.200
|
$1.500
|
$1.800
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,037.000
|
$20.000
|
$21.000
|
$23.100
|
$21.000
|
$21.000
|
$25.000
|
$23.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
678.000
|
$2.000
|
$1.500
|
$11.050
|
$21.500
|
$2.600
|
$0.800
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
240.000
|
$2.000
|
$1.500
|
$11.050
|
$1.500
|
$2.200
|
$0.800
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
850.000
|
$2.000
|
$2.000
|
$2.200
|
$2.000
|
$2.000
|
$2.400
|
$2.300
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
1,555.000
|
$1.500
|
$1.500
|
$1.650
|
$1.500
|
$1.500
|
$2.000
|
$1.700
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
4,020.000
|
$1.500
|
$1.500
|
$1.650
|
$1.500
|
$1.500
|
$2.000
|
$1.700
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
330.000
|
$1.500
|
$1.500
|
$1.650
|
$1.500
|
$1.500
|
$2.000
|
$1.700
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
5,080.000
|
$1.500
|
$1.500
|
$1.650
|
$1.500
|
$1.500
|
$2.000
|
$1.700
|
|
PREFAB PM TY B (W)(6")(BRK)
|
LF
|
100.000
|
$15.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
$12.000
|
$11.000
|
|
PREFAB PM TY B (W)(6")(SLD)
|
LF
|
400.000
|
$15.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
$12.000
|
$11.000
|
|
PREFAB PM TY B (Y)(6")(SLD)
|
LF
|
400.000
|
$15.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
$12.000
|
$11.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
40.000
|
$30.000
|
$20.000
|
$22.000
|
$20.000
|
$20.000
|
$25.000
|
$22.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
14.000
|
$300.000
|
$250.000
|
$275.000
|
$250.000
|
$250.000
|
$300.000
|
$275.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
241.000
|
$5.000
|
$5.500
|
$6.050
|
$5.500
|
$6.000
|
$7.000
|
$6.500
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
46,934.000
|
$0.800
|
$0.750
|
$0.830
|
$0.750
|
$1.000
|
$1.000
|
$0.900
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
691.000
|
$10.000
|
$5.000
|
$5.500
|
$5.000
|
$5.000
|
$7.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
900.000
|
$2.000
|
$4.000
|
$4.400
|
$4.000
|
$4.000
|
$5.000
|
$4.200
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$35,000.000
|
$65,000.000
|
$59,511.050
|
$43,100.000
|
$50,000.000
|
$50,000.000
|
$15,000.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$6,000.000
|
$1,500.000
|
$1,073.350
|
$1,013.750
|
$8,000.000
|
$3,500.000
|
$3,200.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$3,000.000
|
$250.000
|
$670.850
|
$1,538.000
|
$5,000.000
|
$3,500.000
|
$2,800.000
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
23,602.000
|
$3.000
|
$2.000
|
$2.040
|
$2.000
|
$2.000
|
$2.500
|
$2.200
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$100,000.000
|
$70,000.000
|
$261,605.550
|
$230,000.000
|
$100,000.000
|
$500,000.000
|
$250,000.000
|
|
Totals: |
$7,580,980.700
|
$6,813,362.600
|
$7,678,802.295
|
$8,299,989.760
|
$9,863,292.300
|
$10,691,886.900
|
$11,462,192.700
|