PREPARING ROW
|
STA
|
1.000
|
$1,000.000
|
$3,175.000
|
$10,000.000
|
$1,500.000
|
$5,000.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
42.000
|
$214.000
|
$925.000
|
$350.000
|
$750.000
|
$2,750.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
827.000
|
$16.500
|
$16.450
|
$25.000
|
$14.000
|
$40.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
13,886.000
|
$0.400
|
$0.280
|
$0.300
|
$1.000
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
19.400
|
$19.500
|
$80.000
|
$30.000
|
$25.000
|
$50.000
|
|
|
ASPHALT STAB BASE (GR 1)(PG 64)
|
TON
|
3,164.000
|
$90.000
|
$64.750
|
$100.000
|
$93.000
|
$90.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
27,809.000
|
$2.900
|
$2.800
|
$3.250
|
$4.300
|
$3.600
|
|
|
AGGR(TY-D GR-3 SAC-A)
|
CY
|
637.000
|
$118.000
|
$145.000
|
$150.000
|
$120.000
|
$140.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
1,905.000
|
$86.000
|
$72.000
|
$110.000
|
$100.000
|
$115.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
9,201.000
|
$114.000
|
$102.000
|
$130.000
|
$115.000
|
$145.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$445.000
|
$490.000
|
$475.000
|
$425.000
|
$750.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
42.000
|
$116.000
|
$145.000
|
$125.000
|
$115.000
|
$250.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,215.000
|
$2,350.000
|
$3,500.000
|
$6,500.000
|
$4,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$193,248.000
|
$86,010.000
|
$175,000.000
|
$235,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$865.000
|
$5,000.000
|
$7,500.000
|
$4,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
186.000
|
$32.000
|
$46.000
|
$47.250
|
$45.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
186.000
|
$8.000
|
$12.000
|
$12.600
|
$12.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,840.000
|
$6.000
|
$4.550
|
$4.750
|
$4.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,840.000
|
$1.500
|
$1.030
|
$1.050
|
$1.000
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
392.000
|
$72.000
|
$28.850
|
$46.000
|
$12.000
|
$60.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
875.000
|
$20.000
|
$21.000
|
$22.000
|
$30.000
|
$22.000
|
|
|
SHORT RADIUS
|
LF
|
72.000
|
$32.500
|
$29.000
|
$29.400
|
$70.000
|
$30.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$800.000
|
$980.000
|
$1,024.000
|
$1,200.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
437.000
|
$3.000
|
$2.550
|
$2.620
|
$4.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$222.000
|
$226.000
|
$236.250
|
$150.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,156.000
|
$2,360.000
|
$2,468.000
|
$3,000.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$364.000
|
$228.000
|
$236.250
|
$300.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
10.000
|
$270.000
|
$255.000
|
$236.250
|
$400.000
|
$250.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$1,500.000
|
$1,210.000
|
$2,500.000
|
$3,000.000
|
$2,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
750.000
|
$7.000
|
$15.050
|
$7.500
|
$11.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
750.000
|
$15.000
|
$19.100
|
$18.500
|
$30.000
|
$23.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
750.000
|
$1.000
|
$1.520
|
$1.250
|
$2.000
|
$2.350
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$723.000
|
$910.000
|
$875.000
|
$2,000.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
5.000
|
$630.000
|
$1,320.000
|
$588.000
|
$1,200.000
|
$600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
21.000
|
$330.000
|
$400.000
|
$383.250
|
$550.000
|
$400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$76.000
|
$77.250
|
$78.750
|
$100.000
|
$80.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$50.000
|
$61.000
|
$56.700
|
$100.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
105.000
|
$17.000
|
$28.500
|
$28.350
|
$50.000
|
$28.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,610.000
|
$0.100
|
$0.270
|
$0.280
|
$0.350
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
14,634.000
|
$0.250
|
$0.270
|
$0.280
|
$0.300
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,810.000
|
$0.400
|
$0.560
|
$0.580
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,840.000
|
$0.100
|
$0.270
|
$0.280
|
$0.300
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
16,440.000
|
$0.200
|
$0.270
|
$0.280
|
$0.300
|
$0.280
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,338.000
|
$0.900
|
$1.100
|
$2.250
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,152.000
|
$1.600
|
$1.100
|
$2.250
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
207.000
|
$1.800
|
$1.000
|
$1.050
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,810.000
|
$0.800
|
$0.760
|
$0.790
|
$0.750
|
$0.800
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,610.000
|
$0.350
|
$0.370
|
$0.390
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
14,634.000
|
$0.350
|
$0.370
|
$0.390
|
$0.350
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,840.000
|
$0.350
|
$0.370
|
$0.390
|
$0.300
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
16,440.000
|
$0.350
|
$0.370
|
$0.390
|
$0.300
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
88.000
|
$12.000
|
$13.250
|
$13.650
|
$14.000
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
36.000
|
$200.000
|
$36.500
|
$37.800
|
$225.000
|
$38.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$265.000
|
$226.000
|
$236.250
|
$275.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
255.000
|
$3.400
|
$3.550
|
$3.680
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
386.000
|
$3.500
|
$3.550
|
$3.680
|
$4.000
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
134.000
|
$143.000
|
$260.000
|
$275.000
|
$1,500.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
22.000
|
$990.000
|
$51.000
|
$52.500
|
$1,200.000
|
$75.000
|
|
Totals: |
$2,168,704.200
|
$1,853,959.540
|
$2,444,886.000
|
$2,585,282.800
|
$2,593,515.240
|