|
|
DRILL SHAFT (42 IN)
|
LF
|
135.000
|
$200.000
|
$325.000
|
$483.610
|
$352.270
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
75.000
|
$200.000
|
$367.000
|
$492.170
|
$461.680
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
27.000
|
$499.770
|
$405.000
|
$695.940
|
$841.610
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$166,670.330
|
$75,100.000
|
$86,187.860
|
$203,747.070
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,037.080
|
$2,940.000
|
$5,316.590
|
$7,881.740
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$2.300
|
$3.250
|
$3.480
|
$3.310
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$0.550
|
$1.160
|
$1.620
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$22.410
|
$25.150
|
$20.880
|
$28.860
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,152.510
|
$1,056.000
|
$1,275.880
|
$1,382.640
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,208.640
|
$2,623.500
|
$3,131.720
|
$3,186.090
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
9,010.000
|
$7.110
|
$8.300
|
$13.420
|
$7.640
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
10,700.000
|
$6.760
|
$7.050
|
$10.070
|
$8.290
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
510.000
|
$6.250
|
$6.450
|
$9.020
|
$4.170
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,785.000
|
$12.050
|
$19.900
|
$52.020
|
$22.800
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
275.000
|
$13.600
|
$10.400
|
$9.910
|
$4.940
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
665.000
|
$20.120
|
$16.750
|
$25.090
|
$36.390
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
100.000
|
$12.560
|
$13.250
|
$13.490
|
$9.090
|
|
|
CONDT (RM) (2")
|
LF
|
245.000
|
$20.300
|
$26.900
|
$18.930
|
$60.680
|
|
|
CONDT (RM) (3")
|
LF
|
1,165.000
|
$29.070
|
$51.450
|
$41.810
|
$37.230
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
38,120.000
|
$0.700
|
$0.620
|
$0.800
|
$0.710
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,520.000
|
$0.940
|
$0.750
|
$1.000
|
$0.850
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,525.000
|
$1.280
|
$0.850
|
$1.100
|
$0.990
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
835.000
|
$1.520
|
$1.550
|
$1.550
|
$1.230
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
1,670.000
|
$1.620
|
$1.700
|
$1.590
|
$1.410
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
7,435.000
|
$2.910
|
$1.650
|
$1.810
|
$1.610
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
21,535.000
|
$2.920
|
$1.850
|
$1.870
|
$1.830
|
|
|
TRAY CABLE (3 CONDR) (10 AWG)
|
LF
|
6,240.000
|
$2.000
|
$2.400
|
$1.910
|
$1.330
|
|
|
GROUND BOX TY A (122311)
|
EA
|
43.000
|
$750.000
|
$534.000
|
$430.530
|
$920.880
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
9.000
|
$4,839.660
|
$2,787.000
|
$3,544.210
|
$3,228.170
|
|
|
INS OH SN SUP(25 FT BAL TEE)
|
EA
|
2.000
|
$17,000.000
|
$17,605.000
|
$17,503.940
|
$20,120.470
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$25,000.000
|
$19,855.000
|
$19,887.320
|
$22,549.110
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
75.000
|
$140.000
|
$234.000
|
$299.790
|
$263.300
|
|
|
PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,944.190
|
$1,857.000
|
$3,156.470
|
$3,877.610
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$16,705.000
|
$15,115.000
|
$13,076.630
|
$49,343.550
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
50,695.000
|
$1.720
|
$2.200
|
$3.150
|
$0.710
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
36,215.000
|
$4.440
|
$3.050
|
$4.180
|
$2.260
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
5.000
|
$11,749.070
|
$5,573.000
|
$1,451.280
|
$326.950
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
492.000
|
$25.000
|
$17.150
|
$30.340
|
$44.280
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
9.000
|
$9,794.090
|
$14,120.000
|
$8,396.180
|
$8,779.190
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
10,920.000
|
$12.870
|
$10.850
|
$13.760
|
$22.710
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
240.000
|
$30.250
|
$21.800
|
$125.910
|
$34.330
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
1,165.000
|
$55.140
|
$63.550
|
$68.060
|
$66.870
|
|
|
COMMUNICATION HUB BUILDING
|
EA
|
3.000
|
$15,000.000
|
$27,745.000
|
$26,500.210
|
$40,140.350
|
|
|
CONDUIT (PREPARE)
|
LF
|
85,370.000
|
$1.210
|
$0.460
|
$1.090
|
$1.440
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
3.000
|
$17,313.580
|
$13,150.000
|
$7,831.110
|
$17,066.630
|
|
|
RADAR VEHICLE SENSING DEVICE
|
EA
|
2.000
|
$9,048.070
|
$9,345.000
|
$7,967.860
|
$7,225.820
|
|
|
CTMS RELOCATION (MVD)
|
EA
|
1.000
|
$7,500.000
|
$3,605.000
|
$1,686.070
|
$13,225.290
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
9.000
|
$1,425.000
|
$1,375.000
|
$1,238.350
|
$1,455.450
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
9.000
|
$1,425.000
|
$1,375.000
|
$1,238.350
|
$1,455.450
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
9.000
|
$14,000.000
|
$15,973.000
|
$17,078.060
|
$18,829.230
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
9.000
|
$5,726.410
|
$7,620.000
|
$5,578.010
|
$6,913.220
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
10.000
|
$2,205.440
|
$2,685.000
|
$2,671.270
|
$3,516.720
|
|
Totals: |
$1,878,041.060
|
$1,782,760.650
|
$2,124,296.840
|
$2,247,054.030
|