REMOVING CONC (RIPRAP)
|
SY
|
174.000
|
$25.000
|
$40.000
|
$100.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
2,053.000
|
$7.000
|
$14.100
|
$20.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
2,379.000
|
$15.000
|
$13.750
|
$20.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,576.000
|
$20.000
|
$54.500
|
$30.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,779.000
|
$30.000
|
$38.000
|
$30.000
|
$45.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
5.180
|
$1,000.000
|
$845.000
|
$1,000.000
|
$1,100.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
1.040
|
$1,500.000
|
$2,535.000
|
$2,500.000
|
$1,100.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
6.220
|
$800.000
|
$500.000
|
$500.000
|
$1,100.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
5,183.000
|
$2.500
|
$2.650
|
$3.000
|
$4.000
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
5,455.000
|
$35.000
|
$38.250
|
$60.000
|
$65.000
|
|
|
REWORK BS MTL (TY A) (8") (DENS CONT)
|
SY
|
505.000
|
$10.000
|
$4.300
|
$45.000
|
$20.000
|
|
|
CEMENT
|
TON
|
60.000
|
$225.000
|
$250.000
|
$225.000
|
$250.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
5,455.000
|
$3.500
|
$9.250
|
$15.000
|
$15.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,366.000
|
$6.000
|
$10.500
|
$8.000
|
$8.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
413.000
|
$6.000
|
$15.500
|
$9.000
|
$24.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
3,096.000
|
$10.000
|
$5.000
|
$15.000
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
447.000
|
$200.000
|
$200.000
|
$350.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
973.000
|
$40.000
|
$90.000
|
$75.000
|
$25.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
176.000
|
$120.000
|
$145.000
|
$280.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,312.000
|
$215.000
|
$457.000
|
$510.000
|
$500.000
|
|
|
CL B CONC (FLUME)
|
CY
|
18.900
|
$700.000
|
$845.000
|
$850.000
|
$1,000.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
170.000
|
$1,300.000
|
$1,300.000
|
$1,500.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
83.400
|
$1,500.000
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
34.800
|
$1,150.000
|
$2,100.000
|
$1,750.000
|
$2,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
26,400.000
|
$28.000
|
$41.100
|
$40.000
|
$44.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
202.300
|
$800.000
|
$745.000
|
$1,500.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,414.610
|
$200.000
|
$265.000
|
$275.000
|
$300.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
2,089.500
|
$220.000
|
$275.000
|
$275.000
|
$350.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
1,403.000
|
$10.000
|
$46.500
|
$38.000
|
$55.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
248.000
|
$700.000
|
$640.000
|
$575.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
479.000
|
$200.000
|
$185.000
|
$400.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
22.000
|
$700.000
|
$865.000
|
$700.000
|
$650.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
636.000
|
$150.000
|
$191.000
|
$175.000
|
$165.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
664.000
|
$110.000
|
$93.000
|
$125.000
|
$180.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
272.000
|
$180.000
|
$260.000
|
$200.000
|
$250.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
203.000
|
$240.000
|
$230.000
|
$350.000
|
$320.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$95,000.000
|
$183,450.000
|
$200,000.000
|
$275,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$440,000.000
|
$790,000.000
|
$825,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$14,500.000
|
$35,900.000
|
$35,000.000
|
$3,250.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$45.000
|
$81.750
|
$50.000
|
$55.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$17.000
|
$13.850
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,051.000
|
$8.000
|
$8.200
|
$4.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,051.000
|
$3.000
|
$3.250
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,853.000
|
$110.000
|
$105.000
|
$75.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$5,500.000
|
$7,250.000
|
$3,500.000
|
$6,000.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
870.000
|
$25.000
|
$29.500
|
$25.000
|
$65.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
600.000
|
$11.000
|
$12.000
|
$5.000
|
$15.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
870.000
|
$25.000
|
$29.000
|
$25.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,875.000
|
$40.000
|
$39.000
|
$37.000
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$3,000.000
|
$3,000.000
|
$2,850.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,550.000
|
$4.000
|
$3.200
|
$3.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$350.000
|
$320.000
|
$300.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$320.000
|
$300.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,500.000
|
$3,700.000
|
$3,500.000
|
$3,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$320.000
|
$300.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,500.000
|
$2,640.000
|
$2,500.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,600.000
|
$1,500.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$14,000.000
|
$9,000.000
|
$8,500.000
|
$12,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$1,100.000
|
$1,300.000
|
$1,225.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$150.000
|
$130.000
|
$125.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
20.000
|
$35.000
|
$21.000
|
$20.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
42.000
|
$40.000
|
$53.000
|
$50.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,076.000
|
$1.000
|
$1.600
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
186.000
|
$1.000
|
$3.200
|
$3.000
|
$4.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,380.000
|
$0.150
|
$0.150
|
$0.140
|
$0.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,380.000
|
$0.150
|
$0.150
|
$0.140
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
7,137.000
|
$0.500
|
$1.400
|
$1.310
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
370.000
|
$0.550
|
$1.400
|
$1.310
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
5,420.000
|
$0.500
|
$1.400
|
$1.310
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
82.000
|
$4.000
|
$4.750
|
$4.480
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,510.000
|
$1.000
|
$1.600
|
$1.500
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,760.000
|
$0.500
|
$0.200
|
$0.200
|
$0.500
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
1,472.000
|
$180.000
|
$215.000
|
$200.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
1,052.000
|
$6.000
|
$7.000
|
$5.000
|
$12.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$375.000
|
$315.000
|
$3,000.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,500.000
|
$24,500.000
|
$15,500.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
6.000
|
$350.000
|
$445.000
|
$950.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
8.000
|
$70.000
|
$80.000
|
$95.000
|
$500.000
|
|
Totals: |
$5,536,580.000
|
$7,907,129.600
|
$8,323,110.380
|
$8,349,152.500
|